- INTENT.md: three-layer model (blueprint/instance/harness), single shared runtime, never-become boundaries - ADR-001 (accepted): DEC-2026-002 resolution — one harness repo for all projects; instances are declarative state in consuming repos - docs/architecture.md: components, contracts (manifest, tool profiles, completion events, credential lanes), deployment shape - agent_harness/: executor-worker prototype adopted and renamed (6/6 tests green); HARNESS-WP-0001 initial workplan (7 tasks) Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2.8 KiB
| id | title | status |
|---|---|---|
| HARNESS-WP-0001 | Harness Foundation: from prototype to shared runtime | active |
Turn the adopted executor-worker prototype into the single shared agent runtime per ADR-001 / DEC-2026-002. Tenant #1 is binky-control; its cutover (BINKY-WP-0004-T06) gates on T06 here. Boundaries per INTENT.md: no scheduling, no blueprint authoring, no tenant-specific logic.
Task: Instance manifest spec and validation
Specify the declarative instance manifest (extends ADR-005
.kaizen/schedule.yml): blueprint, cadence, enabled, lane, tool_profile
(by name), budget, pinned harness major. Implement agent-harness validate --target <repo> mirroring kaizen's schedule validate. Align
the schema with kaizen-agentic owners (their file, our extra keys — or a
sibling manifest if they prefer separation).
id: HARNESS-WP-0001-T01
status: todo
priority: high
Task: Named tool profiles
Central tool-profile registry (seed: green-commit-only from the
prototype allow-list; add blue-mail-triage). Manifests reference
profiles by name; the runner resolves and enforces them. Unknown profile
= refuse to run.
id: HARNESS-WP-0001-T02
status: todo
priority: high
Task: Task intake from activity-core emission
Replace the JSON task-file MVP source with polling the issue-core REST sink (or TaskExecutorWorkflow handoff) for emitted tasks labeled for the harness; map emissions to TaskSpec. Keep the task-file path for local development.
id: HARNESS-WP-0001-T03
status: todo
priority: high
Task: Kaizen metrics emission per run
After each run, write .kaizen/metrics records in the target repo
(tokens, duration, ok/failed, commit) so the kaizen optimization loop
observes harness-run agents. Follow kaizen-agentic's metrics conventions
(ADR-004).
id: HARNESS-WP-0001-T04
status: todo
priority: medium
Task: Budget enforcement
Wire llm-connect's BudgetTracker to the manifest budget field; refuse
or truncate runs over budget and report the event to the hub (token
events feed the Token Cost dashboard).
id: HARNESS-WP-0001-T05
status: todo
priority: medium
Task: Railiance deployment
Package (container per llm-connect/activity-core conventions) and deploy
one harness instance on Railiance. Gated on founder Red-lane secret
provisioning (binky-control integrations/executor-worker-secrets.md
Lanes 2–3). Verify the sandbox smoke task end-to-end remotely; hub via
:18000 bridge.
id: HARNESS-WP-0001-T06
status: todo
priority: high
Task: Tenant #1 onboarding — binky-control
Commit binky-control's instance manifest (daily rhythm, weekly mail intake, weekly review prep on the T01 schema), run the three definitions through the deployed harness, then hand off to BINKY-WP-0004-T06 for the cron-bridge cutover.
id: HARNESS-WP-0001-T07
status: todo
priority: medium