prj-unattended-progress-com.../architecture/founder-load-measurement.md
tegwick b586296998 Close loose ends: G3 evidence pack, G4 load design, mark blocked workplans
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>

Assistant: claude-code
Assistant-Model: sonnet
Assistant-Process: 293620@bnt-lap001
Assistant-Session: 50ae9ffb-1cc3-48ec-8cfe-1941bcf2f2fb
2026-09-28 23:11:36 +02:00

1.6 KiB
Raw Blame History

id type repo parent_workplan created status
UPC-ARCH-G4-LOAD-0001 design-note prj-unattended-progress-company UPC-WP-0003 2026-09-28 draft

G4 founder-load measurement (design)

Gate G4: CEO time stays within ~1–3 h/day plus ~2 office-hour days/month for routine company ops, measured over ≥30 calendar days.

What counts

  • Counts: reading briefs, approving/rejecting Yellow packages, office-hour (Orange) sessions, and any Green/Blue failure the founder has to repair.
  • Does not count against the budget (logged, not budgeted): Red-lane actions (signing, bank plan change, notary, contracts, risk acceptance). Each is logged as a Red exception with its id; G4 fails if Red exceptions become the default rather than rare.
  • Out of scope: product/engineering work on the ecosystem, and founder time on non-Binky matters.

Log

One line per day, kept in binky-control (owner of the operating rhythm), e.g. briefs/load-log.csv: date, minutes_routine, minutes_oh, red_exceptions (ids), note. The founder enters minutes at end of day (≤1 min); the weekly review brief summarises the trailing 7 and 30 days against the envelope.

Pass rule

Over a window of ≥30 consecutive days: mean routine ≤3 h/day, at most ~2 OH days per month, and Red exceptions each individually justified.

Open point (needs a binky-control write)

An intake/residual in binky-control must own the ongoing logging (create log file, add the summary to the weekly review). That lives outside this repo and has not been created here — see UPC-WP-0003-T02.