id type repo parent_workplan repo_goal_id created reviewed
UPC-GATE-MAP-0001 gate-map prj-unattended-progress-company UPC-WP-0001 79a2b057-b765-47ad-b5d9-c1bbc49eba43 2026-08-11 2026-08-11

Gate-to-evidence map (G1G9)

Maps every GOAL.md success gate to owning repos, known child workplans / queues, evidence pointers, status, and blockers. Link by ID only — task lists live in the owning repos.

Status vocabulary: open | partial | met.

Gate Title Owning repo(s) Known child workplans / loops Evidence path or missing Status Blockers
G1 Administratively clean binky-control BINKY-WP-0002 (done); OH-2026-001…005; RISK-006/007; Phase 1 checklist CompanyReactivationPlan.md Phase 1; audits/OK-Audit-v0-binky.md; finance/CostRunRate.md + Qonto pull; OH queue items prepared — Handelsregister verify, StB mandate, DUO transition still open partial Orange: StB, DUO, Handelsregister, Qonto review; Red: bank plan changes, notary if purpose change
G2 Company OS active binky-control BINKY-WP-0001…0003 (done); OperatingRhythm; DecisionQueue; OfficeHourQueue; AutopilotWorkQueue; ControlLoopCatalog INTENT.md v1.0 ratified DEC-2026-001; AutonomyPolicy.md; daily briefs through 2026-08-08; queues live partial → near met Policy “in force” is operationally true; formal checklist still marks some governance boxes open in Reactivation Plan
G3 Dogfood loop closed binky-control, Railiance/activity-core/llm-connect BINKY-WP-0003…0006 (finished); REIN-A-0003 weekly review OK-Audit v0 dogfood; rhythm on Railiance without host coding agent; ops_run ad0b05c4-… weekly review proof 2026-08-08 partial → strong Need a named “S3 acceptance” evidence pack in this project; founder milestone status still on S3
G4 Founder load within budget binky-control (measure), this project (gate evidence) none dedicated missing — no ≥30-day CEO time envelope log / KPI open Design + measure load; requires definition of what counts as “routine company ops” vs Red exceptions
G5 External offer published binky-control (+ website/domain as needed) BINKY-WP-0002-T04 (draft done); OfferCatalog flagship OfferCatalog.md — OK Audit drafted, publishing Yellow-lane decision package not closed open Yellow decision to publish; domain/website residual (AWQ-003, Reactivation digital presence)
G6 First paid revenue binky-control, finance path BINKY-WP-0005/0007 (Qonto read path finished) Qonto evidence of costs/credits; Binect-related credit noted — no booked external product/service sale open Depends on G5 + delivery; Red for contracts/payment setup if needed
G7 Repeatable path product/service repos after first delivery gap missing unit economics / productized delivery after first sale open Premature until G5G6; residual to durable product repos
G8 Decision surface thin binky-control DecisionQueue hygiene; OH batching; AutonomyPolicy lanes DecisionQueue: prepared items resolved pattern; OH: 5 prepared items batched; AWQ mostly closed/optional partial Material admin still blocked on Orange OH batch (not “nobody asked Bernd” — but not thin until G1 OH drain)
G9 Residuals owned outside project all participating repos work-record residual convention; AWQ residual intakes Pattern exists (e.g. AWQ residuals with origin_ref); project not complete so gate open by definition open Close only at project retirement; enforce residual handoff as each UPC-WP finishes

Cluster view (for sequencing)

Cluster Gates Dominant state Coordination home
Company vessel G1, residual G2 G1 blocks clean vessel UPC-WP-0002 (drafted)
Unattended + load G3, G4 G3 strong; G4 missing future UPC-WP-0003
Revenue path G5, G6, G7 Offer drafted only future UPC-WP-0004
Governance close G8, G9 partial / endgame continuous + retirement