Workplan closeout audit — 2026-09-27

User requested implementation of finishable local loose ends, no unnecessary new work records, blocked states for blocked plans, then commit and sync. All eight repository workplans were assessed; no new task or workplan was created. Historical progress sections remain historical; the final closeout section gives current state.

Workplan Result Completed here / remaining acceptance
FEP-WP-0001 finished, unchanged All bootstrap tasks already done
FEP-WP-0002 blocked T03 waits for independent usefulness and validated seed-case evidence; existing M1 review is revise/defer
FEP-WP-0003 blocked T03 complete: full M2 editorial/ontology review, all seventeen candidates and ten cases. T02 waits on M1; T01 source/reproduction work and T04 real storage/receiver investigation remain unfinished
FEP-WP-0004 blocked T01 waits on M1; T02/T03 wait on M2. Preview output cannot replace canonical/held-out/empirical acceptance
FEP-WP-0005 finished, unchanged Bench setup already delivered; adapter regression checks passed
FEP-WP-0006 active T03 review-date reconciliation complete; comparable-window assessment still needs useful prospective cycles under a shared protocol
FEP-WP-0007 finished, unchanged Published 0.1 preview preserved byte-for-byte
FEP-WP-0008 blocked T01 frozen-release isolation complete; hosted consumer integration, producer hook, real linked outcomes and admitted executor remain required

Local implementation adds a version/current registry and validates old publications from their pinned Git objects, separately from live research validation. Regression checks cover legitimate new research, stale live profiles and tampered publication inputs. Fourteen unknown substantive-review dates now have original-artifact provenance; the three existing dates are corroborated. Validation requires scoped provenance and rejects dates later than their metadata assessment. Historical baseline and published version are unchanged.

The M2 review closes delivery of the editorial assessment with an explicit revise/defer result; it does not close M2. The date reconciliation adds no learning cycle or fabricated effort. Six incomparable prospective groups cannot satisfy the three-comparable-cycle trigger.

Activity-core reporting and collection are operational with three enabled schedules; no consumer is enrolled and no pattern-edit executor is admitted. Existing external owners remain ACTIVITY-WP-0041 T03, GLAS-WP-0012 and HFACT-WP-0001. The October 1 monthly reporting obligation remains, including empty/blocked evidence if unchanged. No schedule, external deployment or sibling repository was changed by this audit.

Verification: schema tests, bench adapter tests and synthetic bench plan; reference and evolution tests; reference/evolution/classification consistency checks; changed Markdown links and whitespace. The plan command makes no provider calls. These checks validate repository contracts, not independent usefulness or live execution.