repair with 200 affected tests and a disposable native LDAP exercise.
- NK-WP-0049-T02 remains progress for inventory reconciliation; T03 remains wait
for owner-native recovery. CUST-WP-0080-T05 retains the Playwright handoff.
- Final publication receipt in State Hub:
`ebfc2aa5-3dd9-48bd-b0d1-170f4270ec98`.
## PQRST estimate
```text
PQRST-Estimate
P: 20%
Q: 30%
R: 15%
S: 25%
T: 10%
Sum: 100%
Confidence: medium
Signature: P20 Q30 R15 S25 T10
Dominant factors: Regression tests and disposable LDAP/privacyIDEA exercises established configuration preservation, bind behavior and real MFA; credential handling, destination restrictions and truthful acceptance receipts drove the security work. Provider-source review, helper implementation and scope/workplan reconciliation account for the remaining effort.
Notes: Earlier interrupted work is represented by retained session summaries and committed receipts; the closing ritual is excluded.
```
## Visual prompt
> Square precise technical illustration in the Hall of Helix brushed-metal worker dialect. A quiet figure of pale brushed metal with a small warm inner light sits at a dark indigo workshop desk. In the foreground, two small brass connector housings have been carefully repaired and joined by one narrow gold wire on a testing jig; their surrounding delicate engraved circuitry is intact. A tiny amber test lamp glows beside the jig. Beyond the desk, a separate large doorway remains closed, its threshold softly visible and its indicator unlit. A second empty socket on the far side of the desk suggests work handed to another owner. The figure has set down its fine tool and is looking at the tested repair, composed and attentive. The scene is about finishing a precise repair while leaving the larger deployment boundary honestly closed. Cinematic still, restrained warm gold and pale metal against deep indigo, precise materials, generous quiet negative space. No logos, no readable text, no numbers, no trophy or triumphant pose. Opaque background.
## Portrait

## Handoff
The two-helper source repair is finished and published. The next technical
action, when the broader work is resumed, is to reconcile the remaining caller
and root-output inventory under NK-WP-0049-T02. Owner-approved production
recovery and the actual KeyCape acceptance path belong to T03. Keep the
Playwright owner-return gates visible under CUST-WP-0080-T05; this session's
resolver fixture does not discharge them.
For this closing, I am putting down the tool with the tested repair complete