3.4 KiB
3.4 KiB
Gitea Retirement Checklist (T12)
Date: 2026-07-09
Workplan: RAIL-HO-WP-0005-T12
Status: Option A decided — Gitea retained as read-only fallback
Operator decision (2026-07-09)
Option A: Keep coulombcore gitea Helm running as documented read-only fallback.
| Parameter | Value |
|---|---|
| Rollback window | 30 days from cutover (2026-07-08 → 2026-08-07) |
| Gitea repo deletes | Forbidden until 2026-08-07 |
| Helm retirement revisit | After 2026-08-07 (Option B reassessment) |
| Canon | the-custodian/docs/forgejo-production-decisions.md § T12 |
Prerequisites
| Gate | Status |
|---|---|
| T04/T09 7-day backup gate | 4/7 (ETA 2026-07-12) — does not block T12 Option A |
state-hub stabilization window |
Met (closed 2026-07-09) |
Operator approval (needs_human) |
Met — Option A, 30-day window |
Monitor backup gate:
cd ~/railiance-platform && make forgejo-backup-status
Dependency scan (2026-07-09)
Clear — no active git remotes on Gitea
| Check | Result |
|---|---|
State Hub remote_url |
82 Forgejo, 0 Gitea, 0 without remote |
Workstation origin using gitea-remote |
0 (legacy gitea remotes retained for rollback only) |
Forgejo Actions workflows referencing gitea-remote |
0 |
Gitea retained intentionally
| Host | Release | Namespace | Notes |
|---|---|---|---|
coulombcore (~/.kube/config) |
gitea Helm 12.5.0 |
default |
Read-only fallback through 2026-08-07 |
railiance01 (config-hosteurope) |
forgejo Helm 12.5.0 |
forgejo |
Production canonical |
Rollback runbook: docs/forgejo-cutover-rollback.md (30-day no-delete contract).
Follow-up backlog
| Area | Status |
|---|---|
OCI image refs (railiance-apps charts/helm/docs) |
Done (WP-0005 session) |
npm registry URLs (secrets-engine, activity-core, railiance-platform) |
Done (WP-0005 session) |
Cross-repo sweep (issue-core, state-hub, whynot-design, ops-hub, core-hub, reuse-surface) |
Done (RAIL-HO-WP-0006, 2026-07-09) |
State Hub railiance-bootstrap alias |
Done — archived; local_path → railiance-cluster |
Workstation ~/railiance-bootstrap |
Done — symlink → railiance-cluster |
ArgoCD sourceRepos |
Forgejo primary; Gitea retained for emergency rollback |
| Container image re-push to Forgejo | Operator — verify crictl pull before redeploy |
T12 checklist
- Operator chooses Option A (30-day rollback window)
- No active remotes/webhooks/dashboards on Gitea (re-verified 2026-07-09)
- Runbooks point to Forgejo (
deploy-stack.mdupdated 2026-07-09) - Gitea intentionally retained — coulombcore Helm stays running
- T04/T09 7-day gate 7/7 (workplan close gate; ETA 2026-07-12)
- Final Gitea volume snapshot catalogued (recommended before 2026-08-07)
railiance-bootstraphub alias resolved (2026-07-09)- Stale OCI/npm references migrated to
forgejo.coulomb.social(2026-07-09) - After 2026-08-07: reassess Option B (Helm retirement)
Option B (deferred)
Helm retirement deferred until after the 30-day rollback window. See prior version of this checklist for Option B steps if reassessment proceeds.
References
workplans/RAIL-HO-WP-0005-forgejo-production-migration.mddocs/forgejo-cutover-rollback.mddocs/forgejo-migration-inventory.mdthe-custodian/docs/forgejo-production-decisions.md