railiance-telemetry/workplans/RTELE-WP-0001-statehub-bootstrap.md
tegwick aa59e805ba derive state hub identifiers
Assistant: codex
Assistant-Model: gpt-5.6-sol
Assistant-Session: 01a053ff-1d6f-7fe2-ac1c-a6eb40a42a0c
2026-08-31 19:15:10 +02:00

2.2 KiB

id type title domain repo status owner topic_slug created updated related state_hub_workstream_id
RTELE-WP-0001 workplan Bootstrap State Hub integration financials railiance-telemetry proposed codex railiance 2026-08-11 2026-08-15
ADR-0008
RMASTER-WP-0023
3acd587b-3ac6-5eee-af31-05170ff8bcf7

Bootstrap State Hub integration

Goal

Finish State Hub onboarding for railiance-telemetry: confirm the generated contract files, record that this repo has no runtime yet, and seed the first signal-contract workplan. Do not deploy a monitoring stack here. Placement is Quality / Q2 (INTENT/SCOPE). That is not an open railiance-master question.

This id uses the historical RAILIANCE-WP- prefix. New telemetry workplans use RTEL-WP-. Do not change this file's id or hub UUID.

Review Generated Integration Files

id: RTELE-WP-0001-T01
status: todo
priority: high
state_hub_task_id: "4aca4677-6712-553b-ac26-0682fdf211de"

Confirm INTENT/SCOPE/AGENTS match the seeded Q2 evidence-plane boundary. Close leftover README contradictions (placement is Q2, not an open S3-vs-Quality question). Set the next workplan prefix to RTEL-WP-, not RAILIANCE-WP-.

Verify Local Developer Workflow

id: RTELE-WP-0001-T02
status: todo
priority: high
state_hub_task_id: "b6632ce1-dc84-532d-b277-adce8510a304"

There is no implementation yet. Record that in AGENTS.md (no install / test / run). Do not invent a Makefile that deploys monitoring. T03 owns the first verification command.

Seed First Real Workplan

id: RTELE-WP-0001-T03
status: todo
priority: medium
state_hub_task_id: "4877f6e2-8298-5bab-b6a8-9a1ec1718289"

Seed RTEL-WP-0002 for the emission contract: what other layers emit, retention for restore/rollout proof, and the operator-facing health surface. Out of that plan: the deployable monitoring package (future rapp-*), conformance meaning (owning repos / railiance-master), and any public scrape/UI (forbidden until ADR-0006 production-approved plus an ADR-0008 grant; default exposure is private).

After workplan file updates, run the sync locally from this repo checkout:

statehub fix-consistency