Planning and registration evidence — 2026-10-13
Requested boundary
Reviewed content-explorer demand, recorded the provider intent and sibling-derived workplans, registered this repository, and notified reuse-surface. Implementation and deployment remain future work. No browser trial was run or represented as run.
Registration and projection
- Repository:
rapp-playwright, UUID23355f26-7ee1-4036-8c63-3ae78e3072bf. - Domain/topic:
infotech/stack, topic UUID595afc64-bd28-47bf-aafb-ba230b28371b. - Classification: tooling; secondary domain agents. Validated against the current custodian allowed-values file and read back from State Hub after registration.
- Forge remote:
forgejo-remote:coulomb/rapp-playwright. - Host observation:
bnt-lap001→/home/worsch/rapp-playwright. - Initial published planning revision:
73313606665e9c18b32d3c933b11af5e46ef856d.rmgr sync --pushreturnedapplied, primary/railiance01, with identical expected and derived commits, four created plans, three resolved dependency edges, no refused records and no unresolved edges. No local-only projection was accepted as a substitute. - Independent REST readback matched all four plan IDs, repository bindings and statuses and all 13 task IDs/states against local files. The initial bootstrap was active during this readback; final completion is synchronized separately.
Final completion revision 4efabd60ec23faf7a89d60f7403ea10a4116e845 was published
and reconciled on primary/railiance01 with identical expected/derived commits.
The sync receipt records applied, no refused
records and no unresolved edges. A fresh API readback verified WP-0001 finished
with three done tasks, WP-0002/0003/0004 proposed with ten todo tasks, the tooling
classification, and the persisted reuse-surface notification. Session-close
progress is recorded as c30f5277-042a-455d-9068-c25873d192e6.
Checks
- Parsed all frontmatter and fenced task YAML; verified unique IDs and expected
repo/domain/topic values. All ten future delivery tasks remain
todoin threeproposedplans. - Validated classification without errors or warnings, checked local Markdown
links including cited sibling evidence, checked template expansion and ran
git diff --check. - A separate
statehub fix-consistency --repo rapp-playwright --jsonaudit found zero failures and zero automation errors. It regenerated the missing index and refreshed the offline brief. Two standing notices were subsequently read and acknowledged. Its generated-only commit was rejected by the local hook; generated files are included with the substantive bootstrap completion record. - No install/build/runtime tests apply to this planning-only checkout.
Reuse-surface notification
Initial TAMQ message: m-dccbea4a-ac16-410e-a167-2d2dd8cc27a6. Inspection showed
pending, no active service or endpoint, and no delivery acknowledgment.
Final State Hub message: b6a965ed-c02b-49f2-9272-c234e7c8f6a1, from
rapp-playwright to reuse-surface. Its persisted receipt
contains the provider references, repository UUID, proposed workplan UUIDs,
published revision and the explicit planned-only availability boundary.
The message asks reuse-surface to retain the existing capability ID and evidence
vector, attach the provider plans, and retain ownership of registry relevance
defects. Delivery to the persistent inbox is verified; owner acknowledgment and
subsequent registry edits are not claimed.
Remaining delivery
WP-0002: contract and trial design. WP-0003: service and package implementation. WP-0004: managed runtime and independent consumer verification, followed by an evidence-backed discovery update. Content-explorer retains acceptance of its own screenshot/keyboard task. These are proposed follow-on work, outside the requested bootstrap stopping point.