Item 13 is the restore RESOURCE-WP-0002 already proved. Item 14 retires the dead Bitnami postgresql-ha deploy path and gates Valkey until a consumer exists. Item 17 publishes the versioned S3 consumer-interface index.
1.2 KiB
Item 13 — restore proven end to end
Work record: architecture-cleanup RAILIANCE-WP-0016 item 13
Date: 2026-08-15
Status: done (unblocked by RESOURCE-WP-0002 finish)
The blocker was decision 9c21c0e0 / RESOURCE-WP-0002. That workplan is
finished. The restore this item asked for was executed as
RESOURCE-WP-0002-T05 on 2026-08-14 and is still true on the live cluster.
Production path (railiance01 platform-pg)
| Fact | Value |
|---|---|
| Destination | s3://railiance-platform-pg-backup/platform-pg/ |
| Endpoint | https://s3.nl-ams.scw.cloud |
| Credential Secret | databases/platform-pg-backup-s3 (keys present, values not read) |
| ScheduledBackup | platform-pg-daily (02:15 UTC) |
| Completed Backups | platform-pg-daily-20260814181421, platform-pg-daily-20260815021500 |
Full restore 65s (audit_core.events 30=30). PITR 65s (keep present,
destroy absent). Evidence:
resource-control/docs/evidence/RESOURCE-WP-0002-T05-restore-2026-08-14.md.
Logical offsite copy: RESOURCE-WP-0002-T06.
This item is the S3-owned proof, not a second restore program. apps-pg
is still local-path only (RAILIANCE-WP-0016 apps-pg evidence T02). Covering
that cluster is a later consumer of the same bucket, not a re-opening of
item 13.