# Reef Production Readiness Contract
Date: 2026-07-26
Status: Adopted for the second implementation wave
## Purpose
Prevent a topology declaration from being mistaken for permission to run a
critical workload.
`hosts_rail` and `binds_rapp` describe intended composition. Production use
requires explicit readiness evidence.
## Admission States
Every hosted rail and bound `rapp` uses:
- `declared`
- `installed`
- `verified`
- `production-approved`
- `deprecated`
Promotion is monotonic only while its evidence remains current. Failed or
expired evidence returns the binding to the last proven state.
## Required Reef Evidence
Before a rail becomes `verified`, the reef must provide machine-readable
evidence for:
- substrate and Kubernetes version compatibility
- control-plane and workload capacity with documented headroom
- ingress, DNS, and certificate path
- storage and stateful-workload constraints
- workload identity and approved secret-delivery path
- network isolation and egress enforcement
- logs, metrics, traces, alerting, and audit delivery
- backup, restore, and rollback path
- upgrade and maintenance ownership
- failure-domain and recovery assumptions
## Critical Workload Gate
Before a critical, internet-facing, or high-value-credential workload becomes
`production-approved`, its binding must additionally record:
- threat-model reference
- availability, cold-start, and recovery objectives
- identity, secret revocation, and audit evidence
- negative authorization and network tests
- rollback and temporary-fallback rules
- accepted residual risks and their owner
The single-server and shared-control-plane risks of `reef-railiance` must be
explicitly accepted or mitigated for `rapp-qonto`; the reef name or `high`
criticality label is not evidence by itself.
## Mixed-Rail Rule
`reef-railiance` may host `rail-kubernetes` and `rail-knative` during the
second wave, while `rail-kubernetes` remains primary.
Reassess or split the reef when any of these triggers occurs:
- incompatible maintenance or upgrade windows
- inability to meet a critical workload recovery objective
- control-plane or workload resource contention
- materially different network or tenant-isolation requirements
- independent scaling or availability requirements
- failure in one rail cannot be contained from the other
- premium-security or regulatory policy requires a separate boundary
## Automation Requirement
Readiness evidence should be produced by idempotent probes and stored as
source-linked, timestamped records. Agents may execute and reconcile the
probes. Human approval should consume the evidence only where policy requires
explicit risk acceptance; it should not be used as a substitute for tests.