clay-borg/evidence
tegwick db731aa0bc T11: dated rates and staleness become data, ahead of the 2026-08-31 flip
The price sheet had two defects of one shape -- a schema that could not
hold the fact it needed, the same criticism the cost survey levelled at
the State Hub.

  CA-16  time-boxed rates are DATA. Sonnet's intro price lived in a
         `# intro ...` comment and was invisible to the collector that
         reads the file. Now promo_input/promo_output/promo_until,
         applied per response at its own timestamp.
  CA-17  the 90-day staleness rule was prose in MetricsAndScenarios 1a
         that every M-D2-CST verdict silently inherited. Now `recorded`
         + `max_age_days` in the sheet, and a stale sheet ABORTS.

Both are exercised by make cost-test: the promo rate must apply before
2026-08-31 and lapse after, and a 102-day-old sheet must trip.

Applying CA-16 moved AC-1 from $93.32 to $93.15 -- the $0.17 CB-EV-0002
predicted, now collected rather than noted. That is a legitimate
retarget under T07's distinction: the instrument disproved the target,
and its output is in this commit. The number has now been stated five
times ($248.46, $92.21, $92.87, $93.32, $93.15), each correction from a
different mechanism.

Evidence tables regenerated from the tool rather than hand-patched,
per CA-15 -- which is the rule that exists because hand-typed tables
were the only thing the adversarial review found wrong.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-07-31 09:23:29 +02:00
..
CB-EV-0001-game-kernel.md CI: enforce every gate; close the silent-skip holes 2026-07-31 04:02:33 +02:00
CB-EV-0002-cost-accounting.md T11: dated rates and staleness become data, ahead of the 2026-08-31 flip 2026-07-31 09:23:29 +02:00