INFD-WP-0002 T01–T02: eight one-question memos for net-kingdom-admins, batch contract without approve-all, no live bind (T08 still open). Assistant: grok Assistant-Session: 01a09dc1-b21e-77e1-919e-fcad2f82b267
508 B
508 B
HFACT-WP-0001-T03 — confirm CCR-2026-0019 operator-group
Blocking workplan: HFACT-WP-0001 Blocking task: HFACT-WP-0001-T03 (hub prefix 67c80db1, needs_human)
Question
Confirm the existing operator-group claim for CCR-2026-0019 as required by the factory identity, audit and approval path?
One act
Confirm the already-named operator-group claim. Required-owner review and attended apply remain separate acts.
Must not
- Create a new CCR in this memo
- Collapse T03 with T05 live worker proof