EBIND-WP-0002 workplan Repair capability registry federation metadata infotech evidence-binder active codex capability_registry_federation 2026-08-21 2026-08-21

EBIND-WP-0002 — Repair capability registry federation metadata

Restore evidence-binder to the reuse-surface federation after its capability index was found to contain SCOPE.md advertisement blocks instead of validated registry rows. Preserve the valid SCOPE advertisements, add resolvable registry entries, and assess maturity from current repository evidence.

Repair and document the capability entries

id: EBIND-WP-0002-T01
status: done
priority: high

Translate both index rows to the federation contract and add their backing Markdown entries. Use repository evidence, current consumer integration, and the reuse-surface maturity standard to choose defensible D/A/C/R vectors.

Acceptance:

  • both rows expose all required federation fields and stable capability IDs
  • both path values resolve to schema-valid Markdown entries
  • maturity rationale distinguishes source availability from completeness and reliability evidence

Validate, synchronize, and request federation re-enable

id: EBIND-WP-0002-T02
status: wait
priority: high
blocking_reason: awaiting railiance-platform federation action and repo-manager registrar indexing

Run the reuse-surface validator and the repository quality checks, synchronize the workplan with State Hub, and send non-secret completion evidence to the reuse-surface owner so its federation source can be re-enabled.

Acceptance:

  • registry validation passes without index-drift warnings
  • tests, typecheck, lint, and repository diff checks pass
  • State Hub records the completed work and reuse-surface receives the repair summary and maturity vectors

Local implementation completed 2026-08-21. The checked-out reuse-surface validator accepted both entries with warnings treated as failures. Repository verification passed 43 tests plus typecheck, lint, and git diff --check. The quality pass also found and removed a stale AttributeValueType import that had been failing both typecheck and lint.

Published to Forgejo main as commit e462775 on 2026-08-21; the remote head was verified with git ls-remote. Reuse-surface was asked to re-enable and refresh the source in State Hub message 9c857277-f0e9-4f29-9def-896bdba1fcc3.

Closeout is waiting on two external-state confirmations: the capabilities appearing in the federated API, and production-registrar assignment of State Hub identifiers for this new workplan and its tasks.

Rechecked 2026-08-21: the hosted registration still reports enabled: false and the federated API omits both capability IDs. The approved reuse-surface-hub-write-token route was attempted without exposing or persisting the credential, but OpenBao denied the proxy caller on the owning runtime lane. The enable-and-compose action is escalated to the lane owner in State Hub message ad3221d0-ccd5-4f90-89b3-8bfec24a1f49. The unread registrar request was also rerouted to repo-manager in message 5c74f09d-6ee6-4bac-b02f-18e6ab9ad173.