clay-borg/workplans/CB-WP-0010-consolidation.md
tegwick 4b7bdaca16
Some checks failed
ci / check (push) Failing after 3s
CB-WP-0010: close the open ends before stage 1
Tier S (structural S; chaos d4=1, no override; declaration 5 of 12).
Three items carried out of the last two passes: CB-WP-0007 left at 2/6
with both remaining tasks overtaken, GR-E03 with no scenario at all, and
CommitWindow's second failed second-use. CB-EV-0008 §4 also says the next
pass should be product, and this is how the meta share comes back down.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-08-02 02:14:23 +02:00

3 KiB
Raw Blame History

id kind title status state_hub_workstream_id
CB-WP-0010 product Close the open ends before stage 1 proposed

Purpose

Tier S (structural S — fixes and one scenario, no capability port, no canonical interface, no dependency; chaos d4=1, no override; declaration 5 of 12). One provenance paragraph per commit, no survey, no ADR.

Four items were carried out of CB-WP-0008 and CB-WP-0009 as open. Three are cheap and closing them costs less than carrying them into a tier-L stage-1 pass, where they would compete for attention with new work. CB-EV-0008 §4 also says the next pass should be product — the meta budget reads 45% of the trailing three against a soft 25%, and this pass is how it comes back down.

Task: close CB-WP-0007

id: CB-WP-0010-T01
status: todo
priority: high
state_hub_task_id: ""

CB-WP-0007 sits at 2/6 with T05 and T06 todo. Both were overtaken:

  • T05 (control loop for the session-shape pass) was answered by CB-EV-0008 §1 and §4, which measured the windowed metric and the budget firing on real passes.
  • T06 asked whether there is a fourth way a number can fail to bind. There is, and it is on record: CB-EV-0007 §3 found one aggregated over a window that cannot move it — reintroduced two tasks after the same defect was fixed for session shape.

Cancel both with pointers and mark the workplan done. A workplan left in_progress forever makes make status name a stale next task, which is what it has been doing for two passes.

Task: GR-E03 gets a scenario

id: CB-WP-0010-T02
status: todo
priority: high
state_hub_task_id: ""

CB-EV-0007 §1: COMMON PROBLEM (GR-E03) is implemented, referenced by no test, and would not fail if deleted. GR-E02 and GR-E04 both have scenarios; this is the only scoring mode with none.

Deliver scenarios/ground/gr-e03-common-problem.yaml: the group meets the threshold, personal scores are claimed value 1 per Blame held, and the highest personal score wins. Use the 5-player preset, where the threshold is actually reachable (10 available against 9).

Finding a defect here is the likely outcome and is the point — this is the first execution of that code path.

Task: record CommitWindow's second failed use

id: CB-WP-0010-T03
status: todo
priority: medium
state_hub_task_id: ""

CommitWindow is PROVISIONAL with a delete-by of 2026-12-31, on the condition "delete it if no second game uses it". CB-WP-0008 was its best chance at a second consumer and did not take it — the bots and the CLI drive GROUND's inline implementation.

Do not delete it early. The stated condition is a second game, and no second game has been attempted, so the test has not run. Record the evidence at the type so the December decision is already argued, and leave the date alone. Moving a delete-by date on the strength of a test that was never run is exactly the retarget InnerLoop §Step 4 forbids.