# WP-0008-T05 Go-Live — first real Phase: info-tech-canon **Date:** 2026-08-05 **Decision:** Maintainer accepted `workplans/TREV-WP-0008-governance-and-pilot-rollout.md` T05. **First declared Phase:** `trsl:phase:info-tech-canon-service-surface` **Declaring repo:** `coulomb/info-tech-canon` (Forgejo id 47) This is the single recorded go-live moment the gate existed to create — not "infrastructure is ready," but **a named Phase is authorized and declared**. --- ## 1. Pilot scope covered by the alpha/beta legal waiver Per `SCOPE.md` §1, full specialist legal review of TRSL/CUA V1C1 is deferred until the framework moves out of beta. T05 acceptance confirms that this waiver covers the following **pilot scope** only: | Dimension | Pilot scope | | --- | --- | | Licensor | Binky Hedgehog GmbH / Trust Service tenant `binky` (`specs/TRSL-Governance.md` §1) | | First Phase | `trsl:phase:info-tech-canon-service-surface` on `coulomb/info-tech-canon` only | | Legal text | TRSL V1C1 + CUA V1C1 as preliminary candidates under the existing alpha/beta working defaults (`history/260729-TRSL-Jurisdiction-Synthesis.md` §3, `history/260729-TREN-Synthesis.md`) — governing law/arbitration, liability cap, data protection, Enforcement Network fee mechanics as synthesized, not as counsel-finalized production terms | | Commercial activity | Development Credit may be tracked for this Phase; Commercial Entitlements under this Phase may be granted only under the same alpha/beta risk acceptance | | External contributions | **Still blocked** — CLA remains draft (`specs/TRSL-ContributorLicenseAgreement-Draft.md`); `CONTRIBUTING.md` external-contribution block remains in force until CLA is separately accepted | | Other product lines | **Not** authorized by this T05 acceptance. `net-kingdom`, `railiance-vergabe-teilnahme`, and any further Phases each need an explicit follow-on declaration (same process; not a second T05 gate for the framework, but a deliberate Phase-by-Phase act) | This is **not** a waiver of all risk forever, and **not** production legal finality. It is a bounded pilot under known, already-documented alpha/beta defaults. --- ## 2. Preconditions re-confirmed at acceptance | Precondition | Status at go-live | | --- | --- | | WP-0004 / WP-0005 T10 syntheses | Done 2026-07-29 | | Legal review waiver + pilot scope (this document §1) | Accepted 2026-08-05 | | Licensor identity | Binky Hedgehog GmbH / `binky` | | Hosted Trust Service software (WP-0006) | Done; pilot instance registered below | | Draft survey + candidates (T02/T03) | Done; first live Phase is the former dry-run candidate | | CLA | Draft only; external contribs remain blocked | | Org-wide TRSL LICENSE text adoption | Already done 2026-07-30; `info-tech-canon` already carried TRSL V1C1 at go-live (no MIT-0 replacement step remained) | --- ## 3. Phase parameters (declared) | Field | Value | | --- | --- | | `phase.id` | `trsl:phase:info-tech-canon-service-surface` | | Milestone | `info-tech-canon-service-surface-v1 (ITC-WP-0001..0012)` | | `source_revision` | `bd656d45165db3e49b971850d7d9487d41c76cc5` | | Repo | `forgejo-coulomb` / id 47 / `coulomb/info-tech-canon` | | Initial Target | **141,800 EUR** | | Target Multiple | 100 (Product-defining) | | Future License | MIT | | Degeneration policy | `trsl:policy:linear-longstop-v0@1.0` | | Longstop | 2029-01-01T00:00:00Z | | Extension | `trsl:extension:development-license@1.0` | **Initial Target caveat:** figure is the effort-calculator output from `history/260730-EffortCalculator-CandidateApplication.md` §4, which carries a sanity-check warning (12 finished workplans / 51 tasks vs ~1.42 raw days — likely under-count). Accepted for pilot as the transparent calculator figure rather than a silent manual override; a versioned correction remains available if pilot experience shows the target is unworkable. **Repo-local durable copy:** `info-tech-canon/trf/phase-service-surface.json` (committed in that repo). --- ## 4. Trust Service registration (pilot instance) Production reef deployment (`revenue.coulomb.social`, WP-0011) was **not** ready at go-live. Registration used a dedicated **local pilot Trust Service** instance so the Phase is live in a real Postgres-backed ledger from day one, not merely a git file: | Item | Value | | --- | --- | | Trust Service API (initial) | `http://127.0.0.1:8765` (local pilot; used only until public deploy) | | Trust Service API (**POR, 2026-08-05 later same day**) | `https://revenue.coulomb.social` (railiance01; WP-0011 T05) | | Control Plane | `https://revenue.coulomb.social/ui/` | | Postgres (POR) | CNPG `target-revenue-pg` in namespace `target-revenue` | | Licensor credential | `binky` / label `founding-admin` (token in `~/.config/target-revenue/revenue-coulomb-binky.token`, never committed) | | Registration time (t0) on POR | 2026-08-05T15:55:52Z (public re-registration; local pilot ledger was empty) | | Extension registered | `trsl:extension:development-license@1.0` | | Ledger at registration | empty; Outstanding Target = 141,800 EUR | Git-committed Manifest remains the durable declaration (`specs/TrustServiceOnboarding.md` §1). Public Trust Service is the live ledger authority after WP-0011 T05. --- ## 5. Explicitly not done by this go-live - Selling Commercial Entitlements at scale or marketing TRSL as production-final legal text - Accepting external contributions into the governed Milestone Release - Declaring Phases for `net-kingdom`, `railiance-*`, or any other repo - Deploying Trust Service / Control Plane to Railiance (`WP-0011`) - Accepting the CLA draft --- ## 6. How to verify offline ```bash # From target-revenue: python scripts/trf_onboard.py validate ../info-tech-canon/trf/phase-service-surface.json python scripts/trf_onboard.py status \ --url http://127.0.0.1:8765 \ --phase-id trsl:phase:info-tech-canon-service-surface ```