The statute is accepted at v0.7; the operative form is net-kingdom/SECURITY-COMPANION.md v0.2. INTENT now declares Engine / PIP in its own voice, carries the §9.6 threat decomposition, the load-bearing heartbeat obligation, issuer and freshness on the claim, consumption as a mutation, and the custody question closed rather than held open. SCOPE.md is the first-cut boundary (nothing shipped). layer.yaml is the machine-readable declaration. The review under history/ scores intent vs scope vs the empty implementation. APPROVAL-WP-0001 sequences contracts before code and keeps consumption unimplemented until GH-WP-0002-T06. Registered with State Hub as infotech / approval-engine. Assistant: grok Assistant-Session: 01a04ceb-2057-7e20-b0f9-c282964d5dd9
34 lines
1.2 KiB
Markdown
34 lines
1.2 KiB
Markdown
<!-- custodian-brief: generated by statehub register; fix-consistency may replace this file -->
|
|
# Custodian Brief - approval-engine
|
|
|
|
**Project:** approval-engine
|
|
**Domain:** infotech
|
|
**State Hub:** http://127.0.0.1:8000
|
|
**Topic ID:** `cee7bedf-2b48-46ef-8601-006474f2ad7a`
|
|
**Layer:** Engine / PIP (statute v0.7)
|
|
|
|
## Open Workplans
|
|
|
|
### v0.7 alignment and the engine spine
|
|
|
|
Workplan file: `workplans/APPROVAL-WP-0001-v07-alignment-and-engine-spine.md`
|
|
|
|
Open tasks:
|
|
- T01 - Align declaration to the accepted statute (done)
|
|
- T02 - Publish the approval claim contract
|
|
- T03 - Specify the local transactional-outbox contract
|
|
- T04 - Declare load-bearing cadence as heartbeat or reconciliation
|
|
- T05 - Wait on consumption ordering; do not implement it
|
|
- T06 - Durable object, closed state machine, authenticated entries
|
|
- T07 - Introspection API as input claims
|
|
- T08 - Local outbox in the mutation transaction
|
|
- T09 - Canon T-06 and the FLEX-WP-0017 handoff
|
|
|
|
## Session Start
|
|
|
|
1. Read `INTENT.md`, `SCOPE.md`, `layer.yaml`, and `AGENTS.md`.
|
|
2. Check inbox: `GET /messages/?to_agent=approval-engine&unread_only=true`.
|
|
3. Scan `workplans/`.
|
|
4. Update task statuses in workplan files as work progresses.
|
|
|
|
Last generated: 2026-08-29
|