CB-WP-0006: instrument the acceptance table, then implement
Scoped to what CB-WP-0005 T02 measured rather than what CB-RES-0004
predicted. The survey diagnosed three absent kernel rules; M-D1-MUT found
that 8 of 14 acceptance rows have no instrument behind them at all.
Phase A instruments the unmeasured rows, starting with AM-6 — nothing in
the workspace compares any number to 100,000 events/s, the project's
headline throughput claim, reported as "met, 16.5x". Phase B carries the
kernel work deferred unstarted from CB-WP-0005 Phase C. That order is the
point: the previous pass built a fix before its instrument existed and
the instrument then contradicted the fix's premise.
T01 names its own trap up front: a timing assertion in CI is flaky by
nature and the usual response is to loosen it until it never fires, which
would reproduce exactly the defect being fixed. The threshold is pinned
far below measured, states its headroom in the failure message, and
loosening requires an ADR.
T04 notes an incentive worth blocking early: ADR-0005 predicts own-source
growth from Phase B, so AM-4c will move against us. Setting its threshold
after seeing that movement is the retarget InnerLoop §Step 4 forbids, so
it is set before Phase B or not at all.
T09 asks the question this pass is positioned to answer: M-D1-MUT does
not remove a manual path — writing a weak mutation is exactly as easy as
writing a strong one and the harness cannot tell them apart. CB-WP-0005
produced two no-op mutations on its first attempt, so the failure mode is
demonstrated. And it fails in the dangerous direction: a weak mutation
does not miss a defect, it indicts working code.
CB-WP-0005 T04-T06 are marked deferred rather than deleted, with their
analysis intact, so the trail from prediction to contradiction to re-plan
stays readable.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-31 17:55:46 +02:00
|
|
|
|
---
|
|
|
|
|
|
id: CB-WP-0006
|
|
|
|
|
|
title: "Instrument the acceptance table, then implement what it exposes"
|
2026-07-31 18:25:11 +02:00
|
|
|
|
status: in_progress
|
2026-07-31 17:56:55 +02:00
|
|
|
|
state_hub_workstream_id: "8a6327cc-fd5c-4e2c-a29b-b437c27d1e71"
|
CB-WP-0006: instrument the acceptance table, then implement
Scoped to what CB-WP-0005 T02 measured rather than what CB-RES-0004
predicted. The survey diagnosed three absent kernel rules; M-D1-MUT found
that 8 of 14 acceptance rows have no instrument behind them at all.
Phase A instruments the unmeasured rows, starting with AM-6 — nothing in
the workspace compares any number to 100,000 events/s, the project's
headline throughput claim, reported as "met, 16.5x". Phase B carries the
kernel work deferred unstarted from CB-WP-0005 Phase C. That order is the
point: the previous pass built a fix before its instrument existed and
the instrument then contradicted the fix's premise.
T01 names its own trap up front: a timing assertion in CI is flaky by
nature and the usual response is to loosen it until it never fires, which
would reproduce exactly the defect being fixed. The threshold is pinned
far below measured, states its headroom in the failure message, and
loosening requires an ADR.
T04 notes an incentive worth blocking early: ADR-0005 predicts own-source
growth from Phase B, so AM-4c will move against us. Setting its threshold
after seeing that movement is the retarget InnerLoop §Step 4 forbids, so
it is set before Phase B or not at all.
T09 asks the question this pass is positioned to answer: M-D1-MUT does
not remove a manual path — writing a weak mutation is exactly as easy as
writing a strong one and the harness cannot tell them apart. CB-WP-0005
produced two no-op mutations on its first attempt, so the failure mode is
demonstrated. And it fails in the dangerous direction: a weak mutation
does not miss a defect, it indicts working code.
CB-WP-0005 T04-T06 are marked deferred rather than deleted, with their
analysis intact, so the trail from prediction to contradiction to re-plan
stays readable.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-31 17:55:46 +02:00
|
|
|
|
---
|
|
|
|
|
|
|
|
|
|
|
|
# Purpose
|
|
|
|
|
|
|
|
|
|
|
|
CB-WP-0005 T02 measured M-D1-MUT for the first time:
|
|
|
|
|
|
|
|
|
|
|
|
```text
|
|
|
|
|
|
M-D1-MUT: 4/14 rows enforced
|
|
|
|
|
|
PARTIAL 2 (AM-7, AM-8 — some clauses live, some inert)
|
|
|
|
|
|
unmutatable 8 (no property to invert)
|
|
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
**4 of 14, against a predicted 10 of 14.** The prediction was wrong by
|
|
|
|
|
|
2.5×, and wrong about *what* as well as *how much*: CB-RES-0004 diagnosed
|
|
|
|
|
|
three absent kernel rules, and the measurement found that **more than half
|
|
|
|
|
|
the acceptance table has no instrument behind it at all**.
|
|
|
|
|
|
|
|
|
|
|
|
CB-WP-0005 Phase C was deferred before starting on that basis (T02's stop
|
|
|
|
|
|
condition, maintainer decision 2026-07-31). It was scoped to five rules —
|
|
|
|
|
|
K9, K10, K11, K14, K18 — which does not address the eight.
|
|
|
|
|
|
|
|
|
|
|
|
This workplan is scoped to what was measured rather than what was
|
|
|
|
|
|
predicted. **Phase A instruments the unmeasured rows; Phase B implements
|
|
|
|
|
|
the kernel work inherited from CB-WP-0005 T04–T06.** That order is the
|
|
|
|
|
|
whole point: the previous pass built a fix before its instrument existed,
|
|
|
|
|
|
and the instrument then contradicted the fix's premise.
|
|
|
|
|
|
|
|
|
|
|
|
Per InnerLoop §Step 4, no target moves in the commit that measures it.
|
|
|
|
|
|
|
|
|
|
|
|
## Phase A — instrument the rows that measure nothing
|
|
|
|
|
|
|
|
|
|
|
|
## Task: AM-6 — assert the throughput target
|
|
|
|
|
|
|
|
|
|
|
|
```task
|
|
|
|
|
|
id: CB-WP-0006-T01
|
2026-07-31 18:25:11 +02:00
|
|
|
|
status: progress
|
CB-WP-0006: instrument the acceptance table, then implement
Scoped to what CB-WP-0005 T02 measured rather than what CB-RES-0004
predicted. The survey diagnosed three absent kernel rules; M-D1-MUT found
that 8 of 14 acceptance rows have no instrument behind them at all.
Phase A instruments the unmeasured rows, starting with AM-6 — nothing in
the workspace compares any number to 100,000 events/s, the project's
headline throughput claim, reported as "met, 16.5x". Phase B carries the
kernel work deferred unstarted from CB-WP-0005 Phase C. That order is the
point: the previous pass built a fix before its instrument existed and
the instrument then contradicted the fix's premise.
T01 names its own trap up front: a timing assertion in CI is flaky by
nature and the usual response is to loosen it until it never fires, which
would reproduce exactly the defect being fixed. The threshold is pinned
far below measured, states its headroom in the failure message, and
loosening requires an ADR.
T04 notes an incentive worth blocking early: ADR-0005 predicts own-source
growth from Phase B, so AM-4c will move against us. Setting its threshold
after seeing that movement is the retarget InnerLoop §Step 4 forbids, so
it is set before Phase B or not at all.
T09 asks the question this pass is positioned to answer: M-D1-MUT does
not remove a manual path — writing a weak mutation is exactly as easy as
writing a strong one and the harness cannot tell them apart. CB-WP-0005
produced two no-op mutations on its first attempt, so the failure mode is
demonstrated. And it fails in the dangerous direction: a weak mutation
does not miss a defect, it indicts working code.
CB-WP-0005 T04-T06 are marked deferred rather than deleted, with their
analysis intact, so the trail from prediction to contradiction to re-plan
stays readable.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-31 17:55:46 +02:00
|
|
|
|
priority: high
|
2026-07-31 17:56:55 +02:00
|
|
|
|
state_hub_task_id: "a4513794-2f5f-480c-be30-56658711796f"
|
CB-WP-0006: instrument the acceptance table, then implement
Scoped to what CB-WP-0005 T02 measured rather than what CB-RES-0004
predicted. The survey diagnosed three absent kernel rules; M-D1-MUT found
that 8 of 14 acceptance rows have no instrument behind them at all.
Phase A instruments the unmeasured rows, starting with AM-6 — nothing in
the workspace compares any number to 100,000 events/s, the project's
headline throughput claim, reported as "met, 16.5x". Phase B carries the
kernel work deferred unstarted from CB-WP-0005 Phase C. That order is the
point: the previous pass built a fix before its instrument existed and
the instrument then contradicted the fix's premise.
T01 names its own trap up front: a timing assertion in CI is flaky by
nature and the usual response is to loosen it until it never fires, which
would reproduce exactly the defect being fixed. The threshold is pinned
far below measured, states its headroom in the failure message, and
loosening requires an ADR.
T04 notes an incentive worth blocking early: ADR-0005 predicts own-source
growth from Phase B, so AM-4c will move against us. Setting its threshold
after seeing that movement is the retarget InnerLoop §Step 4 forbids, so
it is set before Phase B or not at all.
T09 asks the question this pass is positioned to answer: M-D1-MUT does
not remove a manual path — writing a weak mutation is exactly as easy as
writing a strong one and the harness cannot tell them apart. CB-WP-0005
produced two no-op mutations on its first attempt, so the failure mode is
demonstrated. And it fails in the dangerous direction: a weak mutation
does not miss a defect, it indicts working code.
CB-WP-0005 T04-T06 are marked deferred rather than deleted, with their
analysis intact, so the trail from prediction to contradiction to re-plan
stays readable.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-31 17:55:46 +02:00
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
The sharpest single finding of CB-WP-0005. **Nothing in the workspace
|
|
|
|
|
|
compares any number to 100,000 events/s** — the project's headline
|
|
|
|
|
|
throughput claim, reported as `met, 16.5×`. The Criterion bench emits
|
|
|
|
|
|
throughput; the only asserts in `synthetic.rs` are the stress-gate shape
|
|
|
|
|
|
and the events-per-round pin.
|
|
|
|
|
|
|
|
|
|
|
|
Deliver a standing assertion — a test, not a bench — that measures applied
|
|
|
|
|
|
events/s on the synthetic workload and fails below the AM-6 target.
|
|
|
|
|
|
|
|
|
|
|
|
**The trap, stated up front:** a timing assertion in CI is flaky by
|
|
|
|
|
|
nature, and the usual response is to loosen it until it never fires, which
|
|
|
|
|
|
would reproduce exactly the defect being fixed. So the threshold is
|
|
|
|
|
|
**pinned well below the measured 1.65M/s** (AM-6 asks for 100k), the
|
|
|
|
|
|
assertion states its own headroom in the failure message, and a loosening
|
|
|
|
|
|
requires an ADR. A gate tuned until it cannot fire is a gate that counts
|
|
|
|
|
|
names.
|
|
|
|
|
|
|
|
|
|
|
|
**Verified by:** `make mutation-check --row AM-6` goes from `unmutatable`
|
|
|
|
|
|
to `red`.
|
|
|
|
|
|
|
CB-WP-0006 T01: assert the AM-6 throughput target
Nothing in the workspace compared any number to 100,000 events/s while
the evidence file reported "AM-6 | met, 16.5x". Now a test does — a test,
not a bench, because Criterion reports throughput and asserts nothing,
which is why this row measured nothing for six passes.
Measured on bnt-lap001: 341,280 ev/s in debug (3.4x the target), ~2.4-3.1M
in release. The spec target holds even in an unoptimized build, so the
gate needs no cfg split and runs in the ordinary `make test`.
The trap this task named — loosening a flaky timing assertion until it
never fires — is avoided by construction. The threshold is the spec value,
untouched; the constant says lowering it requires an ADR; and the failure
message repeats that, states measured headroom, and names reference
figures, so an agent hitting a red AM-6 is told not to tune it in the
place they are actually reading. Robustness comes from best-of-N, not from
a lower bar: a throughput floor asks whether the machine is capable, so
transient load should not fail the build.
Two positive controls in the test: a run that applied fewer than 50,000
events, or measured zero elapsed time, fails rather than scoring as
infinite throughput.
Verified by a PROPERTY mutation — 4,000 black_box iterations injected into
GroundState::fold, the hot path — not a threshold tweak, which would only
prove the comparison runs.
And the FA class found last pass is now gated. mutation-check rows gained
an `expect` field: the mutant's output must contain the row's stated
failure string or the verdict is WRONG-REASON, not red. Without it a
mutation that merely failed to compile would credit its row with an
assertion it does not have. Verified by pointing expect at a string the
verifier never prints and watching the verdict flip. This is remedy (2)
from the CB-WP-0005 retrospective, built a task earlier than planned
because the class it guards is the newest and most dangerous.
M-D1-MUT: 4 -> 5 of 14.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-31 18:32:16 +02:00
|
|
|
|
**Delivered.** `am6_throughput_clears_the_spec_target` in
|
|
|
|
|
|
`games/ground/src/lib.rs` — a test, not a bench. Best of 3 samples of
|
|
|
|
|
|
50,000 applied events each.
|
|
|
|
|
|
|
|
|
|
|
|
Measured on bnt-lap001 2026-07-31: **341,280 ev/s in debug (3.4× the
|
|
|
|
|
|
target)**, ~2.4–3.1M in release (~24–30×). **The spec target holds even in
|
|
|
|
|
|
an unoptimized build**, so the gate needed no `cfg` split and runs in the
|
|
|
|
|
|
ordinary `make test`.
|
|
|
|
|
|
|
|
|
|
|
|
**The trap was avoided by construction, not by intention.** The threshold
|
|
|
|
|
|
is the spec value `100_000`, untouched; the constant carries a comment
|
|
|
|
|
|
saying lowering it requires an ADR; and the failure message repeats that,
|
|
|
|
|
|
states the measured headroom, and names the reference figures — so a
|
|
|
|
|
|
future agent hitting a red AM-6 is told not to tune it, in the place they
|
|
|
|
|
|
will actually be reading. Robustness comes from **best-of-N**, not from a
|
|
|
|
|
|
lower bar: a throughput *floor* asks "is this machine capable", so
|
|
|
|
|
|
transient load should not fail the build.
|
|
|
|
|
|
|
|
|
|
|
|
Two positive controls in the test itself: a run that applied fewer than
|
|
|
|
|
|
50,000 events, or measured zero elapsed time, fails rather than scoring as
|
|
|
|
|
|
infinite throughput.
|
|
|
|
|
|
|
|
|
|
|
|
**Verified:** `make mutation-check --row AM-6` → **red**, via a *property*
|
|
|
|
|
|
mutation (4,000 `black_box` iterations injected into `GroundState::fold`,
|
|
|
|
|
|
the hot path) rather than a threshold tweak — raising the target would only
|
|
|
|
|
|
prove the comparison runs.
|
|
|
|
|
|
|
|
|
|
|
|
**And the FA class is now gated.** `mutation-check` rows gained an
|
|
|
|
|
|
`expect` field: the mutant's output must contain the row's stated failure
|
|
|
|
|
|
string, or the verdict is **`WRONG-REASON`**, not `red`. Without it, a
|
|
|
|
|
|
mutation that merely failed to compile would credit its row with an
|
|
|
|
|
|
assertion it does not have. Verified by pointing `expect` at a string the
|
|
|
|
|
|
verifier never prints and confirming the verdict flips. This is
|
|
|
|
|
|
remedy (2) from the CB-WP-0005 retrospective, built one task earlier than
|
|
|
|
|
|
T08 planned because the class it guards is the newest and the most
|
|
|
|
|
|
dangerous.
|
|
|
|
|
|
|
|
|
|
|
|
**M-D1-MUT: 4 → 5 of 14.**
|
|
|
|
|
|
|
CB-WP-0006: instrument the acceptance table, then implement
Scoped to what CB-WP-0005 T02 measured rather than what CB-RES-0004
predicted. The survey diagnosed three absent kernel rules; M-D1-MUT found
that 8 of 14 acceptance rows have no instrument behind them at all.
Phase A instruments the unmeasured rows, starting with AM-6 — nothing in
the workspace compares any number to 100,000 events/s, the project's
headline throughput claim, reported as "met, 16.5x". Phase B carries the
kernel work deferred unstarted from CB-WP-0005 Phase C. That order is the
point: the previous pass built a fix before its instrument existed and
the instrument then contradicted the fix's premise.
T01 names its own trap up front: a timing assertion in CI is flaky by
nature and the usual response is to loosen it until it never fires, which
would reproduce exactly the defect being fixed. The threshold is pinned
far below measured, states its headroom in the failure message, and
loosening requires an ADR.
T04 notes an incentive worth blocking early: ADR-0005 predicts own-source
growth from Phase B, so AM-4c will move against us. Setting its threshold
after seeing that movement is the retarget InnerLoop §Step 4 forbids, so
it is set before Phase B or not at all.
T09 asks the question this pass is positioned to answer: M-D1-MUT does
not remove a manual path — writing a weak mutation is exactly as easy as
writing a strong one and the harness cannot tell them apart. CB-WP-0005
produced two no-op mutations on its first attempt, so the failure mode is
demonstrated. And it fails in the dangerous direction: a weak mutation
does not miss a defect, it indicts working code.
CB-WP-0005 T04-T06 are marked deferred rather than deleted, with their
analysis intact, so the trail from prediction to contradiction to re-plan
stays readable.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-31 17:55:46 +02:00
|
|
|
|
## Task: AM-2, AM-3 — instrument the size metrics
|
|
|
|
|
|
|
|
|
|
|
|
```task
|
|
|
|
|
|
id: CB-WP-0006-T02
|
|
|
|
|
|
status: todo
|
|
|
|
|
|
priority: medium
|
2026-07-31 17:56:55 +02:00
|
|
|
|
state_hub_task_id: "d1572a4f-46e5-49dd-b1ec-7c371a780bb7"
|
CB-WP-0006: instrument the acceptance table, then implement
Scoped to what CB-WP-0005 T02 measured rather than what CB-RES-0004
predicted. The survey diagnosed three absent kernel rules; M-D1-MUT found
that 8 of 14 acceptance rows have no instrument behind them at all.
Phase A instruments the unmeasured rows, starting with AM-6 — nothing in
the workspace compares any number to 100,000 events/s, the project's
headline throughput claim, reported as "met, 16.5x". Phase B carries the
kernel work deferred unstarted from CB-WP-0005 Phase C. That order is the
point: the previous pass built a fix before its instrument existed and
the instrument then contradicted the fix's premise.
T01 names its own trap up front: a timing assertion in CI is flaky by
nature and the usual response is to loosen it until it never fires, which
would reproduce exactly the defect being fixed. The threshold is pinned
far below measured, states its headroom in the failure message, and
loosening requires an ADR.
T04 notes an incentive worth blocking early: ADR-0005 predicts own-source
growth from Phase B, so AM-4c will move against us. Setting its threshold
after seeing that movement is the retarget InnerLoop §Step 4 forbids, so
it is set before Phase B or not at all.
T09 asks the question this pass is positioned to answer: M-D1-MUT does
not remove a manual path — writing a weak mutation is exactly as easy as
writing a strong one and the harness cannot tell them apart. CB-WP-0005
produced two no-op mutations on its first attempt, so the failure mode is
demonstrated. And it fails in the dangerous direction: a weak mutation
does not miss a defect, it indicts working code.
CB-WP-0005 T04-T06 are marked deferred rather than deleted, with their
analysis intact, so the trail from prediction to contradiction to re-plan
stays readable.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-31 17:55:46 +02:00
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
AM-2 (≤40 spec lines per rule) and AM-3 (≤50 LOC for the synthetic
|
|
|
|
|
|
workload) are both `unmutatable` for the same reason: `make loc` prints
|
|
|
|
|
|
line counts and nothing divides, compares, or gates.
|
|
|
|
|
|
|
|
|
|
|
|
AM-2 is the **anti-gaming pair** for AM-1 — 100% rule coverage means
|
|
|
|
|
|
nothing if the rules are trivially small — so an uninstrumented AM-2
|
|
|
|
|
|
leaves AM-1 gameable, which is the specific risk MetricsAndScenarios §1
|
|
|
|
|
|
names when it introduces M-D1-SPL.
|
|
|
|
|
|
|
|
|
|
|
|
AM-3 depends on K18 (benches driven from scenario files); if K18 resolves
|
|
|
|
|
|
toward amending the spec rather than implementing it, AM-3 must be
|
|
|
|
|
|
restated or withdrawn with an argument rather than left unmeasured.
|
|
|
|
|
|
|
|
|
|
|
|
## Task: AM-5, AM-9 — measure or withdraw, but stop leaving them blank
|
|
|
|
|
|
|
|
|
|
|
|
```task
|
|
|
|
|
|
id: CB-WP-0006-T03
|
|
|
|
|
|
status: todo
|
|
|
|
|
|
priority: medium
|
2026-07-31 17:56:55 +02:00
|
|
|
|
state_hub_task_id: "6c84a220-cab3-40f1-b35f-b8df79106f6e"
|
CB-WP-0006: instrument the acceptance table, then implement
Scoped to what CB-WP-0005 T02 measured rather than what CB-RES-0004
predicted. The survey diagnosed three absent kernel rules; M-D1-MUT found
that 8 of 14 acceptance rows have no instrument behind them at all.
Phase A instruments the unmeasured rows, starting with AM-6 — nothing in
the workspace compares any number to 100,000 events/s, the project's
headline throughput claim, reported as "met, 16.5x". Phase B carries the
kernel work deferred unstarted from CB-WP-0005 Phase C. That order is the
point: the previous pass built a fix before its instrument existed and
the instrument then contradicted the fix's premise.
T01 names its own trap up front: a timing assertion in CI is flaky by
nature and the usual response is to loosen it until it never fires, which
would reproduce exactly the defect being fixed. The threshold is pinned
far below measured, states its headroom in the failure message, and
loosening requires an ADR.
T04 notes an incentive worth blocking early: ADR-0005 predicts own-source
growth from Phase B, so AM-4c will move against us. Setting its threshold
after seeing that movement is the retarget InnerLoop §Step 4 forbids, so
it is set before Phase B or not at all.
T09 asks the question this pass is positioned to answer: M-D1-MUT does
not remove a manual path — writing a weak mutation is exactly as easy as
writing a strong one and the harness cannot tell them apart. CB-WP-0005
produced two no-op mutations on its first attempt, so the failure mode is
demonstrated. And it fails in the dangerous direction: a weak mutation
does not miss a defect, it indicts working code.
CB-WP-0005 T04-T06 are marked deferred rather than deleted, with their
analysis intact, so the trail from prediction to contradiction to re-plan
stays readable.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-31 17:55:46 +02:00
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
AM-5 (clean build ≤60 s) is `recorded not gated` — and not recorded
|
|
|
|
|
|
either. AM-9 (peak RSS ≤64 MB) is declared "very unlikely to bind", which
|
|
|
|
|
|
CB-EV-0001 itself calls out as an unmeasured judgment call.
|
|
|
|
|
|
|
|
|
|
|
|
Both are cheap to measure: one `time` around a clean build, one
|
|
|
|
|
|
`/usr/bin/time -v` around the 100k-event run. **Or withdraw them with an
|
|
|
|
|
|
argument**, which is a legitimate outcome and possibly the right one for
|
|
|
|
|
|
AM-5 on a machine-dependent number. What is not legitimate is a third pass
|
|
|
|
|
|
leaving them blank while the scoreboard reports elsewhere.
|
|
|
|
|
|
|
|
|
|
|
|
## Task: AM-4c — target it or drop it
|
|
|
|
|
|
|
|
|
|
|
|
```task
|
|
|
|
|
|
id: CB-WP-0006-T04
|
|
|
|
|
|
status: todo
|
|
|
|
|
|
priority: low
|
2026-07-31 17:56:55 +02:00
|
|
|
|
state_hub_task_id: "a2571314-4c02-41cf-9473-96d3ae2d7b2b"
|
CB-WP-0006: instrument the acceptance table, then implement
Scoped to what CB-WP-0005 T02 measured rather than what CB-RES-0004
predicted. The survey diagnosed three absent kernel rules; M-D1-MUT found
that 8 of 14 acceptance rows have no instrument behind them at all.
Phase A instruments the unmeasured rows, starting with AM-6 — nothing in
the workspace compares any number to 100,000 events/s, the project's
headline throughput claim, reported as "met, 16.5x". Phase B carries the
kernel work deferred unstarted from CB-WP-0005 Phase C. That order is the
point: the previous pass built a fix before its instrument existed and
the instrument then contradicted the fix's premise.
T01 names its own trap up front: a timing assertion in CI is flaky by
nature and the usual response is to loosen it until it never fires, which
would reproduce exactly the defect being fixed. The threshold is pinned
far below measured, states its headroom in the failure message, and
loosening requires an ADR.
T04 notes an incentive worth blocking early: ADR-0005 predicts own-source
growth from Phase B, so AM-4c will move against us. Setting its threshold
after seeing that movement is the retarget InnerLoop §Step 4 forbids, so
it is set before Phase B or not at all.
T09 asks the question this pass is positioned to answer: M-D1-MUT does
not remove a manual path — writing a weak mutation is exactly as easy as
writing a strong one and the harness cannot tell them apart. CB-WP-0005
produced two no-op mutations on its first attempt, so the failure mode is
demonstrated. And it fails in the dangerous direction: a weak mutation
does not miss a defect, it indicts working code.
CB-WP-0005 T04-T06 are marked deferred rather than deleted, with their
analysis intact, so the trail from prediction to contradiction to re-plan
stays readable.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-31 17:55:46 +02:00
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
`reported, not targeted`, so there is no property to invert and it counts
|
|
|
|
|
|
against M-D1-MUT by ADR-0005 §1.
|
|
|
|
|
|
|
|
|
|
|
|
Two honest options, and the task must pick one with an argument: give it a
|
|
|
|
|
|
threshold (making it enforceable), or **remove it from the acceptance
|
|
|
|
|
|
table** and keep it as a reported diagnostic. A row in an acceptance table
|
|
|
|
|
|
that cannot fail is decoration, and this pass has learned to say so.
|
|
|
|
|
|
|
|
|
|
|
|
Note the incentive: ADR-0005 already predicts own-source growth from the
|
|
|
|
|
|
kernel work in Phase B, so AM-4c will move against us. Setting its
|
|
|
|
|
|
threshold *after* seeing that movement would be the retarget InnerLoop
|
|
|
|
|
|
§Step 4 forbids — so it is set here, before Phase B, or not at all.
|
|
|
|
|
|
|
|
|
|
|
|
## Phase B — the kernel work inherited from CB-WP-0005
|
|
|
|
|
|
|
Fix loadability, and put the deferred analysis where the work is
loop-lint failed: CB-WP-0005 was 401 lines against a ~400 limit, one over,
after the status-vocabulary note. Pushed before checking — my error; the
gate caught it on the next run.
The fix is not a trim. The gate exposed a circular reference I had
created: CB-WP-0005's cancelled tasks held the full analysis while
CB-WP-0006 pointed back at them for detail, so the live workplan deferred
to a cancelled one. The analysis now lives in CB-WP-0006 Phase B next to
the work, and CB-WP-0005 keeps a forward pointer per task. One copy,
single source of fact, and the reference points forward.
CB-WP-0006 T05 and T06 gain the detail that moved: K9's mutation proof and
what its acceptance property actually is, K11's detection clause and
budget attribution, and the D2 correction the reviewer forced — the bundle
is not "a directory of four files" but a change to the runner's data flow,
because scenario.rs creates an EventLog, appends to it and never reads it.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-31 17:58:36 +02:00
|
|
|
|
> These three were written in [CB-WP-0005](CB-WP-0005-assertion-coverage.md)
|
|
|
|
|
|
> Phase C and cancelled unstarted. Their analysis lives **here**, next to
|
|
|
|
|
|
> the work — CB-WP-0005 keeps only a forward pointer, so there is one copy.
|
|
|
|
|
|
> The normative controls are in
|
|
|
|
|
|
> [ADR-0005](../decisions/ADR-0005-assertion-coverage-and-replay.md) §6.
|
CB-WP-0006: instrument the acceptance table, then implement
Scoped to what CB-WP-0005 T02 measured rather than what CB-RES-0004
predicted. The survey diagnosed three absent kernel rules; M-D1-MUT found
that 8 of 14 acceptance rows have no instrument behind them at all.
Phase A instruments the unmeasured rows, starting with AM-6 — nothing in
the workspace compares any number to 100,000 events/s, the project's
headline throughput claim, reported as "met, 16.5x". Phase B carries the
kernel work deferred unstarted from CB-WP-0005 Phase C. That order is the
point: the previous pass built a fix before its instrument existed and
the instrument then contradicted the fix's premise.
T01 names its own trap up front: a timing assertion in CI is flaky by
nature and the usual response is to loosen it until it never fires, which
would reproduce exactly the defect being fixed. The threshold is pinned
far below measured, states its headroom in the failure message, and
loosening requires an ADR.
T04 notes an incentive worth blocking early: ADR-0005 predicts own-source
growth from Phase B, so AM-4c will move against us. Setting its threshold
after seeing that movement is the retarget InnerLoop §Step 4 forbids, so
it is set before Phase B or not at all.
T09 asks the question this pass is positioned to answer: M-D1-MUT does
not remove a manual path — writing a weak mutation is exactly as easy as
writing a strong one and the harness cannot tell them apart. CB-WP-0005
produced two no-op mutations on its first attempt, so the failure mode is
demonstrated. And it fails in the dangerous direction: a weak mutation
does not miss a defect, it indicts working code.
CB-WP-0005 T04-T06 are marked deferred rather than deleted, with their
analysis intact, so the trail from prediction to contradiction to re-plan
stays readable.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-31 17:55:46 +02:00
|
|
|
|
|
|
|
|
|
|
## Task: K9 and K11 — durable log, LogStore port, real conformance suite
|
|
|
|
|
|
|
|
|
|
|
|
```task
|
|
|
|
|
|
id: CB-WP-0006-T05
|
|
|
|
|
|
status: todo
|
|
|
|
|
|
priority: high
|
2026-07-31 17:56:55 +02:00
|
|
|
|
state_hub_task_id: "2a357dbf-3861-499d-a12e-f7682b7332f6"
|
CB-WP-0006: instrument the acceptance table, then implement
Scoped to what CB-WP-0005 T02 measured rather than what CB-RES-0004
predicted. The survey diagnosed three absent kernel rules; M-D1-MUT found
that 8 of 14 acceptance rows have no instrument behind them at all.
Phase A instruments the unmeasured rows, starting with AM-6 — nothing in
the workspace compares any number to 100,000 events/s, the project's
headline throughput claim, reported as "met, 16.5x". Phase B carries the
kernel work deferred unstarted from CB-WP-0005 Phase C. That order is the
point: the previous pass built a fix before its instrument existed and
the instrument then contradicted the fix's premise.
T01 names its own trap up front: a timing assertion in CI is flaky by
nature and the usual response is to loosen it until it never fires, which
would reproduce exactly the defect being fixed. The threshold is pinned
far below measured, states its headroom in the failure message, and
loosening requires an ADR.
T04 notes an incentive worth blocking early: ADR-0005 predicts own-source
growth from Phase B, so AM-4c will move against us. Setting its threshold
after seeing that movement is the retarget InnerLoop §Step 4 forbids, so
it is set before Phase B or not at all.
T09 asks the question this pass is positioned to answer: M-D1-MUT does
not remove a manual path — writing a weak mutation is exactly as easy as
writing a strong one and the harness cannot tell them apart. CB-WP-0005
produced two no-op mutations on its first attempt, so the failure mode is
demonstrated. And it fails in the dangerous direction: a weak mutation
does not miss a defect, it indicts working code.
CB-WP-0005 T04-T06 are marked deferred rather than deleted, with their
analysis intact, so the trail from prediction to contradiction to re-plan
stays readable.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-31 17:55:46 +02:00
|
|
|
|
```
|
|
|
|
|
|
|
Fix loadability, and put the deferred analysis where the work is
loop-lint failed: CB-WP-0005 was 401 lines against a ~400 limit, one over,
after the status-vocabulary note. Pushed before checking — my error; the
gate caught it on the next run.
The fix is not a trim. The gate exposed a circular reference I had
created: CB-WP-0005's cancelled tasks held the full analysis while
CB-WP-0006 pointed back at them for detail, so the live workplan deferred
to a cancelled one. The analysis now lives in CB-WP-0006 Phase B next to
the work, and CB-WP-0005 keeps a forward pointer per task. One copy,
single source of fact, and the reference points forward.
CB-WP-0006 T05 and T06 gain the detail that moved: K9's mutation proof and
what its acceptance property actually is, K11's detection clause and
budget attribution, and the D2 correction the reviewer forced — the bundle
is not "a directory of four files" but a change to the runner's data flow,
because scenario.rs creates an EventLog, appends to it and never reads it.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-31 17:58:36 +02:00
|
|
|
|
**K9** — the acceptance property is *snapshot at seq N + events N+1..M ≡
|
|
|
|
|
|
genesis fold*, hash-compared, on `GroundState`. What exists instead is one
|
|
|
|
|
|
test round-tripping a `BTreeMap<String, u8>` with `EventSeq(17)` as a
|
|
|
|
|
|
literal: no game aggregate, no events applied, no from-genesis comparison.
|
|
|
|
|
|
Mutation-proven — making `Snapshot::take` discard its `EventSeq` leaves the
|
|
|
|
|
|
test green, so the half of K9 that says "+ the EventId it includes" is
|
|
|
|
|
|
unverified. `Snapshot` has no callers outside its own test.
|
|
|
|
|
|
|
|
|
|
|
|
**K11** — append-only, length-prefixed, versioned framing, with a truncated
|
|
|
|
|
|
tail **detected**; the operative clause is *detection*, so truncate-by-one-
|
|
|
|
|
|
byte and corrupt-length-prefix rejection are required, not optional.
|
|
|
|
|
|
Reimplemented rather than assimilated (ADR-0005 §2): ~100 lines against a
|
|
|
|
|
|
format Kafka and EventStore converged on independently, adding no
|
|
|
|
|
|
dependency, charged to **AM-4a** (shipped runtime, 1.5% headroom). The `LogStore` port with a shared
|
CB-WP-0006: instrument the acceptance table, then implement
Scoped to what CB-WP-0005 T02 measured rather than what CB-RES-0004
predicted. The survey diagnosed three absent kernel rules; M-D1-MUT found
that 8 of 14 acceptance rows have no instrument behind them at all.
Phase A instruments the unmeasured rows, starting with AM-6 — nothing in
the workspace compares any number to 100,000 events/s, the project's
headline throughput claim, reported as "met, 16.5x". Phase B carries the
kernel work deferred unstarted from CB-WP-0005 Phase C. That order is the
point: the previous pass built a fix before its instrument existed and
the instrument then contradicted the fix's premise.
T01 names its own trap up front: a timing assertion in CI is flaky by
nature and the usual response is to loosen it until it never fires, which
would reproduce exactly the defect being fixed. The threshold is pinned
far below measured, states its headroom in the failure message, and
loosening requires an ADR.
T04 notes an incentive worth blocking early: ADR-0005 predicts own-source
growth from Phase B, so AM-4c will move against us. Setting its threshold
after seeing that movement is the retarget InnerLoop §Step 4 forbids, so
it is set before Phase B or not at all.
T09 asks the question this pass is positioned to answer: M-D1-MUT does
not remove a manual path — writing a weak mutation is exactly as easy as
writing a strong one and the harness cannot tell them apart. CB-WP-0005
produced two no-op mutations on its first attempt, so the failure mode is
demonstrated. And it fails in the dangerous direction: a weak mutation
does not miss a defect, it indicts working code.
CB-WP-0005 T04-T06 are marked deferred rather than deleted, with their
analysis intact, so the trail from prediction to contradiction to re-plan
stays readable.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-31 17:55:46 +02:00
|
|
|
|
`fn conformance<S: LogStore>(…)`, retro-fitted to `KernelRng`, is what
|
|
|
|
|
|
finally earns **AM-11** — currently downgraded to unmet because the pair
|
|
|
|
|
|
exists and the suite does not.
|
|
|
|
|
|
|
|
|
|
|
|
**Verified by:** `make mutation-check --row AM-11` goes from
|
|
|
|
|
|
`unmutatable` to `red`.
|
|
|
|
|
|
|
|
|
|
|
|
## Task: K10 — the replay bundle and `--replay`
|
|
|
|
|
|
|
|
|
|
|
|
```task
|
|
|
|
|
|
id: CB-WP-0006-T06
|
|
|
|
|
|
status: todo
|
|
|
|
|
|
priority: high
|
2026-07-31 17:56:55 +02:00
|
|
|
|
state_hub_task_id: "d459444d-41be-40c5-9101-7a8420b42fb6"
|
CB-WP-0006: instrument the acceptance table, then implement
Scoped to what CB-WP-0005 T02 measured rather than what CB-RES-0004
predicted. The survey diagnosed three absent kernel rules; M-D1-MUT found
that 8 of 14 acceptance rows have no instrument behind them at all.
Phase A instruments the unmeasured rows, starting with AM-6 — nothing in
the workspace compares any number to 100,000 events/s, the project's
headline throughput claim, reported as "met, 16.5x". Phase B carries the
kernel work deferred unstarted from CB-WP-0005 Phase C. That order is the
point: the previous pass built a fix before its instrument existed and
the instrument then contradicted the fix's premise.
T01 names its own trap up front: a timing assertion in CI is flaky by
nature and the usual response is to loosen it until it never fires, which
would reproduce exactly the defect being fixed. The threshold is pinned
far below measured, states its headroom in the failure message, and
loosening requires an ADR.
T04 notes an incentive worth blocking early: ADR-0005 predicts own-source
growth from Phase B, so AM-4c will move against us. Setting its threshold
after seeing that movement is the retarget InnerLoop §Step 4 forbids, so
it is set before Phase B or not at all.
T09 asks the question this pass is positioned to answer: M-D1-MUT does
not remove a manual path — writing a weak mutation is exactly as easy as
writing a strong one and the harness cannot tell them apart. CB-WP-0005
produced two no-op mutations on its first attempt, so the failure mode is
demonstrated. And it fails in the dangerous direction: a weak mutation
does not miss a defect, it indicts working code.
CB-WP-0005 T04-T06 are marked deferred rather than deleted, with their
analysis intact, so the trail from prediction to contradiction to re-plan
stays readable.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-31 17:55:46 +02:00
|
|
|
|
```
|
|
|
|
|
|
|
Fix loadability, and put the deferred analysis where the work is
loop-lint failed: CB-WP-0005 was 401 lines against a ~400 limit, one over,
after the status-vocabulary note. Pushed before checking — my error; the
gate caught it on the next run.
The fix is not a trim. The gate exposed a circular reference I had
created: CB-WP-0005's cancelled tasks held the full analysis while
CB-WP-0006 pointed back at them for detail, so the live workplan deferred
to a cancelled one. The analysis now lives in CB-WP-0006 Phase B next to
the work, and CB-WP-0005 keeps a forward pointer per task. One copy,
single source of fact, and the reference points forward.
CB-WP-0006 T05 and T06 gain the detail that moved: K9's mutation proof and
what its acceptance property actually is, K11's detection clause and
budget attribution, and the D2 correction the reviewer forced — the bundle
is not "a directory of four files" but a change to the runner's data flow,
because scenario.rs creates an EventLog, appends to it and never reads it.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-31 17:58:36 +02:00
|
|
|
|
INTENT design decision 8 of 10, unimplemented. `cb-sim` has no flag
|
|
|
|
|
|
parsing at all, so `--replay` has nowhere to go yet.
|
|
|
|
|
|
|
|
|
|
|
|
**This is not "a directory of four files"** — the D2 correction the
|
|
|
|
|
|
adversarial review forced. `scenario.rs` creates an `EventLog`, appends to
|
|
|
|
|
|
it and never reads it: the one production instantiation of the K11 log is a
|
|
|
|
|
|
write-only sink. `Pass` carries the *end* state, not an initial snapshot,
|
|
|
|
|
|
and failures are a formatted `String`, not structured expected-vs-actual.
|
|
|
|
|
|
Plumb the log out of `execute`, capture an initial snapshot, restructure
|
|
|
|
|
|
`RunOutcome::Failed`. The writer is **dev-only** behind the `scenarios`
|
|
|
|
|
|
feature and is charged to **AM-4b** (9.4% headroom), not AM-4a.
|
|
|
|
|
|
|
|
|
|
|
|
All four controls from ADR-0005 §6 are required verbatim, including the two
|
|
|
|
|
|
the reviewer supplied: truncate-by-one-byte rejection, and a mutated-seed
|
|
|
|
|
|
control so the round-trip is capable of failing.
|
CB-WP-0006: instrument the acceptance table, then implement
Scoped to what CB-WP-0005 T02 measured rather than what CB-RES-0004
predicted. The survey diagnosed three absent kernel rules; M-D1-MUT found
that 8 of 14 acceptance rows have no instrument behind them at all.
Phase A instruments the unmeasured rows, starting with AM-6 — nothing in
the workspace compares any number to 100,000 events/s, the project's
headline throughput claim, reported as "met, 16.5x". Phase B carries the
kernel work deferred unstarted from CB-WP-0005 Phase C. That order is the
point: the previous pass built a fix before its instrument existed and
the instrument then contradicted the fix's premise.
T01 names its own trap up front: a timing assertion in CI is flaky by
nature and the usual response is to loosen it until it never fires, which
would reproduce exactly the defect being fixed. The threshold is pinned
far below measured, states its headroom in the failure message, and
loosening requires an ADR.
T04 notes an incentive worth blocking early: ADR-0005 predicts own-source
growth from Phase B, so AM-4c will move against us. Setting its threshold
after seeing that movement is the retarget InnerLoop §Step 4 forbids, so
it is set before Phase B or not at all.
T09 asks the question this pass is positioned to answer: M-D1-MUT does
not remove a manual path — writing a weak mutation is exactly as easy as
writing a strong one and the harness cannot tell them apart. CB-WP-0005
produced two no-op mutations on its first attempt, so the failure mode is
demonstrated. And it fails in the dangerous direction: a weak mutation
does not miss a defect, it indicts working code.
CB-WP-0005 T04-T06 are marked deferred rather than deleted, with their
analysis intact, so the trail from prediction to contradiction to re-plan
stays readable.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-31 17:55:46 +02:00
|
|
|
|
|
|
|
|
|
|
Fixing this is also what lets **AM-7's withdrawn `hash-identical`
|
|
|
|
|
|
clause** be re-earned, since a real replay is what the clause was always
|
|
|
|
|
|
about.
|
|
|
|
|
|
|
|
|
|
|
|
## Task: K14 and K18 — implement, or amend the spec and say why
|
|
|
|
|
|
|
|
|
|
|
|
```task
|
|
|
|
|
|
id: CB-WP-0006-T07
|
|
|
|
|
|
status: todo
|
|
|
|
|
|
priority: medium
|
2026-07-31 17:56:55 +02:00
|
|
|
|
state_hub_task_id: "d76ad893-520b-44bd-9b77-07dbfb651ce3"
|
CB-WP-0006: instrument the acceptance table, then implement
Scoped to what CB-WP-0005 T02 measured rather than what CB-RES-0004
predicted. The survey diagnosed three absent kernel rules; M-D1-MUT found
that 8 of 14 acceptance rows have no instrument behind them at all.
Phase A instruments the unmeasured rows, starting with AM-6 — nothing in
the workspace compares any number to 100,000 events/s, the project's
headline throughput claim, reported as "met, 16.5x". Phase B carries the
kernel work deferred unstarted from CB-WP-0005 Phase C. That order is the
point: the previous pass built a fix before its instrument existed and
the instrument then contradicted the fix's premise.
T01 names its own trap up front: a timing assertion in CI is flaky by
nature and the usual response is to loosen it until it never fires, which
would reproduce exactly the defect being fixed. The threshold is pinned
far below measured, states its headroom in the failure message, and
loosening requires an ADR.
T04 notes an incentive worth blocking early: ADR-0005 predicts own-source
growth from Phase B, so AM-4c will move against us. Setting its threshold
after seeing that movement is the retarget InnerLoop §Step 4 forbids, so
it is set before Phase B or not at all.
T09 asks the question this pass is positioned to answer: M-D1-MUT does
not remove a manual path — writing a weak mutation is exactly as easy as
writing a strong one and the harness cannot tell them apart. CB-WP-0005
produced two no-op mutations on its first attempt, so the failure mode is
demonstrated. And it fails in the dangerous direction: a weak mutation
does not miss a defect, it indicts working code.
CB-WP-0005 T04-T06 are marked deferred rather than deleted, with their
analysis intact, so the trail from prediction to contradiction to re-plan
stays readable.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-31 17:55:46 +02:00
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
Inherited from CB-WP-0005 T06. `CommitWindow` has zero non-test users;
|
|
|
|
|
|
the bench never touches `ScenarioFile`. Either wire them up or amend the
|
|
|
|
|
|
rules with a recorded argument. Deleting a rule to make a gate green is
|
|
|
|
|
|
forbidden; deleting one *with an argument* is legitimate and probably
|
|
|
|
|
|
right for K18.
|
|
|
|
|
|
|
|
|
|
|
|
## Phase C — measure, and answer the question this pass inherited
|
|
|
|
|
|
|
|
|
|
|
|
## Task: control loop — M-D1-MUT before and after
|
|
|
|
|
|
|
|
|
|
|
|
```task
|
|
|
|
|
|
id: CB-WP-0006-T08
|
|
|
|
|
|
status: todo
|
|
|
|
|
|
priority: high
|
2026-07-31 17:56:55 +02:00
|
|
|
|
state_hub_task_id: "1d4455c3-c642-47d8-916b-ab35bc512207"
|
CB-WP-0006: instrument the acceptance table, then implement
Scoped to what CB-WP-0005 T02 measured rather than what CB-RES-0004
predicted. The survey diagnosed three absent kernel rules; M-D1-MUT found
that 8 of 14 acceptance rows have no instrument behind them at all.
Phase A instruments the unmeasured rows, starting with AM-6 — nothing in
the workspace compares any number to 100,000 events/s, the project's
headline throughput claim, reported as "met, 16.5x". Phase B carries the
kernel work deferred unstarted from CB-WP-0005 Phase C. That order is the
point: the previous pass built a fix before its instrument existed and
the instrument then contradicted the fix's premise.
T01 names its own trap up front: a timing assertion in CI is flaky by
nature and the usual response is to loosen it until it never fires, which
would reproduce exactly the defect being fixed. The threshold is pinned
far below measured, states its headroom in the failure message, and
loosening requires an ADR.
T04 notes an incentive worth blocking early: ADR-0005 predicts own-source
growth from Phase B, so AM-4c will move against us. Setting its threshold
after seeing that movement is the retarget InnerLoop §Step 4 forbids, so
it is set before Phase B or not at all.
T09 asks the question this pass is positioned to answer: M-D1-MUT does
not remove a manual path — writing a weak mutation is exactly as easy as
writing a strong one and the harness cannot tell them apart. CB-WP-0005
produced two no-op mutations on its first attempt, so the failure mode is
demonstrated. And it fails in the dangerous direction: a weak mutation
does not miss a defect, it indicts working code.
CB-WP-0005 T04-T06 are marked deferred rather than deleted, with their
analysis intact, so the trail from prediction to contradiction to re-plan
stays readable.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-31 17:55:46 +02:00
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
Commit `evidence/CB-EV-0004`. The baseline is **4 of 14**, committed and
|
|
|
|
|
|
reproducible via `make mutation-check`.
|
|
|
|
|
|
|
|
|
|
|
|
Three tests, all reported:
|
|
|
|
|
|
|
|
|
|
|
|
1. **Did the enforced count rise, per row?** Against the per-task
|
|
|
|
|
|
predictions above, unmet reported as unmet.
|
|
|
|
|
|
2. **Did any row regress from `red` to `SURVIVED`?** The four currently
|
|
|
|
|
|
enforced rows are the ones with something to lose.
|
|
|
|
|
|
3. **Were the new mutations strong?** CB-WP-0005 T02 wrote two no-op
|
|
|
|
|
|
mutations on its first attempt, either of which would have published a
|
|
|
|
|
|
false accusation against working code. Every mutation added by this
|
|
|
|
|
|
pass must be shown to fail for the *stated* reason — record how that
|
|
|
|
|
|
was checked.
|
|
|
|
|
|
|
|
|
|
|
|
## Task: retrospective — is a weak mutation the new grep?
|
|
|
|
|
|
|
|
|
|
|
|
```task
|
|
|
|
|
|
id: CB-WP-0006-T09
|
|
|
|
|
|
status: todo
|
|
|
|
|
|
priority: medium
|
2026-07-31 17:56:55 +02:00
|
|
|
|
state_hub_task_id: "4f291d5a-90f0-4f1f-bcaf-7ec28856bfcf"
|
CB-WP-0006: instrument the acceptance table, then implement
Scoped to what CB-WP-0005 T02 measured rather than what CB-RES-0004
predicted. The survey diagnosed three absent kernel rules; M-D1-MUT found
that 8 of 14 acceptance rows have no instrument behind them at all.
Phase A instruments the unmeasured rows, starting with AM-6 — nothing in
the workspace compares any number to 100,000 events/s, the project's
headline throughput claim, reported as "met, 16.5x". Phase B carries the
kernel work deferred unstarted from CB-WP-0005 Phase C. That order is the
point: the previous pass built a fix before its instrument existed and
the instrument then contradicted the fix's premise.
T01 names its own trap up front: a timing assertion in CI is flaky by
nature and the usual response is to loosen it until it never fires, which
would reproduce exactly the defect being fixed. The threshold is pinned
far below measured, states its headroom in the failure message, and
loosening requires an ADR.
T04 notes an incentive worth blocking early: ADR-0005 predicts own-source
growth from Phase B, so AM-4c will move against us. Setting its threshold
after seeing that movement is the retarget InnerLoop §Step 4 forbids, so
it is set before Phase B or not at all.
T09 asks the question this pass is positioned to answer: M-D1-MUT does
not remove a manual path — writing a weak mutation is exactly as easy as
writing a strong one and the harness cannot tell them apart. CB-WP-0005
produced two no-op mutations on its first attempt, so the failure mode is
demonstrated. And it fails in the dangerous direction: a weak mutation
does not miss a defect, it indicts working code.
CB-WP-0005 T04-T06 are marked deferred rather than deleted, with their
analysis intact, so the trail from prediction to contradiction to re-plan
stays readable.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-31 17:55:46 +02:00
|
|
|
|
```
|
|
|
|
|
|
|
|
|
|
|
|
The question CB-WP-0005 T08 raised and this pass is positioned to answer.
|
|
|
|
|
|
|
|
|
|
|
|
CB-WP-0004 concluded that tooling recovers capacity only where it removes
|
|
|
|
|
|
the manual path. M-D1-MUT does **not** remove a manual path — writing a
|
|
|
|
|
|
weak mutation is exactly as easy as writing a strong one, and the harness
|
|
|
|
|
|
cannot tell the difference. CB-WP-0005 produced two no-op mutations on its
|
|
|
|
|
|
first attempt, so the failure mode is demonstrated, not hypothetical.
|
|
|
|
|
|
|
|
|
|
|
|
**And it fails in the more dangerous direction:** a weak mutation does not
|
|
|
|
|
|
merely miss a defect, it *indicts working code*. A false `SURVIVED` sends
|
|
|
|
|
|
the next pass to fix something that is not broken.
|
|
|
|
|
|
|
|
|
|
|
|
So: is M-D1-MUT a real instrument, or a name-counter with extra steps? If
|
|
|
|
|
|
the latter, say so and propose what would actually bind — the candidate
|
|
|
|
|
|
being that the mutation must be written by someone other than the author
|
|
|
|
|
|
of the assertion, which is the adversarial-review principle applied one
|
|
|
|
|
|
level down.
|