| Gate | Owner/route | Non-secret evidence to collect | Next action |
| --- | --- | --- | --- |
| State Hub pragmatic cutover | Custodian operator approval; `CUST-WP-0011-T07` | Final dump id/time, row-count comparison, chosen private endpoint, stabilization notes | Approve freeze/final restore and make railiance01 State Hub primary, or leave WSL2 primary explicitly. |
| State Hub fallback retirement | Custodian/operator approval; `CUST-WP-0038-T08` | HA failover drill id, restore drill id, stabilization pass | Keep deferred until after HA drills; do not retire WSL2 fallback early. |
| Inter-Hub ops-hub bootstrap | `inter-hub-bootstrap-ssh`, `openbao-api-key`, `ssh-cert-host-access` as needed | Hub id, manifest id, widget count, runtime key prefix only, smoke result | Legacy/fallback only. Prefer Core Hub deployed smoke; run attended Inter-Hub bootstrap only by explicit operator supersede/rollback decision. |
| Ops-hub runtime evidence key | `openbao-api-key` / OpenBao custody | OpenBao path/version or populated key count, event smoke id | Do not materialize legacy `OPS_HUB_KEY` until a deployed Core Hub smoke or explicit legacy Inter-Hub smoke is ready to use it. |
| Daily-triage live proof | activity-core deploy/runtime operator | State Hub `daily_triage` id, output-valid or partial/quarantine status, working-memory path | Bank the 2026-06-28 / 2026-06-29 / 2026-06-30 clean streak, then have the activity-core owner land/sync the in-flight WP-0016 diagnostics and prove bounded top-N plus graceful-degradation smoke. |
| activity-core to issue-core | route `activity-core-issue-sink` | `actcore-runtime-secret` has key, activity-core points to issue-core port `8765`, HTTP 201, Gitea issue id | Inject `ISSUE_CORE_API_KEY` through approved custody, set REST sink env, restart/sync, run safe emission. |
| Forgejo production design | Forgejo/operator decisions plus OpenBao/KeyCape/ops-bridge routes as needed | Decision id, SMTP smoke, backup/restore drill, package/action smoke, cutover approval id | Resolve T02 production choices before any production cutover work. |
| State Hub | Pragmatic railiance01 path has image, manifests, empty deploy, migrations, restored WSL2 data, row-count comparison, and healthy API through `CUST-WP-0011-T06`. | `CUST-WP-0011-T07` cutover approval, then stabilization; HA path stays deferred. |
| ops-hub evidence | `CUST-WP-0025-T14` is done with the Core Hub ops evidence contract spec. `CUST-WP-0025-T13` through `T19` now use Core Hub API/CLI/UI gates; `CUST-WP-0047` and `CUST-WP-0049` remain legacy/fallback records. | Execute `CUST-WP-0025-T16`, `T17`, and `T18`; close legacy Inter-Hub waits only through deployed Core Hub evidence or explicit supersede decision. |
| issue-core | ArgoCD service is healthy on port `8765`; image `0.2.1`; ExternalSecret Ready; authenticated smoke created Gitea issue `175`. | activity-core still needs `ISSUE_CORE_API_KEY`, URL port `8765`, `ISSUE_SINK_TYPE=rest`, and a safe emission smoke. |
| Forgejo | Migration inventory/design lane is active but pre-cutover. | Production design decisions, SMTP/email recovery, package registry, Actions, backup/restore, migration drill, cutover approval. |
| artifact-store | D7.1 is done; D7.2 has an opt-in live MinIO compatibility harness and manual smoke docs. No live secret handoff is recorded. | Run D7.2 against an approved MinIO-compatible endpoint, then route D7.3 STS vending through identity/platform custody before changing credential behavior. |
| secrets-engine | `SECRETS-WP-0004` is finished: the scoped `warden-sign` lane supported the vault-backed policy-gate smoke without exposing token material. `SECRETS-WP-0003` remains active for the real whynot-design npm publish pilot. | Finish or park `SECRETS-WP-0003` behind Gitea bot/package-token provisioning, OpenBao custody, ops-warden route confirmation, and real package publish evidence. |
| FOS hub | Old NK-WP-0001 Keycloak prerequisite is cancelled; NK-WP-0002 local identity, IAM Profile v0.2, the Core Hub FastAPI IAM Profile integration test, and Core Hub operator UI first screens are done; hub-core extraction/dev-hub work is done; CUST-WP-0025 Phase 3 has been rewritten for Core Hub. | Execute the remaining Core Hub deployed evidence and cutover gates: `CUST-WP-0025-T16` and `T17`. |