frontend-patterns/.custodian-brief.md
custodian-sync 984cf59695 chore(consistency): sync task status from DB [auto]
Updated by fix-consistency on 2026-09-30:
  - update .custodian-brief.md for frontend-patterns

Assistant: claude-code
Assistant-Model: sonnet
Assistant-Process: 101414@bnt-lap001
Assistant-Session: 60b5a221-d435-42b9-b778-983c90c7eed6
2026-09-30 12:51:31 +02:00

2.6 KiB

Custodian Brief — frontend-patterns

Domain: infotech
Last synced: 2026-09-30 10:51 UTC
State Hub: http://127.0.0.1:8000 (adjust if running on a remote machine)

Active Workstreams

Validate the seed frontend pattern language

Progress: 2/3 done | workplan_id: 3350b7f2-375a-54e8-8f7c-3bf7c7c3af71

Open tasks:

  • · Validate a connected seed corpus 54940b04

Make ongoing language learning observable

Progress: 2/3 done | workplan_id: 528d24c1-c2c4-5914-a065-992b0dd877c8

Open tasks:

  • ! Measure the first comparable prospective cycles 2c5c4bae (wait: Registers a bounded cycle before FEP-WP-0003-T01's next investigation.)

Close the ecosystem reuse and improvement loop

Progress: 0/3 done | workplan_id: 9f719719-ed4e-5c57-a62f-855fe1876e17

Open tasks:

  • ! Run bounded improvements and monthly review autonomously f823587c (wait: Needs the receipt collector (T02) and a verified rein/Glas profile (GLAS-WP-0012) before scheduling.)
  • ! Publish and connect the reusable reference 453fc06b (wait: Capability entry publishes the versioned catalog produced by M1.)
  • ! Capture evidence of use and outcomes 49be8a8e (wait: Receipt contract follows the published capability entry (T01).)

Challenge the language across architectural schools

Progress: 2/4 done | workplan_id: 13c123f1-a470-560e-ab8e-b270c387930a

Open tasks:

  • ! Compare the six research streams f7a7eea5 (wait: Full comparison waits on FEP-WP-0002's M1 evidence gate (T03 wait); only the bounded exploratory slice was permitted before it.)
  • ! Complete contrasting architecture walkthroughs 05de53b6 (wait: After the M1 review (FEP-WP-0002-T03).)

Evaluate retrieval and real repository applicability

Progress: 0/3 done | workplan_id: 831bbc30-30c0-5df3-a315-5355cd3b8ee5

Open tasks:

  • ! Evaluate held-out retrieval cases 4bdd4c53 (wait: After M2 (FEP-WP-0004-T01).)
  • ! Validate metadata and export the graph 4fec98f6 (wait: After schema and seed examples pass M1 (FEP-WP-0002-T03).)
  • ! Test against real repository revisions ab66848b (wait: After the held-out retrieval evaluation (FEP-WP-0004-T02).)

Inbox Hygiene

Missing thread_id: 2 unread message(s) lack supersession chains.


MCP Orientation (when available)

If the state-hub MCP server is reachable, call: get_domain_summary("infotech") This provides richer cross-domain context. If the MCP call fails, use this file as your orientation source.