rein-aharness/workplans/REINAH-WP-0006-binky-weekly-review-approach.md
codex 7c8f7e6a9e fix(workplans): move work-record identifiers onto the repository prefix
Identifiers predating the PREFIX-WP-NNNN convention were rejected by the canon
registry, so none of this repository's work records could be registered.

One prefix per repository (ADR-007). Existing conforming identifiers keep their
numbers where possible; the pre-convention records take the next free numbers
rather than renumbering work that was already correct.

Projection UUIDs are re-derived from the new canonical ids (ADR-007 decision 2).
Nothing was registered on central under the old identifiers, so no hub record is
orphaned by this.

Refs CUST-WP-0068-T03

Assistant: claude-code
Assistant-Model: opus
Assistant-Process: 2583210@bnt-lap001
Assistant-Session: f2bff2d5-e9b2-4338-92ca-10282a927006
2026-08-25 22:42:27 +02:00

3.6 KiB

id type title domain repo status owner topic_slug priority created updated origin origin_ref related state_hub_workstream_id
REINAH-WP-0006 workplan Binky weekly founder-review ops-run approach agents rein-aharness finished codex rein-aharness medium 2026-08-08 2026-08-08 residual REIN-A-0002
REIN-A-0002
AWQ-011
84f3f979-8788-5b25-a269-d855282af4c6

REINAH-WP-0006 — Binky weekly founder-review ops-run approach

Origin

Production evidence gathered while closing REIN-A-0002 showed ops run 76b03314-99a4-42e4-aff5-3aa0be43787c fail safely on 2026-08-07 because the static approach registry has no match for labels binky, weekly-review, and automated (definition 42cb3992-1a31-50d8-94bd-2c430acd89b5).

This is outside REIN-A-0002's FI/Binky daily timer cutover and is handed off as a live residual rather than extending that finished scope.

Goal

Define, implement, test, and deploy the cheapest correct approach for Binky's weekly founder-review ops run, including its domain completion event.

Determine the weekly-review contract and approach

id: REINAH-WP-0006-T01
status: done
priority: high
state_hub_task_id: "73557788-4967-51b3-a0fb-7fd0e6b731f6"

Inspect the activity-core definition and Binky weekly-review contract. Decide whether an existing deterministic command can satisfy it or a new structured executor is required. Record required inputs, output, and completion event.

Decision (2026-08-08): implement brief-weekly as structured llm-connect generation plus a deterministic markdown applier; never use a host coding-agent session. Inputs are the review week's daily briefs, SuccessMilestones.md, DecisionQueue.md, RiskRegister.md, WORK-RECORDS.md, the previous weekly review, and recent git history. Output is briefs/YYYY-MM-DD-weekly-founder-review.md, committed idempotently, followed by a binky_weekly_review progress event. Code derives milestone movement and the RISK-005 clear|watch|escalate|quiet state; model output cannot override those facts. Binky residual intake AWQ-011 is the upstream work record.

Implement and test the registry entry

id: REINAH-WP-0006-T02
status: done
priority: high
state_hub_task_id: "23975c42-0dcb-58fc-85e4-5837d846e1d2"

Add the selected approach and pure registry mapping for weekly-review plus Binky. Cover execution success, domain completion, and explicit failure.

Depends on: REINAH-WP-0006-T01.

Implemented 2026-08-08: brief_weekly structured generation, deterministic milestone/RISK-005 signals, idempotent markdown apply + commit, CLI brief-weekly, approach registry dispatch, completion event, and tests. Full suite: 87 passed.

Deploy and prove one production cycle

id: REINAH-WP-0006-T03
status: done
priority: medium
state_hub_task_id: "b6f0ae25-6df5-5f2e-a9b4-b9deb2e59489"

Deploy the approach to the production claim loop, trigger or observe one run, and record an openclaimedsucceeded proof with its domain event.

Depends on: REINAH-WP-0006-T02.

Production proof 2026-08-08: deployed rein-aharness 8e98ead to railiance01 and manually triggered activity definition 42cb3992-1a31-50d8-94bd-2c430acd89b5. Ops run ad0b05c4-8ad8-40c7-9985-75481728ae30 was claimed as brief-weekly, called llm-connect successfully, posted binky_weekly_review (HTTP 201), committed briefs/2026-08-08-weekly-founder-review.md as Binky commit 27156d6, and completed succeeded. The deterministic result escalated RISK-005 after two active milestone-free review cycles. Upstream intake AWQ-011 was closed with outcome promoted to this workplan.