Domain infotech, workplan prefix PRHOH-WP-. Adds the generated integration files; the bootstrap workplan is dropped for the same reason as elsewhere. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_0172sgCZEEDJcnQmr4SGDvKa Assistant: claude-code Assistant-Model: opus Assistant-Process: 1361245@bnt-lap001 Assistant-Session: b3b428ef-f3e6-4688-b091-01f71461d66a
787 B
787 B
SCOPE
This file was generated by
statehub register. Refine it as the repository boundaries become clearer.
One-liner
Public-relations campaign that composes and publishes posts about hall-of-helix work through the fluid-telegram interface.
Core Idea
pr-hall-of-helix exists to provide the capability described in INTENT.md.
In Scope
- Maintain the repository's primary implementation.
- Keep docs, tests, and operational metadata current.
Out of Scope
- Own unrelated adjacent systems.
- Make irreversible operational decisions without human approval.
Current State
- Status: active; implementation and stability should be verified by the repo agent.
Getting Oriented
- Start with: INTENT.md
- Agent instructions: AGENTS.md
- Workplans: workplans/