Updated by fix-consistency on 2026-10-04: - update .custodian-brief.md for frontend-patterns Assistant: codex Assistant-Model: gpt-6.1-sol Assistant-Session: 01a1045b-933d-7aa1-b2db-104557487a79
3.4 KiB
Custodian Brief — frontend-patterns
Domain: infotech
Last synced: 2026-10-04 09:30 UTC
State Hub: http://127.0.0.1:8000 (adjust if running on a remote machine)
Active Workstreams
Evaluate retrieval and real repository applicability
Progress: 0/3 done | workplan_id: 831bbc30-30c0-5df3-a315-5355cd3b8ee5
Open tasks:
- ! Evaluate held-out retrieval cases
4bdd4c53(wait: After M2 (FEP-WP-0004-T01).) - ! Validate metadata and export the graph
4fec98f6(wait: After schema and seed examples pass M1 (FEP-WP-0009-T03).) - ! Test against real repository revisions
ab66848b(wait: After the held-out retrieval evaluation (FEP-WP-0004-T02).)
Challenge the language across architectural schools
Progress: 2/4 done | workplan_id: 13c123f1-a470-560e-ab8e-b270c387930a
Open tasks:
- ! Compare the six research streams
f7a7eea5(wait: Full comparison waits on the M1 evidence gate (FEP-WP-0009-T03, residual of FEP-WP-0002); only the bounded exploratory slice was permitted before it.) - ! Complete contrasting architecture walkthroughs
05de53b6(wait: After the M1 re-review (FEP-WP-0009-T03).)
Obtain independent validation for the M1 seed gate
Progress: 0/3 done | workplan_id: 78374f2e-006f-5faf-9053-786d54a4488a
Open tasks:
- ! Independent human review of language pilot 01
c7e0d957(wait: Needs an independent human reviewer to rate the masked pilot-01 answers; no model may supply or infer these scores.) - ! Re-assess the M1 gate
121de012(wait: M1 re-review needs independent human ratings and the fresh replication.) - ! Fresh-scenario replication with atomic criteria
8e0ac763(wait: All 12 authorized attempts failed; llm-connect endpoint unreachable. A future replication requires restored service and fresh explicit execution authorization; no retries allowed.)
Make ongoing language learning observable
Progress: 2/3 done | workplan_id: 528d24c1-c2c4-5914-a065-992b0dd877c8
Open tasks:
- ! Measure the first comparable prospective cycles
2c5c4bae(wait: Needs useful comparable prospective evidence and an explicit protocol/returns review from WP-0003 or consumer-led WP-0008; largest declared group has two cycles, one with unknown effort.)
Close the ecosystem reuse and improvement loop
Progress: 0/3 done | workplan_id: 9f719719-ed4e-5c57-a62f-855fe1876e17
Open tasks:
- ! Publish and connect the reusable reference
453fc06b(wait: Needs hosted registration access and common-template integration into an actual eligible consumer with a pinned decision note. Qualified draft reference use does not require M1.) - ! Run bounded improvements and monthly review autonomously
f823587c(wait: Reporting cadence is verified. Needs real consumer outcomes, admitted budget-enforced improvement execution and authenticated publication/rollback proof.) - ! Capture evidence of use and outcomes
49be8a8e(wait: Receipt contract follows the published capability entry (T01).)
Inbox Hygiene
Stale unread: 1 message(s) older than 3 day(s) — triage at session start. Missing thread_id: 2 unread message(s) lack supersession chains.
MCP Orientation (when available)
If the state-hub MCP server is reachable, call:
get_domain_summary("infotech")
This provides richer cross-domain context.
If the MCP call fails, use this file as your orientation source.