prj-unattended-progress-com.../workplans/UPC-WP-0003-unattended-and-load.md
tegwick 0fb5c7a8b5 Complete UPC-WP-0001 foundation: gate map, inventory, next WPs.
Deliver G1–G9 gate-to-evidence and child-workplan maps, baseline inventory
from binky-control, and proposed UPC-WP-0002–0004 for vessel, load, and
revenue clusters. Mark foundation finished with DoD-Ok.
2026-08-11 02:30:48 +02:00

2.1 KiB
Raw Blame History

id type title domain repo status owner topic_slug repo_goal_id created updated
UPC-WP-0003 workplan Unattended dogfood acceptance and founder-load envelope (G3G4) infotech prj-unattended-progress-company proposed bernd infotech 79a2b057-b765-47ad-b5d9-c1bbc49eba43 2026-08-11 2026-08-11

Unattended dogfood acceptance and founder-load envelope (G3G4)

Goal

  1. G3: Package acceptance evidence that at least one end-to-end Green/Blue loop runs unattended with audit trail (already largely built in BINKY-WP-0004/0006).
  2. G4: Define and start a ≥30-day founder-load measurement against the 13 h/day + ~2 OH days/month envelope.

Parent goal: 79a2b057-…. Depends on foundation maps; can run in parallel with UPC-WP-0002 after T01 evidence folder exists.

Linked children

ID / artefact Role
BINKY-WP-0004, 0006 Executor + llm-connect rhythm (finished)
AWQ-011 / REIN-A-0003 / ops_run ad0b05c4-… Weekly review production proof
audits/OK-Audit-v0-binky.md Dogfood audit
OperatingRhythm.md, briefs/ Cadence evidence
missing load metric G4 design needed in binky-control

Tasks (proposed — activate when UPC-WP-0002 is underway or G1 not blocking)

id: UPC-WP-0003-T01
status: todo
priority: high

Write evidence/g3-dogfood-acceptance.md linking finished child WPs, audit, and at least one production ops_run; list any residual that prevents founder S3 mark.

id: UPC-WP-0003-T02
status: todo
priority: high

Specify founder-load measurement (what counts, log location, Red exceptions) in a short design note under architecture/ and ensure a live residual or child intake in binky-control owns ongoing logging.

id: UPC-WP-0003-T03
status: todo
priority: medium

After ≥30 days of measurement (or first checkpoint), update gate-map G3/G4 and prepare founder decision packages for S3 / load-budget claims.

Acceptance

  • G3 evidence pack complete; S3 mark requested or residual explicit
  • G4 measurement live as a work record outside this files prose