Commit graph

5 commits

Author SHA1 Message Date
codex
bc0963868a Record ArgoCD v3.5.3 core install on railiance01 (blueprint 5.6: adopt) and the exhausted-CPU finding.
All checks were successful
CI Smoke / host-smoke (push) Successful in 0s
CI Smoke / container-smoke (push) Successful in 1s
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-21 15:58:49 +02:00
codex
28bd1be8ec Record that ArgoCD is not on railiance01 (read-only check, 2026-09-21).
All checks were successful
CI Smoke / host-smoke (push) Successful in 0s
CI Smoke / container-smoke (push) Successful in 4s
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-21 15:48:29 +02:00
codex
e98dd26153 Place the whitehat namespace in the non-production tier (founder).
Some checks are pending
CI Smoke / host-smoke (push) Waiting to run
CI Smoke / container-smoke (push) Waiting to run
An explicit placement overrides the unmapped-is-production default for
that target only; it unblocks ops-mason's only bundle without loosening
the default for platform objects.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-21 15:47:36 +02:00
codex
9ba6e65654 Settle the change gate's edge cases and withdraw an unintended rail-to-layer mapping.
Some checks are pending
CI Smoke / host-smoke (push) Waiting to run
CI Smoke / container-smoke (push) Waiting to run
Founder rulings: unmapped targets are production-tier until mapped;
an evidence lapse does not loosen the path; deprecated keeps its tier.
The contact is realm:kubernetes with no layer assigned (statute 20.3 stays
unset per ADR-0009 D4). ArgoCD on railiance01 is unverified; until the
production row has a working path, the transition rule covers every
production-tier target. Resolves the conflict gate-house noted between the
two founder records.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-21 14:38:58 +02:00
codex
e3d0d13253 Record the Kubernetes change gate in Mode of Authority terms; drop bare 'operator'.
Option C: the gate on ADMINISTER @ realm:kubernetes is tiered by ADR-0006
readiness state. Below production-approved, activation=APPROVED by founder
plan approval; at production-approved, CONSTRUCT via ArgoCD for
external-audited evidence, direct apply only as activation=BREAK_GLASS.
rapp-policy-nexus gets a dated transition to 2026-12-21.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-09-21 14:07:30 +02:00