# Target Revenue Framework — SCOPE **Status:** Living document for Stage 0 **Authority:** Describes what is actually in design or delivery *now*. **Counterpart:** [`INTENT.md`](INTENT.md) is stable and aspirational. A gap between INTENT and this file is expected and is a maturity signal, not a defect. **Last updated:** 2026-07-28 **Basis:** SWOT recommendations in `history/260728-SWOT-Assessment.md` --- ## 1. Current maturity | Label | Meaning | | --- | --- | | **Stage 0** | Concept consolidated; product/tech orientation specs exist; no production legal text; no production Trust Service | | Trust Service federation | Stages 1–6 from concept §15 are **out of current delivery scope** (design readiness only) | | Legal TRSL | Research and non-binding draft skeleton only; specialist review required before any real Phase | --- ## 2. In scope now ### Documentation and specification - Maintain INTENT, this SCOPE, concept, PRD, TSD, and working defaults. - Extract normative core artifacts (PRD Roadmap Phase 1): - `specs/TargetRevenueFrameworkCore.md` - `specs/PhaseManifestSpecification.md` - `specs/TargetLedgerSpecification.md` - Prior-art research (archived under `history/260729-TRSL-*.md`) and non-binding `TargetRevenueSourceLicense-V1C1.md` and `TargetRevenueCommercialUseAgreement-V1C1.md` candidates (WP-0001). - Provisional answers to conversion-critical open questions (`specs/OpenQuestions-WorkingDefaults.md`). - Degeneration policy research artifact (recommended default for Stage 0 pilots). - Canonical monetization profiles as documentation (defaults + examples). - Lightweight contributor policy (`CONTRIBUTING.md`). ### Runnable specification foundation (not a hosted service) - Machine-readable schemas for Phase Manifest, Ledger Entry, Extension Contract, Conversion Attestation. - Pure, deterministic Outstanding Target fold and offline conformance validators. - Golden Phase package under `examples/` (concept §23 numbers). - Optional thin library/CLI for `validate` / `fold` — **no** requirement for multi-tenant hosting, auth productization, or federation protocol. ### Work system - Hub-linked workplans, progress events, and consistency sync for this repo. --- ## 3. Explicitly out of scope now | Item | Deferred to | | --- | --- | | Production Trust Service (registries, hosted ledger API, metrics product) | After Phase 1 normative docs + schema foundation; dedicated Trust Service PRD | | Finalized legal license text and commercial agreements | Specialist legal review post draft skeleton | | Final degeneration formula as irreversible norm | Research + pilot learning | | Federation Stage 2+ (replication, multi-operator, multi-authority) | PRD Roadmap Phase 6 | | Multi-stakeholder governance institutions | PRD Roadmap Phase 7 (lightweight draft only if needed) | | Tax / statutory revenue recognition | Permanently out of framework core (INTENT boundaries) | | Governing third-party product Phases in production | After legal + Stage 0 package ready | | Accepting external code into a governed Milestone Release | Until contributor-rights instrument exists | --- ## 4. Sequencing rules (binding for workplans) These rules implement SWOT I-05 / I-06 and the PRD roadmap order: 1. **Normative extraction (WP-0003) and prior-art research (WP-0001)** proceed in parallel with **schema + pure fold + golden fixture (WP-0002)**. 2. **Full Trust Service implementation** (Phase Registry service, hosted append API, Metrics product, multi-user operation) **must not** start until: - WP-0003 core extract deliverables exist (or are explicitly waived by human decision), and - Working defaults for Longstop, currency, recognition, and minimum evidence are published. 3. **Human accept gates** (recorded in the workplan or a decision note) are required before treating as done: - WP-0001-T06 TRSL draft skeleton (legal-sensitive), - WP-0002 stack/library ADR (if technology is locked), - Any promotion of working defaults into normative core language. 4. New monetization ideas land as **profiles/extensions**, not core terms, unless they pass the complexity budget (universal / interoperable / trust-critical). --- ## 5. Stage 0 “done enough” signal Stage 0 package is acceptable when: 1. A newcomer can explain the five-verb lifecycle from README + core doc alone. 2. Offline tools validate a golden Phase and recompute Outstanding Target to zero with no network service. 3. Open questions have provisional defaults or explicit “blocked on legal/research” labels. 4. WP-0001 research artifact exists; legal draft is marked non-binding and not used in production. 5. This SCOPE honestly states what is not yet claimed. --- ## 6. Change policy Update this file when Stage 0 boundaries change (e.g. first hosted Trust Service pilot authorized, first legal review complete). Do **not** weaken INTENT to match short-term delivery; expand SCOPE when INTENT milestones become active work.