informed-decision/GOAL.md
tegwick 309bea463e Correct repo flavor to product; add SCOPE, AGENTS, classification
fix-consistency surfaced that GOAL.md's `repo_flavor: project` was wrong.
project-repository-flavor_v0.1.md reserves the prj- flavor for bounded
cross-repo coordination efforts and says durable products use INTENT.md and an
ordinary category. informed-decision is a durable product, so the C-35
"prj- flavor forbids shipping both INTENT.md and GOAL.md" contradiction was
self-inflicted rather than a real conflict.

- .repo-classification.yaml: category product, domain infotech.
- GOAL.md: drop repo_flavor/project_status, add a flavor note explaining that
  GOAL.md is retained as the stage statement alongside a stable INTENT.md.
- SCOPE.md: honestly empty — states that nothing is implemented and that
  INFD-WP-0001-T06 rewrites it after the gate-house ruling and the specs.
- AGENTS.md: shared State Hub / session / workplan boilerplate, plus the hard
  rules for this repository — never decide, never own approval state, never
  invent identity, never let awareness enter view_hash, never let an agent
  bind, never fork the schema, fail closed.
- INFD-WP-0001: T01 records both corrections; T06 now rewrites SCOPE.md.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01V3W1dQG7GFFM9d94jFx7iR

Assistant: claude-code
Assistant-Model: opus
Assistant-Process: 1565372@bnt-lap001
Assistant-Session: 16bb2f25-b34c-49ef-8e94-5fec3567a568
2026-09-09 12:38:41 +02:00

138 lines
6.8 KiB
Markdown

---
repo: informed-decision
category: product
stage: 1
stage_status: active
started: "2026-09-09"
---
> **Flavor note.** This is a durable **product** repository, not a `prj-`
> project repository. Per `project-repository-flavor_v0.1.md`, durable products
> use `INTENT.md` and an ordinary category; the `prj-` flavor is for bounded
> cross-repo coordination efforts and is not used here. `GOAL.md` is retained
> as the *stage* statement: `INTENT.md` is stable and aspirational, this file
> is what the current stage must achieve and is replaced when the stage turns
> over.
# Goal — informed-decision, Stage 1
## Outcome
**The approver UI has an owner, and it is this repository.**
Stage 1 is complete when a human approver can be shown a `approval-engine`
approval request on a surface this repository owns, understand it, act on it
with a vocabulary richer than approve/reject, and leave behind a
reconstructable record of *what they were shown when they bound themselves*
and when `key-cape` holds the browser-client registration it has been waiting
for since 2026-09-08.
Two things are being settled at once, and they are the same thing:
1. **The ownership question.** `approval-engine` disowns the inbox by design
and named the gap in `docs/keycape-service-registrations.md`. Nobody picked
it up. Stage 1 picks it up, in writing, with a catalog placement agreed by
`gate-house` rather than asserted.
2. **The capability.** A browser-facing approver surface that presents
`approval:approve` tokens to `approval-engine` and records the presentation.
## Why this is the first stage
The founding exploration reaches L5 — multi-party international instruments.
Stage 1 deliberately does not. It takes the **narrowest real consumer with a
live blocking dependency**, because a decision surface with no consumer is a
design document, and this estate already has enough of those.
The approval approver flow is L3 on the depth spectrum. It is the right first
cut because it is the only level currently costing another repository progress.
## What Stage 1 delivers
- `INTENT.md`, `GOAL.md`, `SCOPE.md`, and a `layer.yaml` derived from a
`gate-house` answer.
- The four specs: `docs/specs/ProductRequirementsDocument.md`,
`docs/specs/UseCaseCatalog.md`, `docs/specs/ArchitectureBlueprint.md`,
`docs/specs/EvidenceModel.md`.
- The Decision Memo schema promoted out of `history/` into `schemas/`, with the
canonicalizer and the isolation vectors under test in CI.
- A published OIDC browser-client contract — `client_id` and callback URI —
handed to `key-cape`, closing `KEY-WP-0013-T02`.
- A working L3 approver surface against a deployed `approval-engine`.
## What Stage 1 explicitly does not deliver
- L4/L5, QES, QTSP integration, or qualified archival retention.
- Multi-party parallel sign-off (`Mitzeichnung` across several parties at once).
- The mandate graph. Stage 1 routes to a named approver; it does not maintain a
living map of who may bind what. Without that map, `escalate` is only
forwarding — this is a **known and accepted** Stage 1 limitation, recorded
here so it is not discovered later as a defect.
- EUDI Wallet / eID identity import. Identity comes from `key-cape` only.
- A general workflow engine, a notification transport, or a ticketing system.
## Invariants
These hold for Stage 1 and for every stage after it.
- **`access-engine` remains the only policy decision point.** This repository
renders questions and records answers. No endpoint here answers "may this
actor do X". A disposition recorded on a memo is evidence of a human act, not
an authorization verdict.
- **`approval-engine` remains the sole owner of approval state.** This surface
calls its mutations and reads its introspection claim. It never caches
validity, never infers consumption, and never holds approval current-state.
`GH-DEC-2026-003` ordering is honoured: decision, then consume, then act.
- **Identity is imported.** Every principal on this surface is authenticated by
`key-cape`. No local credential, no self-issued assurance level. Human
principals carry `principal_type: human` and are refused `approval:consume` by
the engine — this surface must never attempt it.
- **The binding/awareness split survives contact with the first consumer.**
`view_hash` covers only what the person committed to. Proposed roles,
other-tenant orientation and last-session summaries are hashed separately and
are not signed unless explicitly promoted into `awareness_promoted`.
- **One question per memo.** An approval that bundles three unrelated acts is
three memos.
- **Humans bind, agents draft.** An agent may assemble a memo and may not
complete a disposition.
- **The schema does not fork.** Any Stage 1 field added for approvals must be
expressible for an L0 login banner, or it does not go in the shared object.
## The question Stage 1 must answer in writing
> **Who owns the approver UI?**
The answer this repository proposes, to be ratified rather than assumed:
- **informed-decision owns it** — the surface, the presentation record, the
browser client, and the evidence of informedness.
- It is **PEP-shaped**, not an Engine: it is browser-facing and causes a
protected side effect on the far side of a decision, so it owes companion §5
and statute §6.4.
- It supplies exactly one PIP-like fact — *what was presented* — as a claim
carrying `view_hash`, issuer and freshness, and it never evaluates that fact.
- The catalog row does not exist yet. `INFD-WP-0001-T02` asks `gate-house` and
writes `layer.yaml` from the ruling. If `gate-house` places this component
elsewhere, `INTENT.md` and this file change to match — the ruling wins.
## Definition of done
1. `gate-house` has ruled on the layer placement and `layer.yaml` reflects it.
2. `key-cape` has the `client_id` and callback URI, and `KEY-WP-0013-T02` is
unblocked with the answer traceable to this repository.
3. The four specs exist, are reviewed against the current `approval-engine`,
`access-engine`, `key-cape` and `audit-core` contracts, and name their
external gates.
4. `view_hash` / `awareness_hash` are computed by code in this repository, and
the four isolation vectors from the exploration are green in CI.
5. One approval is approved end to end by a human through this surface against
a deployed `approval-engine`, and the resulting approval entry is
reconstructable from a stored presentation.
6. `return` and `discuss` are demonstrated on a real approval and are
distinguishable from `decline` in the record.
## Stage 2 and beyond — direction only, not commitment
L0 informed login/elevation in front of `key-cape`, then L2 ADR accept against
the estate's own decision records. Those two prove scale invariance downward and
sideways. L4 contract paths and any QES work wait for a named buyer and a