tegwick b59b9a565c Complete DISCTL-WP-0003-T03 through T05
Add RTO-RPO matrix, backup pickup queue tracker, and TestEvidence
with Forgejo drill import. Mark T03, T04, T05 done.
2026-07-07 19:58:21 +02:00

2 KiB

Test Evidence

Dated restore-drill reports proving RTO/RPO targets in RTO-RPO-Matrix.md are actually met — not just documented.

Naming convention

TestEvidence/restore-drill-YYYY-MM-DD-<system>.md

Examples: restore-drill-2026-07-04-forgejo.md

Required fields

Every evidence file must include:

Field Description
Date Drill execution date (UTC)
System What was restored (register ID or system name)
Backup artifact Filename, size, timestamp, source (manual/automated)
Target environment Isolated namespace, staging host, clean VM, etc.
Operator Who ran the drill
Result success / partial / failed
RPO achieved Actual recovery point (how stale was the backup?)
RTO achieved Wall-clock time from start to validated service
Checks performed API calls, smoke tests, representative workflow
Issues found Anything that blocked or degraded restore
Follow-up actions Workplan items, pickup queue refs, register updates
Canonical evidence Link to owner-repo evidence if drill ran elsewhere

Drill cadence

Tier Minimum cadence Owner
T1 irreplaceable source of truth Quarterly Bernd
T0 identity / trust Quarterly (cold decrypt included) Bernd
T2 runtime platforms Semi-annual Bernd

Quarterly Forgejo drill gate: re-run forgejo-restore-drill.sh from an automated Nextcloud artifact once daily backups are wired (promotion gate in BackupPolicy.md §7).

Next untested targets

Priority order after Forgejo manual drill (2026-07-04):

  1. S2 k8s runtime — decrypt railiance-backup-s2 artifact on clean target; validate Helm values redeploy
  2. Dev workstation cold restore — decrypt Nextcloud artifact without using production key on same machine (password-manager key only)
  3. Gitea dump — manual gitea dump restore to staging before next migration wave
  4. Secret vault cold decrypt — SOPS/age recovery material (R5 mitigation)