docs: mark ZONE-WP-0003 as delivered in GOAL.md
The workplan is finished; the retirement section no longer describes it as the revision still underway. Assistant: grok Assistant-Session: 01a04ceb-0745-7ae1-9e26-0d10e5d52b8b
This commit is contained in:
parent
c7f3738ee8
commit
00ffbd6dfe
1 changed files with 4 additions and 5 deletions
9
GOAL.md
9
GOAL.md
|
|
@ -69,11 +69,10 @@ runtime exists with an owner or the decision that none is needed is recorded.
|
|||
It does not reopen the no-runtime decision; it makes the retained artifacts
|
||||
truthful enough for an explicit archive-or-maintain decision.
|
||||
|
||||
`ZONE-WP-0003` is the owner-driven revision that follows from security layer
|
||||
model v0.7 being accepted. It declares the Engine/PIP layer, records the
|
||||
already-completed layer cut, and evolves the reference surface so zone facts
|
||||
can be consumed as claims. It does not add a live API, a decision surface, or
|
||||
a PEP.
|
||||
`ZONE-WP-0003` was the owner-driven revision that followed from security
|
||||
layer model v0.7 being accepted. It declared the Engine/PIP layer, recorded
|
||||
the already-completed layer cut, and mapped membership facts for a future
|
||||
request-claim. It did not add a live API, a decision surface, or a PEP.
|
||||
|
||||
## Retirement decision — 2026-08-23
|
||||
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue