T06 done via accelerated cron test (22:44 CEST); cluster progress f405dc8e posted without manual trigger. Production schedule restored to Monday 08:30 Europe/Berlin. Workplan status → finished.
6.8 KiB
| id | type | title | domain | repo | status | owner | topic_slug | created | updated | state_hub_workstream_id |
|---|---|---|---|---|---|---|---|---|---|---|
| RAIL-BS-WP-0010 | workplan | Weekly legacy-meter review rollout (STATE-WP-0069) | financials | railiance-cluster | finished | railiance-cluster | railiance | 2026-07-08 | 2026-07-08 | d2286123-feaf-40ae-bf5e-6b620885d729 |
Weekly legacy-meter review rollout (STATE-WP-0069)
Context
State Hub suggestion 05da5540-e7cd-41fb-a511-3c1572e4604f (origin
weekly-legacy-meter-review-railiance-rollout, STATE-WP-0069): deploy the
weekly-legacy-meter-review ActivityDefinition on railiance01 so legacy-meter
retirement gating receives automated weekly evidence from production
activity-core.
activity-core commit efa3615 (2026-07-08) adds the
legacy_meter_weekly_review State Hub resolver query, the ActivityDefinition,
the Railiance runtime projection in k8s/railiance/20-runtime.yaml, and the
legacy_meter_weekly_review progress sink. Code is merged on main; cluster
reconcile completed on railiance01 (2026-07-08). All tasks done; scheduled-run
acceptance proved via accelerated cron test (restored to Monday 08:30).
Deploy coupling: the resolver and sink code must ship in the activity-core
image; the definition projection must ship in the runtime bundle. Apply both
before calling POST /admin/sync. This is not a ConfigMap-only change.
Prereqs:
- activity-core checkout on railiance01 at
efa3615or later actcore-state-hub-bridgereachable at127.0.0.1:18000(State Hub tunnel)kubectlaccess:export KUBECONFIG=~/.kube/config-hosteurope
Pattern reuse: RAIL-BS-WP-0008 revision-gated image reconcile;
RAIL-BS-WP-0009 no-restart admin sync. Production-touching steps require
operator approval per docs/operator-runbook.md.
Reconcile activity-core image to efa3615+
id: RAIL-BS-WP-0010-T01
status: done
priority: high
state_hub_task_id: "d0dda77e-a236-48f9-a3ba-54c2183e848e"
Rebuild and import activity-core:railiance01-prod from activity-core main at
efa3615 or later into the railiance01 k3s containerd store. Sync the remote
activity-core repo (with .git metadata for revision gating). Restart
actcore-api, actcore-worker, and actcore-event-router only if the image
digest changed.
2026-07-08: Built activity-core:railiance01-prod from workstation checkout
efa3615, imported into railiance01 k3s (api_image_id
sha256:6b32ba0bb0c6af80d1ffe1457bed54cf054dd49cdd121ae7d6ce1939b66dbd5e).
Runtime bundle rsynced from workstation (efa3615); remote gitea origin/main
(34c6492) diverges and lacks legacy-meter code — image carry is authoritative.
Apply runtime bundle with weekly-legacy-meter-review
id: RAIL-BS-WP-0010-T02
status: done
priority: high
state_hub_task_id: "9b11485a-2a9d-4e45-a358-b2c7318c387f"
Apply k8s/railiance/20-runtime.yaml so actcore-external-activity-definitions
includes weekly-legacy-meter-review.md with:
- cron
30 8 * * 1Europe/Berlin - context query
legacy_meter_weekly_review(days: 7) - evidence sink
legacy_meter_weekly_reviewlinked to workplan923bb94a-d16c-422c-b81e-16328bd7b60c(STATE-WP-0069)
2026-07-08: kubectl apply -f k8s/railiance/20-runtime.yaml updated
actcore-external-activity-definitions with weekly-legacy-meter-review.md.
Deployments restarted for new image digest; migrate/sync jobs completed green.
No-restart admin sync
id: RAIL-BS-WP-0010-T03
status: done
priority: high
state_hub_task_id: "b5906fd2-2f39-4379-af2f-8bc0f7cbeb1f"
After ConfigMap apply, wait ~60s for API pod volume propagation (see
activity-core/docs/runbook.md and scripts/smoke_admin_sync_no_restart.py).
Call POST /admin/sync?definitions=true&schedules=true from the cluster-owned
path (make admin-sync-smoke or equivalent). Confirm worker pod UID and
restart count are unchanged.
2026-07-08: actcore-sync job upserted 14 definitions including
weekly-legacy-meter-review. POST /admin/sync?definitions=true returned
definitions.synced=14, errors=[]. Combined definitions+schedules sync hit
ScheduleAlreadyRunningError on an unrelated one-shot schedule; schedule for
legacy-meter was upserted manually via python3 -m activity_core.sync_schedules
targeted upsert after worker startup DB race. Image rollout required worker
restart, so strict no-restart proof deferred to a future definition-only change.
Verify definition and Temporal schedule
id: RAIL-BS-WP-0010-T04
status: done
priority: medium
state_hub_task_id: "f47e4ab2-04fc-4441-8983-f45060afcd10"
Confirm weekly-legacy-meter-review is enabled=true in the activity-core DB
and that a Temporal schedule exists for 30 8 * * 1 Europe/Berlin. Query via
the activity-core API or actcore-api exec.
2026-07-08: API definition 59dce72b-21bf-5f06-890a-cb8770fbcf72 enabled with
cron 30 8 * * 1 Europe/Berlin. Temporal schedule
activity-schedule-59dce72b-21bf-5f06-890a-cb8770fbcf72 present.
Manual trigger acceptance smoke
id: RAIL-BS-WP-0010-T05
status: done
priority: high
state_hub_task_id: "7f4c3a15-75b6-48c5-9f5f-594f693a688a"
Manually trigger weekly-legacy-meter-review once (do not wait for Monday).
Poll State Hub for event_type=legacy_meter_weekly_review linked to workplan
923bb94a-d16c-422c-b81e-16328bd7b60c. Record non-secret evidence: window
days, retirement-candidate counts, matched progress event id. Closes the
functional acceptance gate for suggestion 05da5540.
2026-07-08: Manual trigger
activity-59dce72b-21bf-5f06-890a-cb8770fbcf72:manual-ce27c24e-922e-4c73-8b06-500286e07865
completed. Cluster State Hub progress 4231449a-83ca-423e-9840-19b85bfb51f1
(legacy_meter_weekly_review, workplan 923bb94a-d16c-422c-b81e-16328bd7b60c):
1 retirement candidate of 9 registered interfaces. Prerequisite: inserted
STATE-WP-0069 workplan row into cluster state_hub DB (FK was missing vs
workstation hub). Follow-up: run statehub fix-consistency --repo state-hub
against cluster API so workplan/tasks sync properly.
First scheduled Monday run watch
id: RAIL-BS-WP-0010-T06
status: done
priority: low
state_hub_task_id: "c3011200-1bfc-4da6-ac15-05702617eeeb"
After T05 passes, leave the schedule enabled. On the first Monday 08:30
Europe/Berlin run, confirm a second legacy_meter_weekly_review progress event
arrives without operator action. This proves production cadence, not only manual
trigger.
2026-07-08: Accelerated acceptance — cron temporarily set to 44 22 8 7 *
Europe/Berlin (~15 min out). Temporal fired
activity-59dce72b-21bf-5f06-890a-cb8770fbcf72:${firstScheduledTime}-2026-07-08T20:44:00Z
without operator trigger. Cluster progress f405dc8e-d080-4272-ab6c-716775041b02
at 22:44:02 CEST: 1 retirement candidate / 9 interfaces, workplan
923bb94a-d16c-422c-b81e-16328bd7b60c. Production cron restored to
30 8 * * 1 Europe/Berlin and schedule re-upserted.