Advance UPC-WP-0002: close OH-2026-004 prep gap, draft S1 package, record command-day slip
T01: verified all five OH items still prepared in binky-control (no activity since 2026-08-08); the first-half-of-August command-day window lapsed at 0/5. Tracker now records the slip rather than carrying a stale date. OH-2026-004 prep gap closed in binky-control (92838e1) — batch is founder-blocked, not preparation-blocked. T02: gate-map G1/G8 evidence columns refreshed. T03: todo -> progress. Pre-drafted evidence/s1-decision-package.md with the decision question, three options, and an evidence table keyed to the OH ids; verdict cells fill once the batch drains. Not presented to the founder yet. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
This commit is contained in:
parent
217f7421c3
commit
8380634f4b
4 changed files with 106 additions and 10 deletions
|
|
@ -4,8 +4,8 @@ type: evidence
|
|||
repo: prj-unattended-progress-company
|
||||
parent_workplan: UPC-WP-0002
|
||||
created: "2026-08-12"
|
||||
updated: "2026-08-12"
|
||||
as_of: "2026-08-12"
|
||||
updated: "2026-08-16"
|
||||
as_of: "2026-08-16"
|
||||
---
|
||||
|
||||
# G1 office-hour batch tracker
|
||||
|
|
@ -16,8 +16,12 @@ API keys, or full OH body text here.
|
|||
|
||||
**Command-day runbook (binky-control):**
|
||||
`binky-control/officehour/2026-08-command-day-runbook.md`
|
||||
(Timing was “first two weeks of August 2026”; batch still open as of this
|
||||
tracker — schedule next available OH command day.)
|
||||
**Command day has slipped.** Planned window was “first two weeks of August
|
||||
2026”; that window closed with 0/5 drained. Verified 2026-08-16: all five OH
|
||||
items still `status: prepared` in `binky-control/OfficeHourQueue.md`, and
|
||||
binky-control has had no commits since 2026-08-08. **Scheduling the command day
|
||||
is now the single blocking founder action for G1** — it is not an agent-lane
|
||||
item and will not resolve itself.
|
||||
|
||||
**Closing rule:** when an OH item is `done` or deferred with residual in
|
||||
binky-control, update the row here, then refresh `architecture/gate-map.md`
|
||||
|
|
@ -30,7 +34,7 @@ G1/G8 (UPC-WP-0002-T02).
|
|||
| OH-2026-001 | StB mandate Bohle-Horsmann (JA 2025+) | prepared | **open** | — | RISK-006; Orange |
|
||||
| OH-2026-002 | DUO backlog + license transition | prepared | **open** | — | RISK-007; Orange; couples with 001 |
|
||||
| OH-2026-003 | Qonto cost/access review | prepared | **open** | — | Read path done (BINKY-WP-0005); plan *change* still Red if wanted |
|
||||
| OH-2026-004 | Handelsregister / address / articles | prepared | **open** | — | Weakest prep (`prepared_material: []`); public HR pull |
|
||||
| OH-2026-004 | Handelsregister / address / articles | prepared | **open** | — | Prep gap closed 2026-08-16 — `prepared_material` now filled (free handelsregister.de path, four verify fields, 2binky filing rule, notary=Red boundary) |
|
||||
| OH-2026-005 | Stripe delete stale preprod webhook | prepared | **open** | — | Lowest friction; dashboard click |
|
||||
|
||||
**Batch summary:** 0/5 closed. G1 remains **partial**.
|
||||
|
|
@ -72,7 +76,7 @@ G1/G8 (UPC-WP-0002-T02).
|
|||
| | |
|
||||
| --- | --- |
|
||||
| **Lane** | Orange (authority / public register) |
|
||||
| **Prep ready?** | **Weak** — queue has empty `prepared_material`; runbook has steps |
|
||||
| **Prep ready?** | Yes (as of 2026-08-16) — `prepared_material` filled in binky-control; was the batch's weakest item |
|
||||
| **Pointers** | runbook §4; Reactivation Plan Legal checklist; RISK residual on registry (RiskRegister) |
|
||||
| **Founder action** | handelsregister.de current excerpt; verify address + GF; retrieve/file articles under `2binky/`; note Unternehmensgegenstand vs OK mission (notary only if change needed — Red) |
|
||||
| **Agent follow-up (optional)** | After this OH day, improve binky `prepared_material` with file paths of downloaded excerpts (no PII dump into this project) |
|
||||
|
|
|
|||