finish three custodian workplans from live hub evidence
Close CUST-WP-0064 after the 2026-08-24 unassisted fire ingested clay-borg, close CUST-WP-0065 now that all 120 active repos project a classification, and close ADHOC-2026-08-25. Mark CUST-WP-0067 T02/T10 done (reverse relays already gone; work-record recovery lives on 0068). Park the later no-checkout SBOM regression as CUST-IN-0015. Teach the classification gate to use this host's checkout path.
This commit is contained in:
parent
349238cf8f
commit
93b8174abd
8 changed files with 143 additions and 21 deletions
|
|
@ -7,7 +7,7 @@ repo: the-custodian
|
|||
status: active
|
||||
owner: codex
|
||||
created: "2026-08-24"
|
||||
updated: "2026-08-24"
|
||||
updated: "2026-08-28"
|
||||
quality_dor: DoR-Ok
|
||||
quality_dor_at: "2026-08-24"
|
||||
quality_dor_by: codex
|
||||
|
|
@ -104,7 +104,7 @@ the live API.
|
|||
|
||||
```task
|
||||
id: CUST-WP-0067-T02
|
||||
status: progress
|
||||
status: done
|
||||
priority: high
|
||||
state_hub_task_id: "4093e928-d752-5a91-96c3-2e80f0e1dac5"
|
||||
```
|
||||
|
|
@ -161,6 +161,14 @@ any repo and was blocked in-session; the change and its sequencing constraint
|
|||
are recorded in `docs/recovery/tunnels-yaml-proposed-changes-CUST-WP-0067.md`.
|
||||
Remote agents and the documented port map must be repointed *before* removal.
|
||||
|
||||
**Done (2026-08-28):** both reverse relays are gone from
|
||||
`~/.config/bridge/tunnels.yaml` and from `bridge status`. The only
|
||||
`state-hub-*` tunnel is `state-hub-primary` (`direction: local`,
|
||||
`127.0.0.1:8000` → cluster `10.43.68.154:8000`). Live check: one listener on
|
||||
8000, it is `ssh`, and `/state/health` reports `instance_role=primary`
|
||||
(`railiance01`). Local uvicorn is not running. Cache Postgres
|
||||
`infra-postgres-1` is still up on purpose until `CUST-WP-0068-T08`.
|
||||
|
||||
## Make the hub target explicit and unspoofable
|
||||
|
||||
```task
|
||||
|
|
@ -650,7 +658,7 @@ their classification later, with no separate backfill path to write or trust.
|
|||
|
||||
```task
|
||||
id: CUST-WP-0067-T10
|
||||
status: todo
|
||||
status: done
|
||||
priority: high
|
||||
state_hub_task_id: "509414a4-dee9-5892-96ab-eab8f85982c8"
|
||||
```
|
||||
|
|
@ -731,3 +739,6 @@ It is a content-conformance pass, an identifier decision overlapping
|
|||
`RMGR-WP-0005`, an orphan disposition, and a per-repository unblocking pass —
|
||||
across ~40 repositories, several needing owner judgement. The mechanical share
|
||||
is done.
|
||||
|
||||
**Done (2026-08-25, recorded 2026-08-28):** promoted to `CUST-WP-0068`. This
|
||||
task's remaining work is that workplan; it is not tracked twice.
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue