clay-borg/workplans
tegwick d07caca22b CB-WP-0010-T01: close CB-WP-0007
Both remaining tasks were overtaken and are cancelled with pointers. T05's
control loop was answered by CB-EV-0008 §1 and §4, which measured the
windowed metric and the budget firing on real passes. T06 asked whether
there is a fourth way a number can fail to bind; there is, and CB-EV-0007
§3 recorded it — the meta budget, aggregated over a window that could not
move it, two tasks after the same defect was fixed for session shape. The
tier-taxonomy gap T06 also carried was closed by ADR-0006 D5.

A workplan left in_progress makes `make status` name a stale next task,
which it had been doing for two passes.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-08-02 02:15:08 +02:00
..
CB-WP-0001-inner-loop.md CB-WP-0007 T01+T03: window the metric, budget it, cap meta at 25% 2026-08-01 14:12:07 +02:00
CB-WP-0002-cost-accounting.md CB-WP-0007 T01+T03: window the metric, budget it, cap meta at 25% 2026-08-01 14:12:07 +02:00
CB-WP-0003-loop-hardening.md CB-WP-0007 T01+T03: window the metric, budget it, cap meta at 25% 2026-08-01 14:12:07 +02:00
CB-WP-0004-mechanical-work.md CB-WP-0007 T01+T03: window the metric, budget it, cap meta at 25% 2026-08-01 14:12:07 +02:00
CB-WP-0005-assertion-coverage.md CB-WP-0007 T01+T03: window the metric, budget it, cap meta at 25% 2026-08-01 14:12:07 +02:00
CB-WP-0006-instrument-the-table.md CB-WP-0007 T01+T03: window the metric, budget it, cap meta at 25% 2026-08-01 14:12:07 +02:00
CB-WP-0007-session-shape.md CB-WP-0010-T01: close CB-WP-0007 2026-08-02 02:15:08 +02:00
CB-WP-0008-ship-stage-0.md CB-WP-0008-T04: CB-EV-0007 — stage 0 is shipped, and the spend curve is a V 2026-08-01 15:25:19 +02:00
CB-WP-0009-adaptive-gates.md CB-WP-0009-T04: CB-EV-0008 — the gate changes, measured 2026-08-01 15:45:08 +02:00
CB-WP-0010-consolidation.md CB-WP-0010-T01: close CB-WP-0007 2026-08-02 02:15:08 +02:00