Assistant: codex Assistant-Model: gpt-5.6-sol Assistant-Session: 01a053ff-1d6f-7fe2-ac1c-a6eb40a42a0c
8.3 KiB
| id | type | title | domain | repo | status | owner | topic_slug | created | updated | parent_project | parent_workplan | related | state_hub_workstream_id | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| HUB-WP-0006 | workplan | Repository classification aggregation and navigation | infotech | hub-core | active | codex | custodian | 2026-08-22 | 2026-08-22 | prj-state-hub-retirement | STATE-WP-0079 |
|
05ebd06e-4af8-5f6c-918c-c143c1520e00 |
Repository classification aggregation and navigation
Goal
Consume Repo Manager's validated repository-classification projections and provide rebuildable cross-domain aggregation/navigation without creating a second classification authority. Supply the hub-core receiving surface needed for State Hub retirement slices A5 and the repository-facing part of A4/B5.
Accept the classification projection boundary
id: HUB-WP-0006-T01
status: done
priority: high
state_hub_task_id: "2a45aa34-ffa1-5432-9bfd-a6725708d807"
Review RMGR-CONTRACT-CLASSIFICATION-0001 version 1.0 and record the hub-core
authority, validation, versioning, provenance, failure, and A5 routing
boundary.
Completed 2026-08-22. docs/adr/ADR-0002-repository-classification-projections.md
accepts the contract without a schema gap. Repository files remain authority;
Repo Manager validates and publishes; hub-core derives navigation only; and
STATE-WP-0079 retains the consumer-route switch and rollback flag.
State Hub decision 7168ee97-71bd-43e8-9d8b-0d5532743d08 records the same
single-authority boundary.
Freeze the hub-side projection contract
id: HUB-WP-0006-T02
status: done
priority: high
state_hub_task_id: "fa5c37c5-40cb-5ddf-bb01-72b00a8c8931"
Define the input envelope, supported contract versions, stable repository identity, cursor/snapshot semantics, provenance, diagnostics, and the derived domain/category/tag/stake/mechanic views. Define legacy topic aliases as temporary compatibility metadata, not mutable topic authority.
Completed 2026-08-22. Packaged helixforge.repository-navigation 1.0.0
defines the strict Repo Manager page envelope, stable registrar UUID identity,
atomic snapshot/rebuild and cursor rules, per-repository provenance, failure
diagnostics, all six derived facet kinds, read-only query routes, and expiring
State Hub topic aliases with residual ownership. Both representative fixtures
validate, the wheel contains the versioned artifacts, and the full suite passes
72 tests.
Implement Repo Manager ingestion and rebuild
id: HUB-WP-0006-T03
status: done
priority: high
state_hub_task_id: "8b79be6d-d1aa-5134-b2f7-3dc088a7b3fd"
Add an injected port.repo client, deterministic full rebuild plus incremental
upsert/delete behavior, durable PostgreSQL projection tables, content hashes,
and dependency-aware readiness. Reject invalid or unsupported projection
versions without coercion.
Completed 2026-08-22. RepositoryNavigationService consumes an injected
port.repo client, validates the exact v1.0.0 envelope plus cross-page
semantics, and applies deterministic full or incremental generations with
idempotent duplicate handling. Migration 0003_repository_navigation
persists active state, normalized repository rows, and all derived facets in
one atomic transaction. Invalid versions and transfers preserve the last
generation as stale; readiness distinguishes current, stale, unavailable, and
disabled dependencies. PostgreSQL migration SQL renders through head and the
77-test suite covers durable reopen, startup injection, outage, rejection,
full rebuild, upsert, and deletion.
Expose projection query and MCP navigation
id: HUB-WP-0006-T04
status: done
priority: high
state_hub_task_id: "59cbe5b8-ab7e-5274-b4d2-a38246df89e3"
Expose cross-repository query routes and MCP tools for domain, secondary domain, category, capability tag, business stake, and business mechanic. Responses carry source revision and rebuild provenance. No endpoint writes classification authority.
Completed 2026-08-22. The read-only projection port now supports cross-facet
HTTP queries plus direct facet resolution for primary/secondary domain,
category, capability tag, business stake, and business mechanic. Filters OR
within a family and AND across families; snapshot/filter-bound cursors reject
reuse after rebuild with 409. Responses validate against the frozen output
schema and carry source revision, observed provenance, rebuild time, status,
and content hash. MCP tools query_repository_navigation and
get_repository_navigation_facet expose the same navigation fields. Runtime
OpenAPI inspection confirms that every navigation operation is GET-only.
Prove conformance and failure behavior
id: HUB-WP-0006-T05
status: done
priority: medium
state_hub_task_id: "901f0f0c-270c-5939-8c98-fcae6988e8f3"
Add contract fixtures and checks for full rebuild, incremental changes, deletion, duplicate delivery, unsupported versions, Repo Manager outage, stable ordering/cursors, provenance, and absence of classification writes or foreign database access.
Completed 2026-08-22. A packaged incremental fixture and 15 focused ingestion checks now cover single- and multi-page full rebuild, incremental upsert plus delete, duplicate delivery, snapshot-ID reuse with changed content, unsupported versions, upstream outage, inconsistent-page atomicity, durable reopen, stable ordering, filter- and generation-bound cursors, response provenance, GET-only HTTP navigation, and projection tables without foreign database keys. The wheel rebuild succeeds and the complete suite passes 88 tests.
Hand A5/A4 navigation to State Hub retirement
id: HUB-WP-0006-T06
status: wait
priority: high
state_hub_task_id: "7c8225f7-03dc-57b0-a668-c3d781bd828a"
With STATE-WP-0079, compare legacy topic/navigation consumers with the new
projection, retain explicit aliases where required, run owned consumer smokes,
switch A5 through RM_SLICE_TOPICSPINE, and record rollback plus residual
expiry. Wait on T02-T05 and the State Hub cutover window.
Readiness checkpoint 2026-08-22: T02-T05 are complete, but T06 remains wait.
RMGR-WP-0008-T06 delivered validation and the authority contract, not a
transport that emits the frozen paged envelope with registrar
repository_id values. A Repo Manager-owned port.repo publisher/adapter is
therefore still required before comparison can start. Hub-core commits
a701dc8 through 93a9151 also require migration/image deployment, and
STATE-WP-0079-T04 remains progress. Do not move RM_SLICE_TOPICSPINE from
off until those three gates close; rollback remains the flag set to off plus
the prior State Hub read route.
Publisher checkpoint 2026-09-01: Repo Manager revision
10d87e21f50a0205b62688604c78c6f43a7171e5 now emits the exact frozen
envelope through a read-only, bearer-capable HTTP port.repo route with stable
registrar UUIDs and HMAC-bound paging. Hub-core's built-in HTTP client refreshes
at startup and on a configured interval. Live conformance accepted 123
repositories over five pages as one current generation; Repo Manager evidence:
docs/evidence/RMGR-WP-0013-live-conformance-2026-09-01.md.
Deployment checkpoint 2026-09-01: Helm revision 24 runs the Forgejo-backed
publisher and hub-core image dda93db privately on railiance01. Live
verification accepts 114 public repositories in a 3.45-second full scan and
reports nine private sources as bounded errors. T06 remains wait only on
RAPPCOREHUB-WP-0003-T04: a dedicated read:repository Forgejo identity and
an error-free 123-repository admission proof. No host checkout or State Hub
runtime dependency remains.
T06 still waits only on production placement/networking and deployment of the
two committed runtimes. The public Core Hub cluster does not own the host-local
Repo Manager checkout registry; do not solve that by mounting a broad home
directory or restoring State Hub as the classification authority. Once a
scoped publisher endpoint is deployed and the candidate migration/image is
rolled out, comparison and RM_SLICE_TOPICSPINE can proceed.
Acceptance
- Repo Manager v1.0 authority and projection contract accepted
- Hub-side projection and compatibility alias contract versioned
- Rebuildable durable ingestion passes provenance and failure checks
- HTTP/MCP navigation reads only the derived projection
- A5/A4 consumer comparison and rollback evidence recorded