fluid-core/workplans
tegwick fedacfe3ba
Some checks failed
ci / build (push) Has been cancelled
Move progress tasks with external gates to wait
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>

Assistant: claude-code
Assistant-Model: sonnet
Assistant-Process: 270084@bnt-lap001
Assistant-Session: 350b785a-4dfd-4984-a852-dc6cc29bbc4f
2026-09-28 22:38:35 +02:00
..
FLUID-WP-0001-statehub-bootstrap.md Close FLUID-WP-0001: fill bootstrap files and document the toolchain 2026-09-14 04:44:35 +02:00
FLUID-WP-0002-foundations-and-wire-contract.md Generate contract types, pin fixtures to spec, add build and ADRs 2026-09-04 02:03:12 +02:00
FLUID-WP-0003-deterministic-data-plane.md Add the OpenAPI contract validator, closing FLUID-WP-0003 2026-09-04 08:14:19 +02:00
FLUID-WP-0004-publication-and-control-apis.md Add control APIs, control-plane binary, and close the CLI gate bypass 2026-09-04 03:00:17 +02:00
FLUID-WP-0005-fluid-insight.md Add telemetry ingest, feedback collector, pressure API and insight CLI 2026-09-04 03:19:06 +02:00
FLUID-WP-0006-fluid-science.md Add science control APIs and the hypothesis, experiment and promote CLI 2026-09-04 06:44:47 +02:00
FLUID-WP-0007-conformance-and-self-validation.md Add the conformance suite, echo fixture and integration guide 2026-09-04 08:21:49 +02:00
FLUID-WP-0008-fluid-telegram-handover.md Close FLUID-WP-0009 T03 and mark blocked workplans as such 2026-09-27 22:10:00 +02:00
FLUID-WP-0009-campaign-repos-and-example-separation.md Move progress tasks with external gates to wait 2026-09-28 22:38:35 +02:00