Record capped synthetic sizing comparison and remaining coverage
This commit is contained in:
parent
b63425d85a
commit
dbf62aef47
1 changed files with 25 additions and 0 deletions
|
|
@ -468,3 +468,28 @@ that scenario is rejected as an allocation, not used to justify procurement.
|
|||
The cross-owner case is retained at
|
||||
`docs/changes/CUST-WP-0071/resource-control-review-handoff.json`, progress receipt
|
||||
`381ba7f7-35c6-49f4-8805-4503df060ccd`. No worker-injection service was enabled.
|
||||
|
||||
## Existing-limit synthetic comparison — 2026-10-19
|
||||
|
||||
Vergabe `bfd1a2d` retains `container-comparison.json`, compressed raw samples,
|
||||
the exact executed driver and the failed preflight beside the earlier evidence.
|
||||
The isolated application container was inspected at 1000m CPU and 1Gi memory.
|
||||
Across 180 seconds with the same two-user mix, 1552 ordinary operations and 516
|
||||
transfers completed without error. Ordinary p95 was 412ms; transfer p95 was
|
||||
158ms. Measurement coverage was complete and no OOM kill occurred. Ten focused
|
||||
tests cover failure cleanup and sampler failure; gaps now prevent conclusions.
|
||||
|
||||
Mean application CPU was 940m; 1449 of 1807 CPU periods were throttled. Sampled
|
||||
p95 of 1037m reflects sampling-period boundaries, not permission above the quota.
|
||||
Peak cgroup memory was 426MiB including page cache, which is not comparable to
|
||||
the earlier summed RSS. Separately sampled database CPU p95 was 60.63% of one
|
||||
core. The first capped preflight failed before load because an internal Docker
|
||||
bridge blocked its host-published database; cleanup and the corrected dedicated
|
||||
bridge are retained, without claiming egress isolation.
|
||||
|
||||
This meets the latency target for the tested local mix at the existing limit;
|
||||
it supports no CPU-limit increase or lower memory limit. The 60m request remains
|
||||
unvalidated under shared contention. T02 stays progress while the owner extends
|
||||
the same configurable harness with edits, startup/restart and burst phases.
|
||||
Actual deployed-release/hardware and shared-service observations remain required
|
||||
for the final allocation review; attended human acceptance remains separate.
|
||||
|
|
|
|||