railiance-platform/docs/evidence/RAILIANCE-WP-0016-item13-restore-2026-08-15.md
codex 1eb5fa51ed
Some checks failed
CI Smoke / host-smoke (push) Successful in 0s
CI Smoke / container-smoke (push) Has been cancelled
Finish architecture-cleanup RAILIANCE-WP-0016 T05
Item 13 is the restore RESOURCE-WP-0002 already proved. Item 14 retires
the dead Bitnami postgresql-ha deploy path and gates Valkey until a
consumer exists. Item 17 publishes the versioned S3 consumer-interface
index.
2026-08-15 14:43:44 +02:00

1.2 KiB

Item 13 — restore proven end to end

Work record: architecture-cleanup RAILIANCE-WP-0016 item 13 Date: 2026-08-15 Status: done (unblocked by RESOURCE-WP-0002 finish)

The blocker was decision 9c21c0e0 / RESOURCE-WP-0002. That workplan is finished. The restore this item asked for was executed as RESOURCE-WP-0002-T05 on 2026-08-14 and is still true on the live cluster.

Production path (railiance01 platform-pg)

Fact Value
Destination s3://railiance-platform-pg-backup/platform-pg/
Endpoint https://s3.nl-ams.scw.cloud
Credential Secret databases/platform-pg-backup-s3 (keys present, values not read)
ScheduledBackup platform-pg-daily (02:15 UTC)
Completed Backups platform-pg-daily-20260814181421, platform-pg-daily-20260815021500

Full restore 65s (audit_core.events 30=30). PITR 65s (keep present, destroy absent). Evidence: resource-control/docs/evidence/RESOURCE-WP-0002-T05-restore-2026-08-14.md. Logical offsite copy: RESOURCE-WP-0002-T06.

This item is the S3-owned proof, not a second restore program. apps-pg is still local-path only (RAILIANCE-WP-0016 apps-pg evidence T02). Covering that cluster is a later consumer of the same bucket, not a re-opening of item 13.