prj-unattended-progress-com.../workplans/UPC-WP-0004-first-offer-and-revenue.md
tegwick b586296998 Close loose ends: G3 evidence pack, G4 load design, mark blocked workplans
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>

Assistant: claude-code
Assistant-Model: sonnet
Assistant-Process: 293620@bnt-lap001
Assistant-Session: 50ae9ffb-1cc3-48ec-8cfe-1941bcf2f2fb
2026-09-28 23:11:36 +02:00

2.3 KiB
Raw Blame History

id type title domain repo status flavor owner topic_slug repo_goal_id created updated state_hub_workstream_id
UPC-WP-0004 workplan First external offer and paid revenue path (G5–G6) infotech prj-unattended-progress-company blocked planning bernd infotech 79a2b057-b765-47ad-b5d9-c1bbc49eba43 2026-08-11 2026-09-28 a6cf0a20-a3d5-56c6-8fc7-8cb167c71d66

First external offer and paid revenue path (G5–G6)

Goal

Coordinate G5 (external offer published) and G6 (first paid revenue) without owning sales delivery code. G7 (repeatable path) is residual to product repos after first sale.

Prefer starting after G1 vessel is credible (UPC-WP-0002) so public claims match admin reality.

Linked children

Artefact Role
binky-control/OfferCatalog.md Flagship OK Audit drafted
BINKY-WP-0002-T04 Draft complete; publish Yellow
Domain / website residuals (AWQ-003, Reactivation digital presence) Public surface
Qonto / finance WPs 0005/0007 Payment observation path

Tasks (proposed)

id: UPC-WP-0004-T01
status: todo
priority: high
state_hub_task_id: "cd349f71-aa8b-5480-80c2-38083aa16f58"

Ensure a Yellow decision package exists in binky-control DecisionQueue for publishing the Operational Knowledge Audit (price, segment, channel). Link id from evidence/g5-publish.md.

id: UPC-WP-0004-T02
status: todo
priority: high
state_hub_task_id: "86cf36f9-0330-538b-8c79-4f62b75bb331"

Track publish artefacts (public page or equivalent) and update gate-map G5 when live.

id: UPC-WP-0004-T03
status: todo
priority: medium
state_hub_task_id: "0f7fd4f6-f320-5715-be1c-0a9536516e65"

Track first external paid engagement to booked payment evidence (pointer only into finance/Qonto or invoice record). Update G6; hand G7 productization to a durable repo residual.

Blocked (2026-09-28): no task is doable inside this repo. T01 needs a Yellow package written into binky-control's DecisionQueue (none exists; the queue has no OK Audit publish entry); T02/T03 follow publish and a sale. Public claims should also wait on G1 (UPC-WP-0002).

Acceptance

  • G5 evidence: public sellable offer
  • G6 evidence: one external payment booked
  • G7 residual owned outside this project