--- policy_id: trsl:policy:linear-longstop-v0@1.0 title: Linear Longstop v0 --- # Linear Longstop v0 Adopted 2026-07-29 (`workplans/TREV-WP-0007-degeneration-policy-and-canonical-profiles.md` T02, maintainer-accepted): confirmed as the v1 norm for the first pilot cohort, not merely a Stage 0 pilot placeholder. ## Definition - Remission accrues **only** by time toward a declared **Longstop Date** (`specs/OpenQuestions-WorkingDefaults.md` Q8). - Between Phase activation `t0` and Longstop `tL`, R(t) = T0 × clamp((t − t0)/(tL − t0), 0, 1) with discrete ledger `remission-credit` entries computed on a published schedule (e.g. daily or monthly UTC), **or** a single full remission at longstop for minimal implementations. - Development Credit does not change the remission schedule in v0 (no progress-sensitive boost/pause). ## Status Not yet automated — see `workplans/TREV-WP-0013-remission-credit-automation.md`. Nothing in this codebase currently computes or writes these entries; this file is the formula those entries must be checkable against once that workplan lands. ## Superseded / next iteration `specs/TargetDegenerationPolicyResearch.md` (T01) proposes a candidate `trsl:policy:progress-paused-longstop-v1` (a 90-day rolling "quiet period" pause on Remission Credit during active Development Credit periods), research complete but **not adopted**. Explicitly recommends *not* adopting a diversity-of-payers factor (no gaming-resistant signal exists yet). Named as the next iteration, to be revisited once real pilot Development Credit data exists — not required before pilot Phases proceed under v0.