`ADHOC-YYYY-MM-DD` is unique per date but not per repository, so any two repos
opening an ad-hoc on the same day collide. The 2026-08-26 fleet projection
reset refused 9 records for exactly this reason.
Canon (work-record-types_v0.1, CUST-WP-0066) settled the form as
`{PREFIX}-WP-ADHOC-YYYY-MM-DD`, filename unchanged, and grandfathered existing
ids on the condition they are never *silently* re-derived. This is the explicit
migration that clause allows for.
The hub id is derived from the record id, so a changed id is a different
record: stale state_hub_*_id fields are dropped and fix-consistency re-derives.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Assistant: claude-code
Assistant-Model: opus
Assistant-Process: 2583210@bnt-lap001
Assistant-Session: f2bff2d5-e9b2-4338-92ca-10282a927006
1.4 KiB
1.4 KiB
| id | type | title | domain | repo | status | owner | created | updated |
|---|---|---|---|---|---|---|---|---|
| GROUND-WP-ADHOC-2026-08-08 | workplan | RPT-0006 boards/modes disposition and small rules clarifications | consumer | ground-game | finished | grok | 2026-08-08 | 2026-08-09 |
Ad hoc from clay-borg boards & modes panel (GROUND-RPT-0006)
Finished 2026-08-09.
Task: clarify SHARED GROUND mastery uses points
id: GROUND-WP-ADHOC-2026-08-08-T01
status: done
priority: high
Done 2026-08-08. Modes.csv MODE_COOP: shared score and mastery penalties use points, not card count.
Task: re-tune SCN_02 (was mechanical twin of SCN_01)
id: GROUND-WP-ADHOC-2026-08-08-T02
status: done
priority: medium
Done 2026-08-09. SCN_02 suits retuned; values/titles kept. Note:
history/260809-scn02-mechanical-distinct.md.
Scoped module Problems.csv rebuilt to match. clay-borg notified to
re-vendor / re-run twin pin.
Task: optional SCN_04 2p suit pass
id: GROUND-WP-ADHOC-2026-08-08-T03
status: cancel
priority: low
Cancelled 2026-08-09. Not requested; SCN_04 stays the harder 2p board by design (double Repair). Reopen only if table feel complains.
Task: consumed_files on modules (process)
id: GROUND-WP-ADHOC-2026-08-08-T04
status: done
priority: medium
Done 2026-08-08. Example on problem_stress.scoped + CATALOG rule.