@ -23,20 +23,29 @@ utility; Railiance Fabric’s hosted authority still adds prerequisite work.
|
|||
flags still require source/residual disposition; none was cleared by counting
|
||||
it as completed. [Correction evidence](2026-09-08-helixforge-factory/human-flag-corrections.json).
|
||||
|
||||
The dedicated local project is
|
||||
[/home/worsch/prj-helixforge-factory](/home/worsch/prj-helixforge-factory/README.md).
|
||||
The dedicated private project is published at
|
||||
[prj-helixforge-factory](https://forgejo.coulomb.social/coulomb/prj-helixforge-factory),
|
||||
with [local source](/home/worsch/prj-helixforge-factory/README.md).
|
||||
It contains the accepted source-backed decision HFACT-DEC-2026-001, current
|
||||
workplan, ten exact owner-return records, delivery evidence and an empty
|
||||
measurement ledger. Hub decision receipt: `21159693-04b7-485e-bbab-1ed8f65aab43`.
|
||||
The original staged packet is frozen pending project publication.
|
||||
The original staged packet has been replaced with a pointer, preserving its Git
|
||||
history. State Hub registration returned repository UUID
|
||||
`99cc4689-9f73-42a2-9cca-d2e235393014` under the helix-forge topic.
|
||||
|
||||
## Remaining gates
|
||||
|
||||
Project creation needs the routed Forgejo admin API credential, which currently
|
||||
has no caller OpenBao login. Organization push-to-create is disabled. The same
|
||||
login can record both already-integrated PRs as manually merged; the PR metadata
|
||||
still says open, although the tested source is on main. There is no secret-value
|
||||
request or additional token provision in this handoff.
|
||||
The routed OpenBao login completed. Both already-integrated PRs now report
|
||||
closed/merged with the exact reviewed commit. Forgejo initially refused the
|
||||
disabled manual-merge style; it was enabled only for each metadata operation and
|
||||
restored to disabled. Current main ancestry was verified before the operations.
|
||||
Non-secret [publication receipts](https://forgejo.coulomb.social/coulomb/prj-helixforge-factory/src/branch/main/evidence/pr-merge-receipts.json)
|
||||
are retained in the project.
|
||||
|
||||
The credential proxy reported flex-auth unavailable and its configured
|
||||
unknown-zone fail-open behavior during this attended publication. HFACT-WP-0001-T03
|
||||
retains live policy availability and authorization-negative verification before
|
||||
governed execution acceptance. Login success is not that enforcement proof.
|
||||
|
||||
The workplan retains exact native credential/approval/audit receipts through
|
||||
GLAS-WP-0015, protected runtime placement, natural worker claim/heartbeat/close,
|
||||
|
|
@ -48,3 +57,43 @@ has no consistency failures; historical warnings remain. Reuse-surface has three
|
|||
archived null-ID failures (REUSE-WP-0017/0018/0019), separate from the successfully
|
||||
registered new plan. HFACT-WP-0001-T02 retains their disposition; CUST-IN-0017
|
||||
continues to own the pre-existing Custodian historical consistency issues.
|
||||
|
||||
## Efficiency gains already evidenced
|
||||
|
||||
| Change | Evidence and practical effect |
|
||||
| --- | --- |
|
||||
| Reuse before implementation | vergabe-teilnahme consumed the existing hosted registry with 65 capabilities and a dated, hashed snapshot. Source freshness and completeness checks prevent an unavailable registry from silently authorizing new work. No second registry was built. |
|
||||
| Repeatable release checks | 208 provider tests and 82 customer application tests passed; application tests and migration checks now run before customer image publication. Two actual release defects were found and fixed: missing source templates and missing runner BuildKit support. |
|
||||
| Less duplicate CI | Application checks run for PR updates and main, without an additional feature-branch push trigger duplicating the PR run. Main release validation remains explicit. |
|
||||
| Less review-queue noise | Four completed tasks with explicit published `needs_human: false` were corrected in the Hub. The flagged queue fell from 19 to 15 (21%); the two nonterminal flagged tasks were unchanged. A fresh query after login still returned 15: 12 done, 1 cancelled, 1 todo, 1 wait. The other 13 terminal flags need source/residual review. |
|
||||
| Clearer coordination | One published project owns factory integration; implementation stays in the two product repositories. Ten dependency-return records name the supplying task, source revision, next action and required evidence. Existing GLAS-WP-0015 coordination is reused. |
|
||||
| Fewer stale open records | REUSE-WP-0022 is finished, customer source/release tasks are done, and both PRs now show merged. Customer deployment remains an explicit waiting task instead of being mixed with completed source work. |
|
||||
|
||||
These are observed improvements in discovery, validation and coordination.
|
||||
Hours saved, monetary savings and autonomous throughput have not been measured.
|
||||
The original 94-plan/264-task portfolio baseline is dated; no later fleet-wide
|
||||
count is implied by these changes. The governed-attempt ledger remains empty and
|
||||
the fourteen-day acceptance window has not started.
|
||||
|
||||
## Next execution sequence
|
||||
|
||||
1. Prepare and accept the exact G0 tenant/actor/project/profile, repository
|
||||
grants, operating owners and enforceable time/spend contract. Project
|
||||
adoption and publication are complete; unattended operating admission is open.
|
||||
2. Close the existing GLAS-WP-0015 chain: KeyCape service-client custody and
|
||||
registration, audit sender admission, deployed approval claim/consume and
|
||||
native Secrets Engine delivery. Obtain current policy allow/deny evidence.
|
||||
Protected runtime installation can advance alongside that chain.
|
||||
3. Prove the current Railiance worker's natural claim, immediate heartbeat,
|
||||
execution and accepted terminal close, including lease-loss refusal and
|
||||
durable close replay. Retain one integrated delivery item plus two prerequisite
|
||||
closures as the project's WIP limit.
|
||||
4. Use that worker for a useful accepted change; admit and deploy the tested
|
||||
vergabe-teilnahme image through its exact tenant, database, storage, access
|
||||
and rollback contract (VERGABE-WP-0018-T03). Keep Railiance Fabric in its
|
||||
existing medium-term placement work until its additional utility is needed.
|
||||
5. Complete recovery/limit drills, then measure fourteen days: at least five
|
||||
useful accepted changes across two repositories, at least 80% without
|
||||
operator repair, median handling at most 30 minutes per accepted change and
|
||||
routine operation at most 30 minutes per day. Preserve every attempt,
|
||||
failure, retry, cost and operator intervention.
|
||||
|
|
|
|||