Strategic-merge patches and a kustomization over the checksum-pinned upstream assets, a runbook with the rollout-deadlock and HPA lessons, offline tests, and RAIL-KNATIVE-WP-0002 with the railiance-cluster installer handoff as a wait task. Verified read-only against live. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com> Assistant: claude-code Assistant-Model: opus Assistant-Process: 63291@bnt-lap001 Assistant-Session: 8bd77868-ca68-4f49-bb1e-d539ecc0d703
2.8 KiB
Knative substrate runbook: declared CPU requests
The Knative Serving and Kourier v1.22.0 install on railiance01 is performed by
railiance-cluster/install/knative/install.sh from checksum-pinned upstream
assets. rail-knative declares the CPU requests that install must carry, in
substrate/v1.22.0/cpu-requests.patch.yaml (strategic-merge patches) and
substrate/v1.22.0/kustomization.yaml (overlay for the staged core.yaml and
kourier.yaml; crds.yaml stays a separate first apply).
| Deployment | Container | Upstream v1.22.0 | Declared |
|---|---|---|---|
| knative-serving/activator | activator | 300m | 50m |
| kourier-system/3scale-kourier-gateway | kourier-gateway | 200m | 50m |
| knative-serving/net-kourier-controller | controller | 200m | 30m |
| knative-serving/controller | controller | 100m | 30m |
| knative-serving/webhook | webhook | 100m | 30m |
| knative-serving/autoscaler | autoscaler | 100m | 30m |
Only CPU requests differ from upstream. Memory requests and all limits are
upstream's. These values were set live on 2026-09-21 as
ADMINISTER @ realm:kubernetes/railiance01, activation=APPROVED by the founder,
because the node had 100% of its allocatable CPU requested and backups could
not be scheduled. Record: the-custodian/docs/kubernetes-change-gate-decision.md.
A plain re-apply or upgrade of the upstream manifests restores the upstream
column. Every apply or upgrade must apply these patches afterwards, and an
upgrade to a new version needs a new substrate/<version>/ with container
names re-checked against that release.
Lessons
A request cut cannot roll out on a node whose requests are exhausted. A rolling update creates the new pod before the old one stops. When no CPU is left to request, the new pod stays Pending, so the old pod never stops, even though the change would free capacity. On 2026-09-21 all six rollouts deadlocked until 50m was freed elsewhere. Free capacity before changing a Deployment's requests; then the first rollout frees more for the next.
The HPAs scale on percent of request. The HPAs on the activator, the Kourier gateway and the webhook target 100% CPU utilisation of the request. Lowering a request makes the same load read as a higher percentage, so the HPA scales out sooner (at about 50m or 30m of use, not 300m or 100m). At 2026-09-21 use they read about 2-10%. If the request is raised or lowered again, check the HPA targets in the same change.
Read-only drift check
ssh railiance01 'kubectl get deploy -n knative-serving -o jsonpath="{range .items[*]}{.metadata.name} {.spec.template.spec.containers[0].resources.requests.cpu}{\"\n\"}{end}"; kubectl get deploy -n kourier-system -o jsonpath="{range .items[*]}{.metadata.name} {.spec.template.spec.containers[0].resources.requests.cpu}{\"\n\"}{end}"; kubectl get hpa -n knative-serving; kubectl get hpa -n kourier-system'