| id |
type |
title |
status |
version |
created |
updated |
workplan_task |
baseline |
related |
| SHR-ARCH-GATES-0001 |
architecture |
Migration and retirement acceptance gates v0.1 |
active |
0.1 |
2026-08-09 |
2026-08-09 |
SHR-WP-0001-T06 |
evidence/baseline-2026-08-09.yaml |
| GOAL.md |
| architecture/child-workplan-map_v0.1.md |
| inventory/state-hub-disposition.yaml |
| architecture/information-model_v0.1.md |
| architecture/hub-extension-architecture_v0.1.md |
|
Migration and retirement acceptance gates v0.1
Purpose
Turn GOAL.md success and project-retirement clauses into executable or
evidence-backed gates. Each gate has: id, statement, measurable evidence,
owner stream(s), and status.
Baseline snapshot: evidence/baseline-2026-08-09.yaml
(SHR-EVID-BASELINE-0001).
Status vocabulary: open | in_progress | met | waived (with rationale).
A. Project success gates (from GOAL.md)
G-IA — Canonical information model
|
|
| Statement |
Entities, relations, and kinds (events, signals, messages, conversations, requests, work, decisions, knowledge, telemetry) are defined with authority and correlation rules. |
| Evidence |
architecture/information-model_v0.1.md + .yaml (SHR-ARCH-IA-0001); human review optional for canon promotion. |
| Owner |
SHR-WP-0001-T03 |
| Status |
met (draft-reviewable; promotion residual) |
G-EXT — Hub / domain-extension contract
|
|
| Statement |
Versioned hub-core + domain-extension contract implements OA-relevant concepts and has a conformance suite. |
| Evidence |
Architecture + contract outline met at Tier 0 (hub-extension-architecture_v0.1.md, helixforge.hub-extension YAML). Conformance suite (Tier 1–3) still required. |
| Owner |
SHR-WP-0001-T04; suite → HUB-WP-0004 |
| Status |
in_progress (docs met; automated suite open) |
G-HUB-RUNTIME — Hub-core production runtime
|
|
| Statement |
Hub-core contains production runtime, contracts, SDK, extension registry, and compatibility surface required by active consumers. |
| Evidence |
Deployed hub-core image serving registry/messaging/events/projections; consumer smokes green; contract artefacts published. |
| Owner |
HUB-WP-0004 |
| Status |
open |
G-CORE-ABSORB — core-hub traffic absorbed
|
|
| Statement |
Production traffic formerly served by core-hub runs from consolidated hub-core; core-hub repository archived. |
| Evidence |
Dual-run report; cutover progress event; ops-hub + activity-core smokes on new host; forge archive flag; completion record with revisions. |
| Owner |
CORE-WP-0010 (depends HUB-WP-0004) |
| Status |
open |
G-RMGR — Repo Manager end-to-end
|
|
| Statement |
Repo Manager represents repositories end to end: file-backed work records, consistency, agent roles, change events, governed mutations. |
| Evidence |
RMGR-WP-0001 acceptance: contracts versioned; one repo vertical slice with Git evidence + rebuilt projection; extraction dispositions for State Hub repo/work surfaces. |
| Owner |
RMGR-WP-0001 |
| Status |
open |
G-DISP — Full disposition inventory
|
|
| Statement |
Every State Hub route, model, dataset, job, MCP tool, dashboard view, and known consumer has keep/move/replace/retire disposition. |
| Evidence |
inventory/state-hub-disposition.yaml (425 items, v0.1.1). Re-validate on material surface change before freeze. |
| Owner |
SHR-WP-0001-T02; maintenance → STATE-WP-0079 |
| Status |
met (initial complete; refresh before freeze) |
G-HANDOFF — Capabilities on new owners
|
|
| Statement |
All retained capabilities operate through new owners with compatibility, data-count, provenance, authorization, and failure-mode tests. |
| Evidence |
Per-slice: (1) owner API/port green tests; (2) row-count or content-hash compare vs pre-slice dump; (3) provenance fields present; (4) auth deny/allow cases; (5) failure-mode notes. Inventory move/replace items checked off. |
| Owner |
STATE-WP-0079 + RMGR / HUB / OPS / FIN / ACTIVITY streams |
| Status |
open |
G-FREEZE — Stabilization window
|
|
| Statement |
State Hub receives no normal reads or writes during an agreed stabilization window. |
| Evidence |
Window dates recorded in progress event; access logs / meter show only health/admin; agents and automation pointed at successors; exception log empty or residual-owned. |
| Owner |
STATE-WP-0079-T06 + operator |
| Status |
open |
| Suggested window |
≥ 7 consecutive days after last normal consumer cutover (operator may extend). |
G-BACKUP — Backup / restore / rollback / history
|
|
| Statement |
Backup, restore, rollback, and historical-query evidence accepted. |
| Evidence |
(1) Final pg_dump (or CNPG backup) of State Hub DB with checksum; (2) restore drill into isolated DB with count compare vs baseline/final; (3) documented rollback procedure exercised once in dual-run; (4) historical work queryable from Git files + archived dump for projections. |
| Owner |
STATE-WP-0079 + ops; baseline recovery paths in evidence/baseline-2026-08-09.yaml |
| Status |
open |
| Note |
Cluster scheduled backups not yet configured — manual dump is current path (state-hub/docs/cluster-operating-model.md). |
G-STOP — State Hub stopped and archived
|
|
| Statement |
State Hub stopped; repository and final data archived read-only. |
| Evidence |
Deployment scaled to zero / removed; forge repo archived; final dump stored with location recorded; INTENT marks retired; no scheduled jobs targeting SH API. |
| Owner |
STATE-WP-0079 + ops |
| Status |
open |
B. Project repository retirement gates (from GOAL.md)
| Gate |
Statement |
Evidence |
Status |
| P1 |
Every success gate above has accepted evidence |
Checklist in final report |
open (A-section) |
| P2 |
Residuals have live owners outside this repo |
Intake/WP ids with origin: residual |
open |
| P3 |
Decisions/architecture promoted to durable homes |
Paths in hub-core / custodian canon / child INTENT |
open (partial: project-repo flavor already in custodian) |
| P4 |
Child workplans finished, cancelled, or handed off |
Map statuses all terminal |
open |
| P5 |
Final project report (revisions, migrations, archives, obligations, rollback expiry) |
history/YYYY-MM-DD-completion.md |
open |
| P6 |
This repo completed + read-only after consistency/link check |
project_status: archived in GOAL.md; forge archive |
open |
C. Cross-cutting evidence rules
- Re-baseline before each major cutover — copy
evidence/baseline-*.yaml pattern with new date; never overwrite without rename.
- Counts — for data moves, capture pre/post totals for affected tables; ±0 unexplained rows fails the slice.
- Callers — known callers in baseline must be re-pointed or explicitly retired before G-FREEZE.
- Secrets — never in evidence files; dump storage location may be referenced, not contents.
- Correlation — cutover progress events include
correlation_id linking slice id, dump checksum, and PR links.
- Waiver — only with human progress note citing residual work-record id.
D. Baseline summary (2026-08-09)
| Metric |
Value |
| Topics |
14 |
| Workplans |
887 |
| Tasks |
5222 |
| Decisions |
89 |
| Domains |
14 |
| Managed repos |
105 |
| OpenAPI paths (live) |
135 |
| Inventory items |
425 |
| Disposition move / replace / keep / retire |
269 / 66 / 48 / 42 |
Availability: private tunnel only (127.0.0.1:8000). Recovery: manual CNPG dump + WSL2 fallback path.
E. Gate ownership matrix
| Gate |
Primary child WP |
| G-IA, G-DISP (initial) |
SHR-WP-0001 (done) |
| G-EXT suite, G-HUB-RUNTIME |
HUB-WP-0004 |
| G-CORE-ABSORB |
CORE-WP-0010 |
| G-RMGR |
RMGR-WP-0001 |
| G-HANDOFF, G-FREEZE, G-BACKUP, G-STOP |
STATE-WP-0079 (+ owners) |
| Domain hub conformance |
OPS-WP-0003, FIN-WP-0003 |
| Automation retarget |
ACTIVITY-WP-0029 |
| P1–P6 project archive |
this repo after children terminal |
F. Acceptance for T06
Foundation workplan SHR-WP-0001 delivers the gate definitions and baseline;
closing the gates is the implementation program (S1–S7 + evidence).