ASSEMBLY-WP-0017-T06: Census private office construction (data centers) as investment indicator L5b; T05 unblocked

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>

Assistant: claude-code
Assistant-Model: opus
Assistant-Process: 14913@bnt-lap001
Assistant-Session: add7ef69-b901-4756-9a67-34cf1125d96f
This commit is contained in:
tegwick 2026-10-13 22:09:14 +02:00
parent 932046d58d
commit 97d0fb71a9
3 changed files with 57 additions and 4 deletions

View file

@ -236,3 +236,16 @@ channel, the strength of host access rules, and frontier access.
CB2 is the observable for the access-rule strength a. At the 2026-10-13
review it gave a ≈ 0 (at most 0.006 per year).
## Investment indicator for the regime filter (ASSEMBLY-WP-0017-T06)
| ID | Indicator | Jurisdiction | Source | Access | Cadence |
|---|---|---|---|---|---|
| L5b | Private construction put in place, Office (includes data centers), SAAR | US | Census Construction Spending, `https://www.census.gov/construction/c30/xlsx/release.xlsx`, Table 1 (second "Office" row = private) | file (fixed layout; last 5 months + year-ago month) | m |
L5b is closer to organism investment than L5, which covers all
information-processing equipment. The regime filter's reliability rests on
an investment indicator (`research/ModelMatching.md` § 4.2). Hyperscaler
capital expenditure (company filings) is a second candidate, but the 2026
guidance figures conflict across sources and are not audited quarterly
values.

View file

@ -252,6 +252,38 @@
0.8519
]
]
},
"US_dc_construction": {
"indicator": "L5b",
"unit": "millions of USD, SAAR (private office construction, includes data centers)",
"source": "U.S. Census Bureau, Construction Spending release 2026-10-01 (https://www.census.gov/construction/c30/xlsx/release.xlsx), Table 1, private Office: Aug 2025, Apr-Aug 2026. Data centers are reported within Office and drive its growth (+29.8 % yoy while office proper is weak). Operator: proportional to gross organism investment; preferred over L5 for the regime filter",
"log_sigma": 0.05,
"points": [
[
0.0,
103300
],
[
0.6667,
111220
],
[
0.75,
115159
],
[
0.8333,
121940
],
[
0.9167,
128199
],
[
1.0,
134119
]
]
}
}
}

View file

@ -96,13 +96,15 @@ years (`matching.py --synthetic`). Add the criteria as a slow test.
```task
id: ASSEMBLY-WP-0017-T05
status: wait
status: todo
priority: medium
state_hub_task_id: "93477fd0-6d90-51dd-a41a-75a22715bf29"
```
Waits for T06 (T04 passed, but the result rests on an AI-specific investment
series). Then run matching at every full checkpoint (optionally at light ones), report the current regime and any flip candidates in the
Unblocked 2026-10-13 (T04 passed, T06 provides L5b). First extend
`main_observed` to the IMM filter with the observed series (adoption, L5b,
discovery, sentiment once available), then run matching at every full
checkpoint (optionally at light ones), report the current regime and any flip candidates in the
checkpoint record, and coordinate the runner change with WP-0014 (governed
execution profile).
@ -110,11 +112,17 @@ execution profile).
```task
id: ASSEMBLY-WP-0017-T06
status: todo
status: done
priority: high
state_hub_task_id: "97f58120-60b4-5583-82b2-a227031fd989"
```
**Done 2026-10-13:** L5b, Census private Office construction (includes data
centers; +29.8 % yoy), added to `observed_series.json` (Aug 2025, Apr–Aug
2026) and to the indicator catalog. Hyperscaler capex was considered and set
aside: the 2026 figures are guidance and conflict across sources. Noise for
the filter: log sd 0.05, as tested.
The filter's reliability rests on investment (without it, false flips are 5 of
6). L5 covers all information-processing equipment. Find and wire a series
closer to organism investment, for example hyperscaler capital expenditure