Founder rulings: unmapped targets are production-tier until mapped;
an evidence lapse does not loosen the path; deprecated keeps its tier.
The contact is realm:kubernetes with no layer assigned (statute 20.3 stays
unset per ADR-0009 D4). ArgoCD on railiance01 is unverified; until the
production row has a working path, the transition rule covers every
production-tier target. Resolves the conflict gate-house noted between the
two founder records.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Option C: the gate on ADMINISTER @ realm:kubernetes is tiered by ADR-0006
readiness state. Below production-approved, activation=APPROVED by founder
plan approval; at production-approved, CONSTRUCT via ArgoCD for
external-audited evidence, direct apply only as activation=BREAK_GLASS.
rapp-policy-nexus gets a dated transition to 2026-12-21.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>