railiance-master/history/260818-demand-canon-policy-alignment.md

2.8 KiB

id type status received reviewed reviewer source consumer resulting_workplan
RMASTER-DEMAND-2026-08-18-001 demand-review accepted 2026-08-18 2026-08-18 codex operator railiance-master maintainers and architecture consumers RMASTER-WP-0024

Review: align railiance-master with InfoTechCanon and policy-nexus

Demand signal

Review and update the repository's intent and current scope against the newer InfoTechCanon repository structure and policy-nexus authority model, then identify and execute the obvious alignment work.

Consumer purpose

Maintainers and downstream Railiance repositories need to tell, without reconstructing context from multiple repos:

  • what architecture this repository owns;
  • which general concepts it imports from InfoTechCanon;
  • which accepted records are policy sources;
  • which responsibilities belong to the permanent publisher; and
  • how inbound architecture requests become reviewed work.

Purpose fit

Strong fit. INTENT.md already names this repository as the Railiance framework architecture home. Clarifying semantic-canon, content-authority, and publication boundaries strengthens that purpose without adding an implementation layer.

Scope pressure

The demand exposed three current-scope gaps rather than a request to broaden the mission:

  1. INTENT.md and SCOPE.md did not distinguish InfoTechCanon authority, Railiance-specific authority, and policy-nexus publication.
  2. Eight accepted ADRs were discovered by policy-nexus but lacked required publication metadata and addressing.
  3. The repo had no explicit pre-work intake, so State Hub messages could be promoted to workplans without a durable purpose/scope review.

It also exposed housekeeping pressure: completed workplans remained in the active retrieval directory despite a repository-specific archive convention.

Evidence reviewed

  • INTENT.md, SCOPE.md, README.md, and .repo-classification.yaml
  • docs/adr/ADR-0001 through ADR-0008
  • schemas/, tools/, workplans/, and history/
  • InfoTechCanon ITC-REPO-LAYOUT 0.1.0-RC1 and consumer review kit
  • policy-nexus/INTENT.md, publication contract, and source inventory

Disposition

Accepted as RMASTER-WP-0024.

The work belongs here because it changes the architecture repository's own interfaces and source metadata. Downstream address selection and rendering are routed to policy-nexus; the publisher does not edit the source records.

Outcome

  • Intent and scope authority boundaries were corrected.
  • Repository-layout conformance became explicit and later advanced to core through the reviewed demand intake demonstrated by this record.
  • ADR source metadata became renderer-compatible; downstream publication remains separately owned.
  • Remaining alignment work is tracked in RMASTER-WP-0024 rather than inferred from the original request.