ops-mason/workplans/MASON-WP-0001-foundation.md
tegwick a762be9e17 Construction-plan format + first real plan draft (MASON-WP-0001-T01)
docs/construction-plan-format.md: one file per plan (plans/<id>.md),
frontmatter status tracker (draft -> reviewed -> approved -> built ->
catalogued, the phase-4 hard gate), six body sections threading all
four phases through one document.

Proven against real demand: plans/rein-openweights-openrouter-approle.md,
phases 1-2 filled in. Found and reasoned through a real existing-structure
question along the way -- the openrouter-llm-connect catalog lane could
technically be reused, but its auth_method is interactive-caller-shaped
and its policy is shared/high-risk; recommends a dedicated, narrowly
scoped AppRole instead, same reasoning agent-harness-binky-mail used for
its own dedicated lane.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-07-27 00:47:15 +02:00

127 lines
5.4 KiB
Markdown

---
id: MASON-WP-0001
title: "Foundation: the four-phase construction process, exercised on a real demand"
status: proposed
state_hub_workstream_id: "fa60e81b-19f6-4ad5-a584-f049cdec1bdb"
---
First workplan for ops-mason. Stands up the four phases described in
`INTENT.md` — construction plan, review/optimize, executive summary,
build — and exercises the whole pipeline on one real, already-waiting
piece of demand: the `rein-openweights` OpenBao AppRole
(`glas-harness/workplans/GLAS-WP-0002-T02`, currently blocked on exactly
the mechanic this repo exists to formalize). That task is not busywork
invented for this workplan — it's real backlog this pipeline unblocks
the moment phase 4 lands.
## Task: Construction-plan format
Design the artifact phase 1 produces: demand description (consumer,
credential type, scope requested), an existing-structure survey (what
`bao policy list`/`bao auth list`/`bao secrets list`/ops-warden's
`registry/routing/catalog.yaml` already cover, and whether any of it
already satisfies the demand), and the proposed changes (create/modify/
tear-down, each with a stated reuse-vs-new rationale). Document in
`docs/construction-plan-format.md`. Plain, versioned markdown/YAML —
not a database — so a plan can be reviewed in a diff and stored next to
the workplan that requested it.
**Done (2026-07-27).** `docs/construction-plan-format.md`: one file per
plan at `plans/<id>.md`, YAML frontmatter (`status: draft -> reviewed ->
approved -> built -> catalogued`, the phase-4 hard gate), six body
sections (demand, existing-structure survey, proposed changes, phase-2
review notes, phase-3 executive summary, phase-4 build result) — one
document threaded through all four phases, not four separate artifacts.
Proven against a real demand, not a synthetic one:
`plans/rein-openweights-openrouter-approle.md`, phases 1-2 filled in —
including a genuine finding in the existing-structure survey (an
existing `openrouter-llm-connect` catalog lane that could theoretically
be reused, and an explicit, reasoned decision *not* to reuse it, scoped
narrowly instead). Phases 3-4 wait on `MASON-WP-0001-T03`/`T04`/`T05`.
```task
id: MASON-WP-0001-T01
status: done
priority: high
state_hub_task_id: "6b25e7ca-52a0-41c2-b5a0-b5e46c824264"
```
## Task: Review/optimize pass
A self-check phase 2 runs over a draft plan before it's shown to
anyone: flag likely-redundant new policies/roles against what already
exists, naming/TTL/scoping convention drift against established lanes
(e.g. the `agent-harness-binky-mail` shape:
`token_ttl=15m`, `token_max_ttl=30m`, bounded `token_num_uses`), and
note any compaction opportunity (two existing lanes that could merge).
This can start as a checklist a human/agent runs manually against a
draft plan — doesn't need to be automated tooling on day one.
```task
id: MASON-WP-0001-T02
status: todo
priority: high
state_hub_task_id: "58a446fb-78d0-42b4-b10a-1119266b1016"
```
## Task: Executive-summary format
Design the phase 3 artifact: a short, decidable rendering of a reviewed
plan — who/what gets access to what, for how long, blast radius if the
credential leaks, and what it costs to reverse. This is the only
mandatory human checkpoint (`INTENT.md` design principle 3/4) — it must
be readable without knowing `bao` syntax. Document in
`docs/executive-summary-format.md`, with the rein-openweights AppRole
plan (task T05) as the worked example.
```task
id: MASON-WP-0001-T03
status: todo
priority: medium
state_hub_task_id: "e37debfd-8a00-4780-b036-9376c6a10557"
```
## Task: Build executor
Phase 4: given an **approved** construction plan (explicit approval
marker set after the executive summary was reviewed), execute it against
OpenBao — policy write, AppRole creation, KV secret path creation
(**empty path/structure only — never a secret value**, see `INTENT.md`),
role_id/secret_id delivery to the consuming host, and a proposed
pointer-only ops-warden catalog entry (`warden_executes: false`, no
authored `steps`, `status: draft` — a normal commit/PR to the
`ops-warden` repo, not a live API call). Ends by naming the exact
`paste_once_provision` step the founder still needs to do (which path,
which field) — it does not attempt to fill the value itself. Must refuse
to run against an unapproved or missing-approval-marker plan — this is
the one place a bug is a real security incident, not a bad UX. Start
narrow: implement only the operations the first real plan (T05) needs,
not a general OpenBao automation framework.
```task
id: MASON-WP-0001-T04
status: todo
priority: high
state_hub_task_id: "e949f4b7-5ef4-4e42-8a07-61b6c8040298"
```
## Task: First real build — rein-openweights OpenBao AppRole
Run the whole pipeline for real: construction plan for
Option B from `glas-harness/workplans/GLAS-WP-0002-T02` (dedicated
`rein-openweights` AppRole + KV secret path at
`reins/rein-openweights/openrouter`, mirroring `agent-harness-binky-mail`'s
shape) → review/optimize → executive summary → founder approval → build
(structure only). Build ends with the founder pasting the real
OpenRouter key through ops-warden's `paste_once_provision` desk into the
newly created path/field — that one paste is the only place the live
value exists outside OpenBao. Once done, notify `glas-harness`/
`rein-openweights` so `GLAS-WP-0002-T02`'s live OpenBao verification can
proceed.
```task
id: MASON-WP-0001-T05
status: todo
priority: high
state_hub_task_id: "01782608-aa5a-4f9b-a1fb-9a64f6d9c299"
```