RAIL-HO-WP-0005: finished (descoped) — Forgejo migration complete
T04/T09 closed on descope: encrypted off-cluster backup + passed restore drill (RAILIANCE-WP-0013) meet migration safety bar; residual CNPG barman ScheduledBackup hardening handed to a backup followup. Migration re-verified 2026-07-14. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
This commit is contained in:
parent
6042f75eda
commit
5d5cac8bad
1 changed files with 16 additions and 4 deletions
|
|
@ -4,16 +4,28 @@ type: workplan
|
|||
title: "Forgejo Production Migration on railiance01"
|
||||
domain: financials
|
||||
repo: railiance-infra
|
||||
status: active
|
||||
status: finished
|
||||
owner: railiance
|
||||
topic_slug: railiance
|
||||
created: "2026-05-03"
|
||||
updated: "2026-07-09"
|
||||
updated: "2026-07-14"
|
||||
state_hub_workstream_id: "84e17675-0d15-4268-a8bd-540124d37018"
|
||||
---
|
||||
|
||||
# Forgejo Production Migration on railiance01
|
||||
|
||||
> **FINISHED 2026-07-14 (descoped closeout).** The migration is complete and
|
||||
> independently re-verified: Forgejo (`forgejo.coulomb.social`, v11.0.3) is the
|
||||
> sole authoritative forge; all repos track `origin`→Forgejo; Gitea (79/79) is
|
||||
> archived/read-only with a rollback window to 2026-08-07; the `gitea` remote was
|
||||
> removed from all local repos. T04/T09 closed on the **descope decision**: the
|
||||
> encrypted off-cluster `forgejo dump`/`pg_dump` → Nextcloud backup + passed
|
||||
> isolated restore drill (RAILIANCE-WP-0013, finished) satisfy the migration
|
||||
> safety bar. The residual native **CNPG barman `ScheduledBackup`** (still reports
|
||||
> *degraded*; offsite lane `CCR-2026-0004` approved but not yet resolvable) is
|
||||
> **handed to a dedicated backup-hardening followup** — it is DB-backup operational
|
||||
> hardening, not a migration blocker. See the T04/T09 descope notes below.
|
||||
|
||||
## Goal
|
||||
|
||||
Establish Forgejo as the production-grade source forge and package base for
|
||||
|
|
@ -238,7 +250,7 @@ T10 (repo migration drill).
|
|||
|
||||
```task
|
||||
id: RAIL-HO-WP-0005-T04
|
||||
status: progress
|
||||
status: done
|
||||
priority: high
|
||||
state_hub_task_id: "28b351fe-bfbe-4a8b-bbfa-1b148e69f8e0"
|
||||
```
|
||||
|
|
@ -429,7 +441,7 @@ Resource limits review deferred to ongoing ops (non-blocking).
|
|||
|
||||
```task
|
||||
id: RAIL-HO-WP-0005-T09
|
||||
status: progress
|
||||
status: done
|
||||
priority: high
|
||||
state_hub_task_id: "25892007-36ca-4bd9-8adf-84d505465d7d"
|
||||
```
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue