frontend-patterns/.custodian-brief.md
custodian-sync 70f0408240 chore(consistency): sync task status from DB [auto]
Updated by fix-consistency on 2026-10-04:
  - update .custodian-brief.md for frontend-patterns

Assistant: codex
Assistant-Model: gpt-6.1-sol
Assistant-Session: 01a1045b-933d-7aa1-b2db-104557487a79
2026-10-04 11:30:31 +02:00

3.4 KiB

Custodian Brief — frontend-patterns

Domain: infotech
Last synced: 2026-10-04 09:30 UTC
State Hub: http://127.0.0.1:8000 (adjust if running on a remote machine)

Active Workstreams

Evaluate retrieval and real repository applicability

Progress: 0/3 done | workplan_id: 831bbc30-30c0-5df3-a315-5355cd3b8ee5

Open tasks:

  • ! Evaluate held-out retrieval cases 4bdd4c53 (wait: After M2 (FEP-WP-0004-T01).)
  • ! Validate metadata and export the graph 4fec98f6 (wait: After schema and seed examples pass M1 (FEP-WP-0009-T03).)
  • ! Test against real repository revisions ab66848b (wait: After the held-out retrieval evaluation (FEP-WP-0004-T02).)

Challenge the language across architectural schools

Progress: 2/4 done | workplan_id: 13c123f1-a470-560e-ab8e-b270c387930a

Open tasks:

  • ! Compare the six research streams f7a7eea5 (wait: Full comparison waits on the M1 evidence gate (FEP-WP-0009-T03, residual of FEP-WP-0002); only the bounded exploratory slice was permitted before it.)
  • ! Complete contrasting architecture walkthroughs 05de53b6 (wait: After the M1 re-review (FEP-WP-0009-T03).)

Obtain independent validation for the M1 seed gate

Progress: 0/3 done | workplan_id: 78374f2e-006f-5faf-9053-786d54a4488a

Open tasks:

  • ! Independent human review of language pilot 01 c7e0d957 (wait: Needs an independent human reviewer to rate the masked pilot-01 answers; no model may supply or infer these scores.)
  • ! Re-assess the M1 gate 121de012 (wait: M1 re-review needs independent human ratings and the fresh replication.)
  • ! Fresh-scenario replication with atomic criteria 8e0ac763 (wait: All 12 authorized attempts failed; llm-connect endpoint unreachable. A future replication requires restored service and fresh explicit execution authorization; no retries allowed.)

Make ongoing language learning observable

Progress: 2/3 done | workplan_id: 528d24c1-c2c4-5914-a065-992b0dd877c8

Open tasks:

  • ! Measure the first comparable prospective cycles 2c5c4bae (wait: Needs useful comparable prospective evidence and an explicit protocol/returns review from WP-0003 or consumer-led WP-0008; largest declared group has two cycles, one with unknown effort.)

Close the ecosystem reuse and improvement loop

Progress: 0/3 done | workplan_id: 9f719719-ed4e-5c57-a62f-855fe1876e17

Open tasks:

  • ! Publish and connect the reusable reference 453fc06b (wait: Needs hosted registration access and common-template integration into an actual eligible consumer with a pinned decision note. Qualified draft reference use does not require M1.)
  • ! Run bounded improvements and monthly review autonomously f823587c (wait: Reporting cadence is verified. Needs real consumer outcomes, admitted budget-enforced improvement execution and authenticated publication/rollback proof.)
  • ! Capture evidence of use and outcomes 49be8a8e (wait: Receipt contract follows the published capability entry (T01).)

Inbox Hygiene

Stale unread: 1 message(s) older than 3 day(s) — triage at session start. Missing thread_id: 2 unread message(s) lack supersession chains.


MCP Orientation (when available)

If the state-hub MCP server is reachable, call: get_domain_summary("infotech") This provides richer cross-domain context. If the MCP call fails, use this file as your orientation source.