Close Vergabe binding and record remaining recovery blockers
Assistant: codex Assistant-Model: gpt-6-astra Assistant-Session: 01a0e3b3-11fe-7ba0-a4a3-92331aab0ba1
This commit is contained in:
parent
1839c0ba42
commit
cfbc95e11d
6 changed files with 136 additions and 36 deletions
58
docs/evidence/2026-09-27-vergabe-binding-review.md
Normal file
58
docs/evidence/2026-09-27-vergabe-binding-review.md
Normal file
|
|
@ -0,0 +1,58 @@
|
|||
# Vergabe binding and loose-end review — 2026-09-27
|
||||
|
||||
Reviewed every workplan, including archived files. RAPPS-WP-0014 is the only
|
||||
unfinished workplan; all other task blocks are done. No ready or proposed
|
||||
workplan remains. No new workplan or task was created.
|
||||
|
||||
## Binding verification (read-only)
|
||||
|
||||
| Check | Result |
|
||||
| --- | --- |
|
||||
| Node / cluster | Ready, 92.205.62.239; kube-system UID a553c742-0115-43d4-99a4-a5ca56fe0786 |
|
||||
| Helm | vergabe-demo-company / vergabe-teilnahme, deployed revision 3, chart 0.2.1 |
|
||||
| Deployment | Ready 1/1; image sha256:a26444f59c259698159c69ccb96f73dc648a261ece4c86bb2037a9d977870d91 |
|
||||
| Requests / custody reference | 60m CPU, 256Mi memory; envFrom Secret reference vergabe-demo-env |
|
||||
| Media / issue state | vergabe-teilnahme-media 5Gi and vergabe-teilnahme-app-state 1Gi, both Bound, local-path |
|
||||
| TLS / health | vergabe-demo-tls Ready; HTTPS /demo-company/health/ returned 200 |
|
||||
| Chart regression suite | 8 tests passed |
|
||||
| Helm lint | Passed with admitted values plus SSO overlay |
|
||||
|
||||
Commands: `kubectl get nodes -o wide`, explicit namespace/deployment field
|
||||
queries, `kubectl -n vergabe-demo-company get deployment,pvc,certificate`,
|
||||
`helm list -n vergabe-demo-company -o json`, HTTPS health request,
|
||||
`python3 -m unittest discover -s tests -p 'test_vergabe_pilot_chart.py'`, and
|
||||
`helm lint charts/vergabe-teilnahme -f helm/vergabe-demo-company-values.proposed.yaml
|
||||
-f helm/vergabe-demo-company-sso.proposed.yaml`.
|
||||
|
||||
The image/source/CI receipt is
|
||||
[the revision 3 rollout](2026-09-12-account-recovery-live.md).
|
||||
Database/role isolation and initial membership counts retain their dated
|
||||
receipts in [the binding](../vergabe-demo-company-binding.md); no current user
|
||||
list, database contents or Secret values were read for this review.
|
||||
VERGABE-WP-0019 records the September 24 founder sign-in and still waits for
|
||||
the fresh recipient journey and two-user acceptance. T02 can close on its
|
||||
release-binding scope without claiming those separate gates passed.
|
||||
|
||||
## Remaining recovery gate
|
||||
|
||||
[September 25](2026-09-25-vergabe-demo-company-restore.md) proves a database
|
||||
restore and pod restart only. File claims were empty and the encrypted database
|
||||
artifact remained on the workstation. It does not prove populated media/issue
|
||||
state recovery, off-host delivery, restored user workflow or safe rollback.
|
||||
|
||||
`warden route find` and `warden route show railiance-backup-offsite-lane`
|
||||
identify railiance-platform's OpenBao/Nextcloud lane. With the documented local
|
||||
OpenBao tunnel explicitly selected, `tools/check-backup-lane-auth.sh` confirmed
|
||||
OpenBao is unsealed but returned **no valid caller token**. Bernd Worsch's
|
||||
attended authentication is required for this workstation upload path; no secret
|
||||
was fetched. This does not establish the health of separate unattended jobs.
|
||||
|
||||
RAPPS-WP-0014-T03 waits for the company workflow, a coherent off-host recovery
|
||||
point for all three stores, isolated restored workflow, rollback evidence and
|
||||
named support/incident ownership. The workplan is blocked. Existing product
|
||||
owner tasks VERGABE-WP-0019-T04/T06 retain human acceptance. No runtime mutation,
|
||||
substitute user login, backup upload or new recovery claim was made.
|
||||
|
||||
The policy-nexus ArgoCD inbox proposal was read. It belongs to the existing
|
||||
rApp/platform onboarding plans and supplies no unfinished task in this repo;
|
||||
this review does not approve its live adoption or open another plan.
|
||||
Loading…
Add table
Add a link
Reference in a new issue