railiance-platform/workplans/archived/260905-RPF-WP-0033-fluid-telegram-operator-kv-design.md
codex 9f83e426c7 Consolidate platform workplans and assess intent gaps
Assistant: codex
Assistant-Model: gpt-6-astra
Assistant-Session: 01a06ecb-456a-71c2-b41e-0755d336e883
2026-09-05 11:14:42 +02:00

1.9 KiB

id type title domain repo status owner created updated state_hub_workstream_id
RPF-WP-0033 workplan Design fluid-telegram attended operator KV lane financials railiance-platform finished codex 2026-09-05 2026-09-05 957d49b9-6b84-5fde-89d0-4c2efef70067

Design fluid-telegram attended operator KV lane

Prepare the platform design

id: RPF-WP-0033-T01
status: done
priority: high
state_hub_task_id: "6d305189-61f3-5750-8e4f-5cd97b92f324"

Reviewed owner source and the current platform CCR contract. Delivered docs/credential-lane-designs/fluid-telegram-operator-kv.md with proposed exact scope, custody, lifecycle, implementation gaps, approval requirements and positive/negative acceptance evidence. This is a completed design deliverable, not a live lane or approval. No secrets accessed, production objects changed or owner messages sent.

Obtain owner inputs and implement the approved lane

id: RPF-WP-0033-T02
status: cancel
priority: high
state_hub_task_id: "a542697f-adf8-59ac-9704-0bcde1d9fd0f"

Obtain tenant/group/MFA decisions; extend the CCR schema, validator, renderer and ops-mason executor for the exact four-entry matrix; correct the consumer tenant default, atomic salt creation and preflight output. Complete an attended installed-engine probe and boundary checks before any routing activation.

Review the linked design and pin current source revisions before implementation. Do not interpret this workplan or a proposed coordinate as live authorization.

Portfolio review — 2026-09-05

The design deliverable is complete. The implementation obligation is preserved in RPF-WP-0035-T03, the single credential-lane implementation queue. T02 is cancel here only because it is superseded there; it is not implemented, waived or externally accepted. The approved design scope and all existing identifiers remain unchanged. Archived on 2026-09-05 after this consolidation.