Assistant: codex Assistant-Model: gpt-5.6-sol Assistant-Session: 01a053ff-1d6f-7fe2-ac1c-a6eb40a42a0c
2.3 KiB
2.3 KiB
| id | type | title | domain | repo | status | owner | topic_slug | repo_goal_id | created | updated | state_hub_workstream_id |
|---|---|---|---|---|---|---|---|---|---|---|---|
| UPC-WP-0003 | workplan | Unattended dogfood acceptance and founder-load envelope (G3–G4) | infotech | prj-unattended-progress-company | proposed | bernd | infotech | 79a2b057-b765-47ad-b5d9-c1bbc49eba43 | 2026-08-11 | 2026-08-11 | 81b17b8a-4b22-5510-8830-a8d19aed821e |
Unattended dogfood acceptance and founder-load envelope (G3–G4)
Goal
- G3: Package acceptance evidence that at least one end-to-end Green/Blue loop runs unattended with audit trail (already largely built in BINKY-WP-0004/0006).
- G4: Define and start a ≥30-day founder-load measurement against the 1–3 h/day + ~2 OH days/month envelope.
Parent goal: 79a2b057-…. Depends on foundation maps; can run in parallel
with UPC-WP-0002 after T01 evidence folder exists.
Linked children
| ID / artefact | Role |
|---|---|
| BINKY-WP-0004, 0006 | Executor + llm-connect rhythm (finished) |
AWQ-011 / REIN-A-0003 / ops_run ad0b05c4-… |
Weekly review production proof |
audits/OK-Audit-v0-binky.md |
Dogfood audit |
OperatingRhythm.md, briefs/ |
Cadence evidence |
| missing load metric | G4 design needed in binky-control |
Tasks (proposed — activate when UPC-WP-0002 is underway or G1 not blocking)
id: UPC-WP-0003-T01
status: todo
priority: high
state_hub_task_id: "57636795-371d-56ac-b4f4-cfcf2968e133"
Write evidence/g3-dogfood-acceptance.md linking finished child WPs, audit,
and at least one production ops_run; list any residual that prevents founder
S3 mark.
id: UPC-WP-0003-T02
status: todo
priority: high
state_hub_task_id: "b38eebc3-51a7-54e4-a4d3-8f8edfc16aac"
Specify founder-load measurement (what counts, log location, Red exceptions)
in a short design note under architecture/ and ensure a live residual or
child intake in binky-control owns ongoing logging.
id: UPC-WP-0003-T03
status: todo
priority: medium
state_hub_task_id: "d79967eb-a270-53aa-a501-0a4f38d8c1cc"
After ≥30 days of measurement (or first checkpoint), update gate-map G3/G4 and prepare founder decision packages for S3 / load-budget claims.
Acceptance
- G3 evidence pack complete; S3 mark requested or residual explicit
- G4 measurement live as a work record outside this file’s prose