UPC-WP-0002-T04: pre-close-out residual sweep; one gap found (AWQ-013)
Ran the ownership sweep early since it doesn't depend on the OH batch. Domain inventory, cartography, IP evidence and open-weights retarget already have live AWQ records; website, G4 load measurement and the G3 evidence pack are owned by UPC-WP-0004/0003. One genuine gap: Contracts/IP ownership (GmbH vs Bernd privately) existed only as an unchecked Reactivation Plan checkbox despite gating G5/G6. Now binky-control AWQ-013 (origin: residual, origin_ref: UPC-WP-0002-T04). T04 todo -> progress; closes after vessel close-out routes the command-day output. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
This commit is contained in:
parent
73fb3845ee
commit
88c8eda59e
1 changed files with 26 additions and 1 deletions
|
|
@ -126,7 +126,7 @@ invariant 5 prohibits. T03 stays `progress` until the batch drains.
|
|||
|
||||
```task
|
||||
id: UPC-WP-0002-T04
|
||||
status: todo
|
||||
status: progress
|
||||
priority: medium
|
||||
state_hub_task_id: "c6aca17d-b5d0-41eb-8175-61dc43d4b666"
|
||||
```
|
||||
|
|
@ -135,6 +135,31 @@ Anything remaining after vessel close-out that is not G1 (domain inventory
|
|||
AWQ-003, ecosystem cartography, etc.) must become a live residual in
|
||||
`binky-control` or a later UPC-WP — not prose-only in this WP.
|
||||
|
||||
**Progress (2026-08-16) — pre-close-out sweep.** Ran the ownership sweep early
|
||||
(it does not depend on the OH batch) against `inventory/baseline-g1-g9.md`,
|
||||
`architecture/gate-map.md`, and `binky-control/CompanyReactivationPlan.md`:
|
||||
|
||||
| Non-G1 obligation | Owner | Verdict |
|
||||
| --- | --- | --- |
|
||||
| Domain inventory, cartography, Eigenentwicklung IP evidence, open-weights retarget | AWQ-003, 006, 002, 012 | Live records already ✔ |
|
||||
| Website / digital presence | UPC-WP-0004 (linked children) | Owned ✔ |
|
||||
| G4 load measurement | UPC-WP-0003 (tasks proposed, not activated) | Owned ✔ |
|
||||
| G3 acceptance evidence pack | UPC-WP-0003 | Owned ✔ |
|
||||
| **Contracts / IP ownership (GmbH vs Bernd privately)** | — | **Gap → new `AWQ-013`** |
|
||||
|
||||
One real gap. The Reactivation Plan calls IP ownership clarification “needed
|
||||
before selling ecosystem products,” but it existed only as an unchecked
|
||||
checklist box with no work record — and it gates G5/G6, the immediate
|
||||
commercial move after the G1 drain. Now `binky-control` `AWQ-013`
|
||||
(`origin: residual`, `origin_ref: UPC-WP-0002-T04`). It is distinct from
|
||||
AWQ-002: that assembles IP *evidence*, this is the *determination* consuming
|
||||
it. Inventory table is green-lane; the allocation/transfer itself is Red
|
||||
(contracts, plausibly tax-relevant — worth an StB question once OH-2026-001
|
||||
lands).
|
||||
|
||||
T04 stays `progress`: the sweep is a pre-pass, and the task closes only after
|
||||
vessel close-out, when whatever the command day throws off is also routed.
|
||||
|
||||
## Acceptance evidence expected back here
|
||||
|
||||
- `evidence/g1-oh-batch.md` with all five OH items closed or residual-owned
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue